Combined Notice of Filings, 55831 [E8-22680]
Download as PDF
Federal Register / Vol. 73, No. 188 / Friday, September 26, 2008 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
jlentini on PROD1PC65 with NOTICES
September 23, 2008.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP00–426–038.
Applicants: Texas Gas Transmission,
LLC.
Description: Texas Gas Transmission
LLC submits Original Sheet 55G et al to
FERC Gas Tariff, Second Revised
Volume 1.
Filed Date: 09/12/2008.
Accession Number: 20080916–0029.
Comment Date: 5 p.m. Eastern Time
on Friday, September 26, 2008.
Docket Numbers: RP08–628–000.
Applicants: CenterPoint Energy—
Mississippi River Transmission
Corporation.
Description: CenterPoint Energy—
Mississippi River Transmission
Corporation submits Sixty-Fourth
Revised Sheet 5 et al to FERC Gas Tariff,
Third Revised Volume 1, to be effective
11/1/08.
Filed Date: 09/22/2008.
Accession Number: 20080922–0261.
Comment Date: 5 p.m. Eastern Time
on Monday, October 06, 2008.
Docket Numbers: RP08–629–000.
Applicants: Dominion Cove Point
LNG, LP.
Description: Report of Revenue
Crediting of Dominion Cove Point LNG,
LP.
Filed Date: 09/22/2008.
Accession Number: 20080922–5097.
Comment Date: 5 p.m. Eastern Time
on Monday, October 06, 2008.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
VerDate Aug<31>2005
18:07 Sep 25, 2008
Jkt 214001
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8–22680 Filed 9–25–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–444–000; Docket No.
CP07–441–000]
Jordan Cove Energy Project, L.P.;
Pacific Connector Gas Pipeline
Project, L.P.; Notice of Public Meetings
To Take Comments on the Draft
Environmental Impact Statement for
the Proposed Jordan Cove Energy and
Pacific Connector Gas Pipeline Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) is issuing this notice to
announce a series of public meetings to
take comments on the draft
Environmental Impact Statement (EIS)
issued by the FERC on August 29, 2008,
for the proposed Jordan Cove Energy
liquefied natural gas (LNG) Project and
Pacific Connector Gas Pipeline Project.
The draft EIS addresses the proposal by
Frm 00021
Fmt 4703
Jordan Cove Energy Project, L.P. (Jordan
Cove) to construct and operate an LNG
import terminal on Coos Bay in Coos
County, Oregon, in Docket No. CP07–
444–000, and the proposal by Pacific
Connector Gas Pipeline, L.P. to
construct a 230-mile-long natural gas
sendout pipeline that would cross
portions of Coos, Douglas, Jackson, and
Klamath Counties, Oregon, in Docket
No. CP07–441–000. The proposed
pipeline would connect the proposed
Jordan Cove LNG terminal with existing
interstate pipeline systems operated by
Williams Northwest Pipeline
Corporation, Gas Transmission
Northwest Corporation, Tuscarora Gas
Transmission Company, and Pacific Gas
and Electric Company, and with an
existing local distribution pipeline
system operated by Avista Corporation.
The FERC staff produced the draft EIS
in cooperation with the U.S. Department
of Agriculture Forest Service, U.S. Army
Corps of Engineers, U.S. Environmental
Protection Agency, U.S. Department of
Homeland Security Coast Guard, U.S.
Department of the Interior Bureau of
Land Management and Bureau of
Reclamation, U.S. Department of
Transportation, and Douglas County,
Oregon. The draft EIS was delivered to
the U.S. Environmental Protection
Agency, and mailed to various federal,
state, and local government agencies,
elected officials, affected landowners,
regional environmental organizations,
Indian tribes, local libraries and
newspapers, intervenors, and other
interested parties.
The issuance of the draft EIS was
noticed in the Federal Register on
September 5, 2008 (73 FR 51815). The
deadline for comments on the draft EIS
is December 4, 2008. In addition to, or
in lieu of, sending in written comments
on the draft EIS, the FERC and
cooperating agencies invite you to
attend the public comment meetings
that will be held in the project area in
October 2008, on the dates, times, and
locations listed below.
Date and Time
September 19, 2008.
PO 00000
55831
Sfmt 4703
Location
Monday, October 27,
2008, 6:30 p.m. to
10 p.m. (PST).
North Bend Community Center, 2222
Broadway Street,
North Bend, Oregon 97459. Telephone: 541–756–
8500.
E:\FR\FM\26SEN1.SGM
26SEN1
Agencies
[Federal Register Volume 73, Number 188 (Friday, September 26, 2008)]
[Notices]
[Page 55831]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-22680]
[[Page 55831]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
September 23, 2008.
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Docket Numbers: RP00-426-038.
Applicants: Texas Gas Transmission, LLC.
Description: Texas Gas Transmission LLC submits Original Sheet 55G
et al to FERC Gas Tariff, Second Revised Volume 1.
Filed Date: 09/12/2008.
Accession Number: 20080916-0029.
Comment Date: 5 p.m. Eastern Time on Friday, September 26, 2008.
Docket Numbers: RP08-628-000.
Applicants: CenterPoint Energy--Mississippi River Transmission
Corporation.
Description: CenterPoint Energy--Mississippi River Transmission
Corporation submits Sixty-Fourth Revised Sheet 5 et al to FERC Gas
Tariff, Third Revised Volume 1, to be effective 11/1/08.
Filed Date: 09/22/2008.
Accession Number: 20080922-0261.
Comment Date: 5 p.m. Eastern Time on Monday, October 06, 2008.
Docket Numbers: RP08-629-000.
Applicants: Dominion Cove Point LNG, LP.
Description: Report of Revenue Crediting of Dominion Cove Point
LNG, LP.
Filed Date: 09/22/2008.
Accession Number: 20080922-5097.
Comment Date: 5 p.m. Eastern Time on Monday, October 06, 2008.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed dockets(s). For assistance
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov.
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8-22680 Filed 9-25-08; 8:45 am]
BILLING CODE 6717-01-P