Environmental Impact Statements and Regulations; Availability of EPA Comments, 54396-54397 [E8-21957]
Download as PDF
54396
Federal Register / Vol. 73, No. 183 / Friday, September 19, 2008 / Notices
Comment Date: 5 p.m. Eastern Time
on Friday, September 19, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–21887 Filed 9–18–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–466–000]
El Paso Natural Gas Company; Notice
of Request Under Blanket
Authorization
jlentini on PROD1PC65 with NOTICES
September 11, 2008.
Take notice that on September 2,
2008, El Paso Natural Gas Company
(EPNG), Post Office Box 1087, Colorado
Springs, Colorado 80944, filed in Docket
No.
CP08–466–000, a prior notice request
pursuant to sections 157.205, 157.208,
and 157.216 of the Federal Energy
Regulatory Commission’s regulations
under the Natural Gas Act for
authorization to decrease the Maximum
Allowable Operating Pressures (MAOP)
of the Lakes Meter Station Line (Line
No. 20108) and the Chandler Line (Line
No. 2029) and to thereafter operate the
lines at the lower MAOP, and abandon
capacity on Line No. 2029, located in
Maricopa County, Arizona, all as more
fully set forth in the application, which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Specifically, EPNG proposes to
decrease the existing MAOP of Line No.
20108 from 715 psig to 266 psig and
Line No. 2029 from 650 psig to 430 psig.
EPNG also proposes to decrease the
existing design capacity on Line No.
2029 from 34 MMcf/d to 27 MMcf/d.
EPNG states that the proposed MAOP
decrease will not impair EPNG’s ability
to meet its current contractual
obligations on the two pipelines.
Any questions regarding the
application should be directed to
Richard Derryberry, Director, Regulatory
Affairs Department, El Paso Natural Gas
Company, Post Office Box 1087,
Colorado Springs, Colorado 80944, or
call (719) 520–3782.
VerDate Aug<31>2005
17:25 Sep 18, 2008
Jkt 214001
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205)
file a protest to the request. If no protest
is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–21888 Filed 9–18–08; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8585–8]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7146. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in FR dated April 6, 2008 (73 FR 19833).
Draft EISs
EIS No. 20080215, ERP No. D–SFW–
L64054–AK, Kenai National Wildlife
Refuge Draft Revised Comprehensive
Conservation Plan, Implementation,
AK.
Summary: While EPA expressed a
lack of objections, EPA recommended
that there be a commitment to prepare
a future Transportation Plan, an Oil and
Gas Decommissioning Plan, and a Tribal
Consultation Plan. Rating LO.
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
EIS No. 20080238, ERP No. D–AFS–
J65520–WY, Off-Highway Vehicle
(OHV) Route Designation Project,
Proposing to Improve Management of
Public Summer Motorized Use (May
1–November 30) by Designating Roads
and Motorized Trails, Bridger-Teton
National Forest, Buffalo, Jackson and
Big Piney Ranger Districts, Teton,
Lincoln and Sublette Counties, WY.
Summary: EPA expressed concern
about water quality, soil and wildlife
impacts. Rating EC2.
EIS No. 20080262, ERP No. D–SFW–
K64027–NV, Desert National Wildlife
Refuge Complex, Ash Meadows,
Desert, Moapa Valley and Pahranagat
National Wildlife Refuges,
Comprehensive Conservation Plan,
Clark, Lincoln and Nye counties, NV.
Summary: EPA has a lack of
objections to the proposed project and
supports the restoration efforts included
in the preferred alternatives. Rating LO.
EIS No. 20080276, ERP No. D–FTA–
J53009–CO, Gold Line Corridor
Project, To Implement FixedGuideway Transit Service within the
Golden Line Study area between
Denver Union Station (DUS) and
Ward Road in Wheat Ridge, Denver,
Arvada, Wheat Ridge, Adam and
Jefferson Counties, CO.
Summary: EPA expressed concern
about water quality, flooding and
erosion impacts from increased
impervious surfaces. Rating EC1.
Final EISs
EIS No. 20080271, ERP No. F–BLM–
J65493–UT, Kanab Field Office
Resource Management Plan,
Implementation, Portions of Kane and
Garfield Counties, UT.
Summary: EPA continues to have
concerns about impacts to water quality,
air quality, aquatic resources, wildlife
habitats, and recreational resources.
EIS No. 20080286, ERP No. F–AFS–
J65499–UT, Pockets Resource
Management Project, Proposes to
Salvage Dead and Dying Spruce/Fir,
Regenerate Aspen, and Manage
Travel, Escalate Ranger District, Dixie
National Forest, Garfield County, UT.
Summary: The FEIS adequately
addressed EPA’s concerns regarding
potential water quality impacts from the
project to Antimony Creek, the only
perennial stream within the project area.
EIS No. 20080289, ERP No. F–FTA–
G59004–TX, Northwest Corridor Light
Rail Transit Line (LRT) to Irving
/Dallas/Fort Worth International
Airport, Construction, Dallas County,
TX.
E:\FR\FM\19SEN1.SGM
19SEN1
Federal Register / Vol. 73, No. 183 / Friday, September 19, 2008 / Notices
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20080301, ERP No. F–BLM–
J65494–UT, Richfield Field Office
Resource Management Plan,
Implementation, Future Management
of the Public Lands and Resource,
Glen Canyon National Recreation
Area, Capitol Reef and Canyonlands
National Parks, Sanpete, Sevier, Piute,
Wayne and Garfield Counties, UT.
Summary: EPA continues to have
concerns with potential impacts to air
quality, riparian and wetlands
resources, and water quality.
EIS No. 20080306, ERP No. F–AFS–
H65037–00, Nebraska and South
Dakota Black-Tailed Prairie Dog
Management, To Manage Prairie Dog
Colonies in an Adaptive Fashion,
Nebraska National Forest and
Associated Units, Including Land and
Resource Management Plan
Amendment 3, Dawes, Sioux, Blaines
Counties, NE and Custer, Fall River,
Jackson, Pennington, Jones, Lyman,
Stanley Counties, SD.
Summary: No formal comment letter
was sent to the preparing agency.
Dated: September 16, 2008.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E8–21957 Filed 9–18–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8585–7]
Environmental Impacts Statements;
Notice of Availability
jlentini on PROD1PC65 with NOTICES
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly Receipt of Environmental
Impact Statements
Filed 09/08/2008 through 09/12/2008.
Pursuant to 40 CFR 1506.9.
EIS No. 20080352, Draft Supplement,
COE, 00, White River Minimum Flood
Study, To Provide an Improved
Minimum Flow for the Benefit of the
Tail Water Fishery, White River Basin
Lakes: Beaver, Table Rock, and Bull
Shoal Lakes on the White River;
Norfork Lake on the North Fork White
River; and Greens Ferry Lake on the
Little Red River, AR and MO,
Comment Period Ends: 11/03/2008,
Contact: Mike Biggs 501–324–7342.
EIS No. 20080353, Draft Supplement,
AFS, 00, Gypsy Moth Management in
the United States: A Cooperative
VerDate Aug<31>2005
17:25 Sep 18, 2008
Jkt 214001
Approach, Proposing New Treatments
that were not Available when the
1995 EIS was written, US, Comment
Period Ends: 11/03/2008, Contact:
William Oldland 304–285–1585.
EIS No. 20080354, Final EIS, NPS, VA,
Manassas National Battlefield Park
General Management Plan,
Implementation, Fairfax and Prince
William Counties, VA, Wait Period
Ends: 10/20/2008, Contact: Bill
Arguto 202–619–7277.
EIS No. 20080355, Final EIS, AFS, OR,
Ashland Forest Resiliency Project, To
Recover from Large-Scale HighSeverity Wild Land Fire, Upper Bear
Analysis Area, Ashland Ranger
District, Rogue River-Siskiyou
National Forest, Jackson County, OR,
Wait Period Ends: 10/20/2008,
Contact: Ken Grigsby 541–618–2126.
EIS No. 20080356, Draft Supplement,
AFS, CA, Kings River Project, New
Information regarding Pacific Fisher
(Martes pennanti), Proposal to Restore
Historical Pre-1850 Forest Conditions,
Implementation, High Sierra Ranger
District, Sierra National Forest, Fresno
County, CA, Comment Period Ends:
11/03/2008, Contact: Ray Porter 559–
855–5355.
EIS No. 20080357, Draft EIS, FRC, CA,
Big Creek Hydro Project (FERC Nos.
67, 120, 2085, and 2175) Proposes to
Relicenses, Big Creek Nos. 2A, 8 and
Eastwood—FERC No. 67; Big Creek
Nos. 1 and 2—FERC No. 2175;
Mammoth Pool—FERC No. 2085 and
Big Creek No. 3 FERC No. 120, Frenso
and Madera Counties, CA, Comment
Period Ends: 11/03/2008, Contact:
Patricia Schaub 1–866–208–3372.
EIS No. 20080358, Final EIS, SFW, TX,
Williamson County Regional Habitat
Conservation Plan, Application for an
Incidental Take Permit, Williamson
County, TX, Wait Period Ends: 10/20/
2008, Contact: Bill Seawell 512–490–
0057.
EIS No. 20080359, Final EIS, BIA, WY,
Riverton Dome Coal Bed Natural Gas
(CBNG) and Conventional Gas
Development Project, Construction of
Well Pads, Roads, Pipelines, and
Production Facilities, Wind River
Indian Reservation (WRIR), Fremont
County, WY, Wait Period Ends: 10/20/
2008, Contact: Ray Nation 307–332–
3718.
EIS No. 20080360, Draft EIS, NOA, 00,
Amendment 1 to the 2006
Consolidated Highly Migratory
Species (HMS) Fishery Management
Plan, (FMP), Updating and Revising
Essential Fish Habitat (EFH) for
Atlantic Highly Migratory Species
(HMS) consider additional Habitat
Area of Particular Concern (HAPC)
and Analyze Fishing Impacts,
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
54397
Chesapeake Bay, MD, Delaware Bay,
DE, Great Bay, NJ and Outer Bank off
NC, Comment Period Ends: 11/18/
2008, Contact: Margo Schulze-Haugen
301–713–2347.
EIS No. 20080361, Draft Supplement,
USA, HI, Makua Military Reservation
(MMR) Project, Proposed Military
Training Activities, To Conduct the
Necessary Type, Level, Duration, and
Intensity of Live-Fire and other
Military Training Activities, in
Particular Company-Level CombinedArms, Live-Fire Exercises (CALFEX),
25th Infantry Division (Light) and US
Army, HI, Comment Period Ends: 11/
03/2008, Contact: Dennis Drake 808–
656–3152.
EIS No. 20080362, Final EIS, AFS, CO,
Durango Mountain Resort
Improvement Plan, Special-UsePermits, Implementation, San Juan
National Forest, La Plata and San Juan
Counties, CO, Wait Period Ends: 10/
20/2008, Contact: Richard Speegle
970–375–3310.
EIS No. 20080363, Final EIS, AFS, CA,
Modoc National Forest Noxious Weed
Treatment Project, Proposes to
Implement a Control and Eradication
Project, Lassen, Modoc and Siskiyou
Counties, CA, Wait Period Ends: 10/
20/2008, Contact: Robert Haggard
530–233–8840.
Amended Notices
EIS No. 20080296, Final EIS, FHW, TX,
Grand Parkway (State Highway 99)
Selected the Preferred Alternative
Alignment, Segment F–2 from SH 249
to IH 45, Right-of-Way Permit and
U.S. Army COE Section 404 Permit,
Harris County, TX, Wait Period Ends:
11/07/2008, Contact: Justin Ham 512–
536–5963.
Revision to FR Notice Published 08/
08/2008. Extending Wait Period from
09/17/2008 to 11/07/2008.
EIS No. 20080322, Final EIS, NRC, GA,
Vogtle Electric Generating Plant Site,
Early Site Permit (ESP), for the
Construction and Operation of a new
Nuclear Power Generating Facility
Application Approval, Burke County,
GA NUREG 1872, Wait Period Ends:
10/20/2008, Contact: Mark D. Notich
301–415–3053.
Revision to FR Notice Published 08/
22/2008: Due to Agency submitting
Errata to the Final EIS, the Wait Period
will change from 9/22/2008 to 10/20/
2008.
Dated: September 16, 2008.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E8–21956 Filed 9–18–08; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\19SEN1.SGM
19SEN1
Agencies
[Federal Register Volume 73, Number 183 (Friday, September 19, 2008)]
[Notices]
[Pages 54396-54397]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-21957]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8585-8]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7146. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in FR dated April 6, 2008 (73 FR 19833).
Draft EISs
EIS No. 20080215, ERP No. D-SFW-L64054-AK, Kenai National Wildlife
Refuge Draft Revised Comprehensive Conservation Plan, Implementation,
AK.
Summary: While EPA expressed a lack of objections, EPA recommended
that there be a commitment to prepare a future Transportation Plan, an
Oil and Gas Decommissioning Plan, and a Tribal Consultation Plan.
Rating LO.
EIS No. 20080238, ERP No. D-AFS-J65520-WY, Off-Highway Vehicle (OHV)
Route Designation Project, Proposing to Improve Management of Public
Summer Motorized Use (May 1-November 30) by Designating Roads and
Motorized Trails, Bridger-Teton National Forest, Buffalo, Jackson and
Big Piney Ranger Districts, Teton, Lincoln and Sublette Counties, WY.
Summary: EPA expressed concern about water quality, soil and
wildlife impacts. Rating EC2.
EIS No. 20080262, ERP No. D-SFW-K64027-NV, Desert National Wildlife
Refuge Complex, Ash Meadows, Desert, Moapa Valley and Pahranagat
National Wildlife Refuges, Comprehensive Conservation Plan, Clark,
Lincoln and Nye counties, NV.
Summary: EPA has a lack of objections to the proposed project and
supports the restoration efforts included in the preferred
alternatives. Rating LO.
EIS No. 20080276, ERP No. D-FTA-J53009-CO, Gold Line Corridor Project,
To Implement Fixed-Guideway Transit Service within the Golden Line
Study area between Denver Union Station (DUS) and Ward Road in Wheat
Ridge, Denver, Arvada, Wheat Ridge, Adam and Jefferson Counties, CO.
Summary: EPA expressed concern about water quality, flooding and
erosion impacts from increased impervious surfaces. Rating EC1.
Final EISs
EIS No. 20080271, ERP No. F-BLM-J65493-UT, Kanab Field Office Resource
Management Plan, Implementation, Portions of Kane and Garfield
Counties, UT.
Summary: EPA continues to have concerns about impacts to water
quality, air quality, aquatic resources, wildlife habitats, and
recreational resources.
EIS No. 20080286, ERP No. F-AFS-J65499-UT, Pockets Resource Management
Project, Proposes to Salvage Dead and Dying Spruce/Fir, Regenerate
Aspen, and Manage Travel, Escalate Ranger District, Dixie National
Forest, Garfield County, UT.
Summary: The FEIS adequately addressed EPA's concerns regarding
potential water quality impacts from the project to Antimony Creek, the
only perennial stream within the project area.
EIS No. 20080289, ERP No. F-FTA-G59004-TX, Northwest Corridor Light
Rail Transit Line (LRT) to Irving /Dallas/Fort Worth International
Airport, Construction, Dallas County, TX.
[[Page 54397]]
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20080301, ERP No. F-BLM-J65494-UT, Richfield Field Office
Resource Management Plan, Implementation, Future Management of the
Public Lands and Resource, Glen Canyon National Recreation Area,
Capitol Reef and Canyonlands National Parks, Sanpete, Sevier, Piute,
Wayne and Garfield Counties, UT.
Summary: EPA continues to have concerns with potential impacts to
air quality, riparian and wetlands resources, and water quality.
EIS No. 20080306, ERP No. F-AFS-H65037-00, Nebraska and South Dakota
Black-Tailed Prairie Dog Management, To Manage Prairie Dog Colonies in
an Adaptive Fashion, Nebraska National Forest and Associated Units,
Including Land and Resource Management Plan Amendment 3, Dawes, Sioux,
Blaines Counties, NE and Custer, Fall River, Jackson, Pennington,
Jones, Lyman, Stanley Counties, SD.
Summary: No formal comment letter was sent to the preparing agency.
Dated: September 16, 2008.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E8-21957 Filed 9-18-08; 8:45 am]
BILLING CODE 6560-50-P