Environmental Impacts Statements; Notice of Availability, 55842-55843 [E8-22682]
Download as PDF
55842
Federal Register / Vol. 73, No. 188 / Friday, September 26, 2008 / Notices
Dated: September 18, 2008.
Michael F. Gearheard,
Director, Office of Water and Watersheds,
Region 10.
[FR Doc. E8–22553 Filed 9–25–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8586–1]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7146. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in FR dated April 6, 2008 (73 FR 19833).
jlentini on PROD1PC65 with NOTICES
Draft EISs
EIS No. 20080240, ERP No. D–BLM–
A09825–00, PROGRAMMATIC—
Geothermal Leasing in the Western
United States.
Summary: EPA expressed
environmental concerns about impacts
to air quality, groundwater and noise.
Rating EC2.
Final EISs
EIS No. 20080275, ERP No. F–NOA–
L39066–WA, ADOPTION—Fish
Passage and Aquatic Habitat
Restoration at Hemlock Dam,
Implementation, Gifford Pinchot
National Forest, Mount Adams
District, Skamania County, WA.
Summary: No comment letter sent to
the federal agency.
EIS No. 20080295, ERP No. F–FHW–
C40171–NY, NYS Route 17 at Exit 122
Interchange Project, To Improve the
Safety and Operation, Right-of-Way
Acquisition, Town of Wallkill, Orange
County, NY.
Summary: EPA continues to have
environmental concerns about wetland,
water quality, and air quality impacts.
EIS No. 20080300, ERP No. F–BLM–
K65296–AZ, Agua Fria National
Monument and BradshawHarquahala, Proposed Resource
Management Plan, Implementation,
Yavapai County, AZ.
Summary: EPA does not object to the
proposed project.
EIS No. 20080308, ERP No. F–SFW–
L61233–WA, Hanford Reach National
VerDate Aug<31>2005
18:07 Sep 25, 2008
Jkt 214001
Monument Comprehensive
Conservation Plan, Management of
Monument Resources, Programs and
Visitors for the Next 15 Years, Adams,
Benton, Franklin and Grant Counties,
WA.
Summary: No formal comment letter
was sent to the preparing agency.
Dated: September 23, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–22681 Filed 9–25–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8585–9]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 09/15/2008 Through 09/19/2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080364, Draft Supplement,
NPS, GA, Chattahoochee River
National Recreation Area General
Management Plan, Updated
Information on Analyzing Six
Alternative Future Directions for the
Management and Use of
Chattachoochee River National
Recreation Area, Implementation,
Chattahoochee River, Atlanta, GA,
Comment Period Ends: 11/10/2008,
Contact: David Libman 404–562–3124
Ext. 685.
EIS No. 20080365, Draft EIS, NPS, NY,
Fort Stanwix National Monument
General Management Plan,
Implementation, Funding, City of
Rome, Oneida County, NY, Comment
Period Ends: 11/25/2008, Contact:
James O’Connell 617–223–5222.
EIS No. 20080366, Final EIS, AFS, MT,
Butte Resource Management Plan,
Implementation, Beaverhead,
Broadwater, Deerlodge, Gallatin,
Jefferson, Lewis and Clark, Silver Bow
and Park Counties, MT, Wait Period
Ends: 10/27/2008, Contact: Brenda
Williams 202–452–5112.
EIS No. 20080367, Final EIS, FHW, UT,
Mountain View Corridor (MVC)
Project, Proposed Transportation
Improvement 2030 Travel Demand in
Western Salt Lake County south of I–
80 and west of Bangerter Highway
and in northwestern Utah County of
I–15, south of the Salt Lake County
Line, and north of Utah Lake, Salt
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
Lake and Utah County, UT, Wait
Period Ends: 10/27/2008, Contact:
Edward Woolford 801–963–0182.
EIS No. 20080368, Final EIS, AFS, MT,
Debaugan Fuels Reduction Project,
Proposed Fuels Reduction Activities,
Lolo National Forest, Superior Ranger
District, Mineral County, MT, Wait
Period Ends: 10/27/2008, Contact:
Sharon Sweeney 406–822–4233.
EIS No. 20080369, Draft EIS, FAA, FL,
Palm Beach International Airport
Project, Construction and Operation
of Proposed Airfield Improvements,
Funding, Palm Beach County, FL,
Comment Period Ends: 11/24/2008,
Contact: Lindy McDowell 407–812–
6331 Ext. 130.
EIS No. 20080370, Draft EIS, AFS, CA,
Gemmill Thin Project, Proposal to
Reduce the Intensity and Size of
Future Wildfires, and to Maintain/
Improve Ecosystem Function and
Wildlife Habitat, Chanchellula LateSuccessional Reserve, Shasta-Trinity
National Forest, Trinity County, CA,
Comment Period Ends: 11/10/2008,
Contact: Bobbie A. Dimonte 530–226–
2425.
EIS No. 20080371, Final EIS, FAA, TX,
ADOPTION—Northwest Corridor
Light Rail Transit Line (LRT) to
Irving/Dallas/Fort Worth International
Airport, Construction, Dallas County,
TX, Contact: Peggy Wade 817–222–
5697.
The U.S. Department of
Transportation’s Federal Aviation
Administration (DOT/FAA) has
ADOPTED the U.S. Department of
Transportation’s Federal Transit
Administration FEIS #2080289, filed on
07/24/2008. DOT/FAA was a
Cooperating Agency for the above
project. Recirculation of the FEIS is not
necessary under 40 CFR 1506.3(c).
EIS No. 20080372, Draft EIS, AFS, ID,
Salmon-Challis National Forest
(SCNF), Proposes Travel Planning and
OHV Route Designation, Lemhi,
Custer and Butte Counties, ID,
Comment Period Ends: 11/25/2008,
Contact: Karen Gallogly 208–756–
5103.
EIS No. 20080373, Final EIS, FHW, NC,
NC 12 Replacement of Herbert C.
Bonner Bridge (Bridge No. 11)
Revisions and Additions, over Oregon
Inlet Construction, Funding, U.S.
Coast Guard Permit, Special-UsePermit, Right-of-Way Permit, U.S.
Army COE Section 10 and 404 Permit,
Dare County, NC, Wait Period Ends:
10/27/2008, Contact: John F. Sullivan
III P.E. 919–747–7000.
EIS No. 20080374, Draft EIS, FAA, PA,
Philadelphia International Airport
(PHL) Capacity Enhancement Program
E:\FR\FM\26SEN1.SGM
26SEN1
55843
Federal Register / Vol. 73, No. 188 / Friday, September 26, 2008 / Notices
(CEP) To Accommodate Current and
Future Aviation Demand, Funding
and U.S. Army COE Section 404
Permit, Philadelphia, PA, Comment
Period Ends: 11/10/2008, Contact:
Susan McDonald 717–730–2841.
EIS No. 20080375, Draft EIS, NOA, 00,
Amendment 3 to the Northeast Skate
Complex Fishery Management Plan,
Implementation of New Management
Measures to Rebuild Overfished Skate
Stocks, End Overfishing of Skate
Fisheries, Gulf of Maine (GOM),
Georges Bank (GB), South New
England and Mid-Atlantic Regions,
Comment Period Ends: 11/10/2008,
Contact: Tobey Curtis 978–281–9288.
EIS No. 20080376, Final EIS, NOA, CA,
Cordell Bank, Gulf of the Farallones
and Monterey Bay National Marine
Sanctuaries, Proposes a Series of
Regulatory Changes, Offshore of
Northern/Central CA, Wait Period
Ends: 10/27/2008, Contact: John
Armor 301–713–3125.
EIS No. 20080377, Final EIS, AFS, MT,
Sheppard Creek Post-Fire Project,
Timber Salvage, Implementation,
Flathead National Forest, Flathead
and Lincoln Counties, MT, Wait
Period Ends: 10/27/2008, Contact:
Bryan Donner 406–758–3508.
EIS No. 20080378, Final EIS, COE, MD,
Mid-Chesapeake Bay Island
Ecosystem Restoration Integrated
Feasibility Study, Using
Trans No.
Uncontaminated Dredged Material
from the Upper Chesapeake Bay
Approach Channel to the Port of
Baltimore to Restore and Protect
Island Habitat in the Middle Portion
of Chesapeake Bay, Dorchester
County, MD, Wait Period Ends: 10/27/
2008, Contact: Dr. Angie Sowers 410–
962–7440.
EIS No. 20080379, Final EIS, AFS, NM,
Santa Fe National Forest Plan
Amendment for Oil & Gas Leasing and
Roads Management, Implementation,
San Juan Basin, Cuba Ranger District,
NM, Wait Period Ends: 10/27/2008,
Contact: Allen Fowler 505–438–7821.
EIS No. 20080380, Final EIS, AFS, CA.
Amended Notices
EIS No. 20080353, Draft Supplement,
AFS, 00, Gypsy Moth Management in
the United States: A Cooperative
Approach, Proposing New Treatments
that were not Available when the
1995 EIS was written, U.S., Comment
Period Ends: 11/17/2008, Contact:
William Oldland 304–285–1585.
Revision to FR Notice Published 09/
19/2008: Extending Comment Period
from 11/03/2008 to 11/17/2008.
Dated: September 23, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–22682 Filed 9–25–08; 8:45 am]
FEDERAL TRADE COMMISSION
Granting of Request for Early
Termination of the Waiting Period
Under the Premerger Notification
Rules
Section 7A of the Clayton Act, 15
U.S.C. 18a, as added by Title II of the
Hart-Scott Rodino Antitrust
Improvements Act of 1976, requires
persons contemplating certain mergers
or acquisitions to give the Federal Trade
Commission and the Assistant Attorney
General advance notice and to wait
designated periods before
consummation of such plans. Section
7A(b)(2) of the Act permits the agencies,
in individual cases, to terminate this
waiting period prior to its expiration
and requires that notice of this action be
published in the Federal Register.
The following transactions were
granted early termination of the waiting
period provided by law and the
premerger notification rules. The grants
were made by the Federal Trade
Commission and the Assistant Attorney
General for the Antitrust Division of the
Department of Justice. Neither agency
intends to take any action with respect
to these proposed acquisitions during
the applicable waiting period.
BILLING CODE 6560–50–P
Acquiring
Acquired
Entities
Transactions Granted Early Termination—07/21/2008
20081459 ...........
20081464 ...........
Prism Holding Corporation .....................
Quicksilver Resources Inc .....................
Passport Holding Corporation ................
The Perot Investment Trust I .................
20081469 ...........
20081487 ...........
Duke Energy Corporation ......................
Allied World Assurance Company Holdings Ltd.
Health Care Service Corporation ...........
Diamond Castle Partners IV, L.P ..........
Alleghany Corporation ...........................
Passport Holding Corporation.
Hillwood Oil Gas, L.P
Nortex Minerals, L.P.
Catamount Energy Corporation.
Darwin Professional Underwriters, Inc.
MEDecision, Inc .....................................
MEDecision, Inc.
20081490 ...........
Transactions Granted Early Termination—07/22/2008
20081403
20081430
20081433
20081434
...........
...........
...........
...........
NTR plc ..................................................
Flowers Foods, Inc ................................
Sageview Capital Master, L.P ...............
Flowers Foods, Inc ................................
Green Plains Renewable Energy, Inc ...
Lloyd Edward Eisele, Jr .........................
Invitrogen Corporation ...........................
C&G Holdings, Inc .................................
Green Plains Renewable Energy, Inc.
Holsum Bakery, Inc.
Invitrogen Corporation.
C&G Holdings, Inc.
Transactions Granted Early Termination—07/24/2008
20081470 ...........
LTX Corporation .....................................
Credence Systems Corp ........................
Credence Systems Corp.
Transactions Granted Early Termination—07/28/2008
jlentini on PROD1PC65 with NOTICES
20081437 ...........
20081438 ...........
Parexel International Corporation ..........
Newco ....................................................
ClinPhone plc .........................................
David H. Domsife ...................................
20081439 ...........
Newco ....................................................
Dorothy H. Jernstedt ..............................
20081443
20081457
20081488
20081495
AT&T Inc ................................................
GTCR Fund VII, L.P ..............................
EGI-Fund (08–10) Investors, L.L.C .......
Audax Private Equity Fund III, L.P ........
Dennis L. O’Neill ....................................
GTC Biotherapeutics, Inc .......................
MiddleBrook Pharmaceuticals, Inc ........
Hamid Mirafzali and Shadan Mirafzali ...
...........
...........
...........
...........
VerDate Aug<31>2005
18:07 Sep 25, 2008
Jkt 214001
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
E:\FR\FM\26SEN1.SGM
ClinPhone plc.
Gillig Corporation Herrick-Pacific Corporation.
Gillig Corporation Herrick-Pacific Corporation.
MilkyWay Broadband, LLC.
GTC Biotherapeutics, Inc.
MiddleBrook Pharmaceuticals, Inc.
MiraMed Global Services, Inc.
26SEN1
Agencies
[Federal Register Volume 73, Number 188 (Friday, September 26, 2008)]
[Notices]
[Pages 55842-55843]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-22682]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8585-9]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 09/15/2008 Through 09/19/2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080364, Draft Supplement, NPS, GA, Chattahoochee River
National Recreation Area General Management Plan, Updated Information
on Analyzing Six Alternative Future Directions for the Management and
Use of Chattachoochee River National Recreation Area, Implementation,
Chattahoochee River, Atlanta, GA, Comment Period Ends: 11/10/2008,
Contact: David Libman 404-562-3124 Ext. 685.
EIS No. 20080365, Draft EIS, NPS, NY, Fort Stanwix National Monument
General Management Plan, Implementation, Funding, City of Rome, Oneida
County, NY, Comment Period Ends: 11/25/2008, Contact: James O'Connell
617-223-5222.
EIS No. 20080366, Final EIS, AFS, MT, Butte Resource Management Plan,
Implementation, Beaverhead, Broadwater, Deerlodge, Gallatin, Jefferson,
Lewis and Clark, Silver Bow and Park Counties, MT, Wait Period Ends:
10/27/2008, Contact: Brenda Williams 202-452-5112.
EIS No. 20080367, Final EIS, FHW, UT, Mountain View Corridor (MVC)
Project, Proposed Transportation Improvement 2030 Travel Demand in
Western Salt Lake County south of I-80 and west of Bangerter Highway
and in northwestern Utah County of I-15, south of the Salt Lake County
Line, and north of Utah Lake, Salt Lake and Utah County, UT, Wait
Period Ends: 10/27/2008, Contact: Edward Woolford 801-963-0182.
EIS No. 20080368, Final EIS, AFS, MT, Debaugan Fuels Reduction Project,
Proposed Fuels Reduction Activities, Lolo National Forest, Superior
Ranger District, Mineral County, MT, Wait Period Ends: 10/27/2008,
Contact: Sharon Sweeney 406-822-4233.
EIS No. 20080369, Draft EIS, FAA, FL, Palm Beach International Airport
Project, Construction and Operation of Proposed Airfield Improvements,
Funding, Palm Beach County, FL, Comment Period Ends: 11/24/2008,
Contact: Lindy McDowell 407-812-6331 Ext. 130.
EIS No. 20080370, Draft EIS, AFS, CA, Gemmill Thin Project, Proposal to
Reduce the Intensity and Size of Future Wildfires, and to Maintain/
Improve Ecosystem Function and Wildlife Habitat, Chanchellula Late-
Successional Reserve, Shasta-Trinity National Forest, Trinity County,
CA, Comment Period Ends: 11/10/2008, Contact: Bobbie A. Dimonte 530-
226-2425.
EIS No. 20080371, Final EIS, FAA, TX, ADOPTION--Northwest Corridor
Light Rail Transit Line (LRT) to Irving/Dallas/Fort Worth International
Airport, Construction, Dallas County, TX, Contact: Peggy Wade 817-222-
5697.
The U.S. Department of Transportation's Federal Aviation
Administration (DOT/FAA) has ADOPTED the U.S. Department of
Transportation's Federal Transit Administration FEIS 2080289,
filed on 07/24/2008. DOT/FAA was a Cooperating Agency for the above
project. Recirculation of the FEIS is not necessary under 40 CFR
1506.3(c).
EIS No. 20080372, Draft EIS, AFS, ID, Salmon-Challis National Forest
(SCNF), Proposes Travel Planning and OHV Route Designation, Lemhi,
Custer and Butte Counties, ID, Comment Period Ends: 11/25/2008,
Contact: Karen Gallogly 208-756-5103.
EIS No. 20080373, Final EIS, FHW, NC, NC 12 Replacement of Herbert C.
Bonner Bridge (Bridge No. 11) Revisions and Additions, over Oregon
Inlet Construction, Funding, U.S. Coast Guard Permit, Special-Use-
Permit, Right-of-Way Permit, U.S. Army COE Section 10 and 404 Permit,
Dare County, NC, Wait Period Ends: 10/27/2008, Contact: John F.
Sullivan III P.E. 919-747-7000.
EIS No. 20080374, Draft EIS, FAA, PA, Philadelphia International
Airport (PHL) Capacity Enhancement Program
[[Page 55843]]
(CEP) To Accommodate Current and Future Aviation Demand, Funding and
U.S. Army COE Section 404 Permit, Philadelphia, PA, Comment Period
Ends: 11/10/2008, Contact: Susan McDonald 717-730-2841.
EIS No. 20080375, Draft EIS, NOA, 00, Amendment 3 to the Northeast
Skate Complex Fishery Management Plan, Implementation of New Management
Measures to Rebuild Overfished Skate Stocks, End Overfishing of Skate
Fisheries, Gulf of Maine (GOM), Georges Bank (GB), South New England
and Mid-Atlantic Regions, Comment Period Ends: 11/10/2008, Contact:
Tobey Curtis 978-281-9288.
EIS No. 20080376, Final EIS, NOA, CA, Cordell Bank, Gulf of the
Farallones and Monterey Bay National Marine Sanctuaries, Proposes a
Series of Regulatory Changes, Offshore of Northern/Central CA, Wait
Period Ends: 10/27/2008, Contact: John Armor 301-713-3125.
EIS No. 20080377, Final EIS, AFS, MT, Sheppard Creek Post-Fire Project,
Timber Salvage, Implementation, Flathead National Forest, Flathead and
Lincoln Counties, MT, Wait Period Ends: 10/27/2008, Contact: Bryan
Donner 406-758-3508.
EIS No. 20080378, Final EIS, COE, MD, Mid-Chesapeake Bay Island
Ecosystem Restoration Integrated Feasibility Study, Using
Uncontaminated Dredged Material from the Upper Chesapeake Bay Approach
Channel to the Port of Baltimore to Restore and Protect Island Habitat
in the Middle Portion of Chesapeake Bay, Dorchester County, MD, Wait
Period Ends: 10/27/2008, Contact: Dr. Angie Sowers 410-962-7440.
EIS No. 20080379, Final EIS, AFS, NM, Santa Fe National Forest Plan
Amendment for Oil & Gas Leasing and Roads Management, Implementation,
San Juan Basin, Cuba Ranger District, NM, Wait Period Ends: 10/27/2008,
Contact: Allen Fowler 505-438-7821.
EIS No. 20080380, Final EIS, AFS, CA.
Amended Notices
EIS No. 20080353, Draft Supplement, AFS, 00, Gypsy Moth Management in
the United States: A Cooperative Approach, Proposing New Treatments
that were not Available when the 1995 EIS was written, U.S., Comment
Period Ends: 11/17/2008, Contact: William Oldland 304-285-1585.
Revision to FR Notice Published 09/19/2008: Extending Comment
Period from 11/03/2008 to 11/17/2008.
Dated: September 23, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E8-22682 Filed 9-25-08; 8:45 am]
BILLING CODE 6560-50-P