Public Utility District No. 1 of Pend Oreille County; Notice of Authorization for Continued Project Operation, 55830 [E8-22623]
Download as PDF
jlentini on PROD1PC65 with NOTICES
55830
Federal Register / Vol. 73, No. 188 / Friday, September 26, 2008 / Notices
g. Applicant Contact: For the
transferor: Mr. Brent L. Smith, 4110 East
300 North, P.O Box 535, Rigby, ID
83442, (208) 745–0834.
For the transferee: Mr. Dee M.
Reynolds, 1150 N 3400 E, Ashton, ID
83420, (208) 652–7431.
h. FERC Contact: Steven Sachs, (202)
502–8666.
i. Deadline for filing comments,
protests and motions to intervene:
October 21, 2008.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings. Please include the
project number (P–11879–003) on any
comments or motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
j. Description of Application:
Applicants seek Commission approval
to transfer the license for the Chester
Diversion Dam Project from Symbiotics,
LLC to Fall River Rural Electric
Cooperative, Inc.
k. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372 or e-mail
FERCONLINESUPPORT@FERC.GOV.
For TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item g
above.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
VerDate Aug<31>2005
18:07 Sep 25, 2008
Jkt 214001
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
n. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. Any of the above-named
documents must be filed by providing
the original and eight copies to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any
motion to intervene must also be served
upon each representative of the
Applicants specified in the particular
application.
o. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicants. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicants’ representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–22617 Filed 9–25–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2225–000]
Public Utility District No. 1 of Pend
Oreille County; Notice of Authorization
for Continued Project Operation
September 19, 2008.
On September 23, 2003, the Public
Utility District No.1 of Pend Oreille
County, licensee for the Sullivan Creek
Hydroelectric Project, filed a Notice of
Intent Not to File an Application for a
New or Subsequent license pursuant to
the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Sullivan Creek Hydroelectric
Project is located on Sullivan Creek in
Pend Oreille County, Washington.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
The license for Project No. 2225 was
issued for a period ending September
30, 2008. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2225
is issued to the Public Utility District
No.1 of Pend Oreille County, for a
period effective October 1, 2008 through
September 30, 2009, or until the
issuance of a new license for the project
or other disposition under the FPA,
whichever comes first. If issuance of a
new license (or other disposition) does
not take place on or before September
30, 2009, notice is hereby given that,
pursuant to 18 CFR 16.18(c), an annual
license under section 15(a)(1) of the
FPA is renewed automatically without
further order or notice by the
Commission, unless the Commission
orders otherwise. If the project is not
subject to section 15 of the FPA, notice
is hereby given that the Public Utility
District NO.1 of Pend Oreille County, is
authorized to continue operation of the
Sullivan Creek Hydroelectric Project,
until such time as the Commission acts
on its application for a subsequent
license.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–22623 Filed 9–25–08; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\26SEN1.SGM
26SEN1
Agencies
[Federal Register Volume 73, Number 188 (Friday, September 26, 2008)]
[Notices]
[Page 55830]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-22623]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2225-000]
Public Utility District No. 1 of Pend Oreille County; Notice of
Authorization for Continued Project Operation
September 19, 2008.
On September 23, 2003, the Public Utility District No.1 of Pend
Oreille County, licensee for the Sullivan Creek Hydroelectric Project,
filed a Notice of Intent Not to File an Application for a New or
Subsequent license pursuant to the Federal Power Act (FPA) and the
Commission's regulations thereunder. The Sullivan Creek Hydroelectric
Project is located on Sullivan Creek in Pend Oreille County,
Washington.
The license for Project No. 2225 was issued for a period ending
September 30, 2008. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the expiration of a license term, to issue
from year-to-year an annual license to the then licensee under the
terms and conditions of the prior license until a new license is
issued, or the project is otherwise disposed of as provided in section
15 or any other applicable section of the FPA. If the project's prior
license waived the applicability of section 15 of the FPA, then, based
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c),
and as set forth at 18 CFR 16.21(a), if the licensee of such project
has filed an application for a subsequent license, the licensee may
continue to operate the project in accordance with the terms and
conditions of the license after the minor or minor part license
expires, until the Commission acts on its application. If the licensee
of such a project has not filed an application for a subsequent
license, then it may be required, pursuant to 18 CFR 16.21(b), to
continue project operations until the Commission issues someone else a
license for the project or otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 2225 is issued to
the Public Utility District No.1 of Pend Oreille County, for a period
effective October 1, 2008 through September 30, 2009, or until the
issuance of a new license for the project or other disposition under
the FPA, whichever comes first. If issuance of a new license (or other
disposition) does not take place on or before September 30, 2009,
notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual
license under section 15(a)(1) of the FPA is renewed automatically
without further order or notice by the Commission, unless the
Commission orders otherwise. If the project is not subject to section
15 of the FPA, notice is hereby given that the Public Utility District
NO.1 of Pend Oreille County, is authorized to continue operation of the
Sullivan Creek Hydroelectric Project, until such time as the Commission
acts on its application for a subsequent license.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-22623 Filed 9-25-08; 8:45 am]