Download as PDF Federal Register / Vol. 73, No. 180 / Tuesday, September 16, 2008 / Notices the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. Motions to intervene, protests and comments may be filed electronically via the internet in lieu of paper; see, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Comment Date: October 1, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–21587 Filed 9–15–08; 8:45 am] ebenthall on PROD1PC60 with NOTICES BILLING CODE 6717–01–P VerDate Aug<31>2005 13:43 Sep 15, 2008 Jkt 214001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 September 04, 2008. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER98–2783–015; ER05–1266–009; ER99–3822–015; ER01–140–011; ER07–842–005; ER99– 4160–016; ER01–141–011; ER01–1044– 012; ER99–2157–012; ER03–42–016. Applicants: Ontelaunee Power Operating Company, LLC, CASCO BAY ENERGY COMPANY, LLC, Dynegy Power Marketing, Inc., Sithe/ Independence Power Partners, L.P., BRIDGEPORT ENERGY LLC, Dynegy Danskammer, L.L.C., Dynegy Kendall Energy, LLC, Riverside Generating Company, LLC, Dynegy Roseton, LLC, Rocky Road Power, LLC. Description: Updated Market Power Analysis re Bridgeport Energy, LLC et al. Filed Date: 08/29/2008. Accession Number: 20080829–5162. Comment Date: 5 p.m. Eastern Time on Tuesday, October 28, 2008. Docket Numbers: ER00–2508–003. Applicants: Orion Power Midwest, L.P., Reliant Energy Mid-Atlantic Pwr Holdings. Description: Reliant Energy MidAtlantic Power Holdings, LLC submits a Supplement to the June 30, 2008 Triennial Market Update. Filed Date: 09/02/2008. Accession Number: 20080902–5148. Comment Date: 5 p.m. Eastern Time on Tuesday, September 23, 2008. Docket Numbers: ER05–717–009; ER05–721–009; ER04–374–009; ER99– 2341–011; ER06–230–006; ER06–1334– 006; ER07–277–004; ER07–810–003. Applicants: Spring Canyon Energy LLC; Judith Gap Energy LLC; Invernergy TN LLC; Hardee Power Partners Limited; Wolverine Creek Energy LLC; Spindle Hill Energy LLC; Invenergy Cannon Falls LLC; Grays Harbor Energy LLC. Description: Spring Canyon Energy LLC et al. submits notification of change of status under market-based rate authority. Filed Date: 08/28/2008. Accession Number: 20080829–0113. Comment Date: 5 p.m. Eastern Time on Thursday, September 18, 2008. Docket Numbers: ER06–456–015; ER06–954–011; ER06–1271–010; ER07– 424–006; EL07–57–003; ER06–880–011. Applicants: PJM Interconnection, L.L.C. PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 53417 Description: PJM Interconnection, LLC submits clean and redlined versions of the revised paragraph of the Offer of Settlement and Partial Settlement Agreement, in accordance with FERC’s July 29, 2008 Order. Filed Date: 08/29/2008. Accession Number: 20080903–0078. Comment Date: 5 p.m. Eastern Time on Friday, September 19, 2008. Docket Numbers: ER06–1364–002. Applicants: International Paper Company. Description: Notice of Change in Status re International Paper Co. Filed Date: 09/02/2008. Accession Number: 20080902–5144. Comment Date: 5 p.m. Eastern Time on Tuesday, September 23, 2008. Docket Numbers: ER08–1094–002; ER08–1095–002; ER08–1097–002. Applicants: NAEA Energy Massachusetts, LLC; NAEA Ocean Peaking Power, LLC; NAEA Rock Springs, LLC. Description: NAEA Energy Massachusetts, LLC et al. submits revisions to their respective marketbased rate tariffs, rate schedules and agreements under ER08–1094 et al. Filed Date: 08/29/2008. Accession Number: 20080903–0077. Comment Date: 5 p.m. Eastern Time on Tuesday, September 9, 2008. Docket Numbers: ER08–1477–000. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc submits Large Generator Interconnection Agreement among American Transmission Company, LLC, Wisconsin Power and Light Co & Midwest ISO etc. Filed Date: 08/29/2008. Accession Number: 20080903–0109. Comment Date: 5 p.m. Eastern Time on Friday, September 19, 2008. Take notice that the Commission received the following open access transmission tariff filings: Docket Numbers: OA07–11–004; OA07–33–003. Applicants: Deseret Generation & Transmission Co-op. Description: Order No. 890 OATT Compliance Filing re Deseret Generation & Transmission Co-operative, Inc. under OA07–11 et al. Filed Date: 08/29/2008. Accession Number: 20080829–5163. Comment Date: 5 p.m. Eastern Time on Friday, September 19, 2008. Docket Numbers: OA07–110–002. Applicants: NorthWestern Corporation (South Dakota). Description: NorthWestern Corporation (North Western) submits a E:\FR\FM\16SEN1.SGM 16SEN1 53418 Federal Register / Vol. 73, No. 180 / Tuesday, September 16, 2008 / Notices ebenthall on PROD1PC60 with NOTICES substitute version of the Attachment K to its South Dakota Open Access Transmission Tariff, FERC Electric Tariff, Second Revised Volume 2 etc under OA07–110. Filed Date: 08/29/2008. Accession Number: 20080903–0076. Comment Date: 5 p.m. Eastern Time on Friday, September 19, 2008. (866) 208–3676 (toll free). For TTY, call (202) 502–8659. 502–6082 or by e-mail at allyson.conner@ferc.gov. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E8–21560 Filed 9–15–08; 8:45 am] Kimberly D. Bose, Secretary. [FR Doc. E8–21584 Filed 9–15–08; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Project No. 12646–001—Oklahoma] [Docket No. ER02–2551–004] City of Broken Bow, OK; Notice of Availability of Environmental Assessment Cargill Power Markets, LLC; Notice of Filing September 10, 2008. September 9, 2008. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission or FERC) regulations, 18 CFR 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the City of Broken Bow, Oklahoma’s application for license for the proposed Pine Creek Lake Dam Hydropower Project (or Project), located on Pine Creek dam in McCurtain County, Oklahoma, and has prepared an environmental assessment (EA) for the Project. The proposed Project would occupy a total of 10.12 acres of federal lands administered by the U.S. Army Corps of Engineers. The EA contains Commission staff’s analysis of the potential future environmental effects of the Project. Staff has concluded that licensing the Project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. You may also register online at https://www.ferc.gov/docsfiling/esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. For further information, contact Allyson Conner by telephone at (202) Take notice that on August 21, 2008, Cargill Power Markets, LLC filed a supplemental to its June 30, 2008, Category 1 status filing. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. VerDate Aug<31>2005 13:43 Sep 15, 2008 Jkt 214001 PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 E:\FR\FM\16SEN1.SGM 16SEN1

Agencies

[Federal Register Volume 73, Number 180 (Tuesday, September 16, 2008)]
[Notices]
[Pages 53417-53418]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-21560]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

September 04, 2008.
    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER98-2783-015; ER05-1266-009; ER99-3822-015; ER01-
140-011; ER07-842-005; ER99-4160-016; ER01-141-011; ER01-1044-012; 
ER99-2157-012; ER03-42-016.
    Applicants: Ontelaunee Power Operating Company, LLC, CASCO BAY 
ENERGY COMPANY, LLC, Dynegy Power Marketing, Inc., Sithe/Independence 
Power Partners, L.P., BRIDGEPORT ENERGY LLC, Dynegy Danskammer, L.L.C., 
Dynegy Kendall Energy, LLC, Riverside Generating Company, LLC, Dynegy 
Roseton, LLC, Rocky Road Power, LLC.
    Description: Updated Market Power Analysis re Bridgeport Energy, 
LLC et al.
    Filed Date: 08/29/2008.
    Accession Number: 20080829-5162.
    Comment Date: 5 p.m. Eastern Time on Tuesday, October 28, 2008.

    Docket Numbers: ER00-2508-003.
    Applicants: Orion Power Midwest, L.P., Reliant Energy Mid-Atlantic 
Pwr Holdings.
    Description: Reliant Energy Mid-Atlantic Power Holdings, LLC 
submits a Supplement to the June 30, 2008 Triennial Market Update.
    Filed Date: 09/02/2008.
    Accession Number: 20080902-5148.
    Comment Date: 5 p.m. Eastern Time on Tuesday, September 23, 2008.

    Docket Numbers: ER05-717-009; ER05-721-009; ER04-374-009; ER99-
2341-011; ER06-230-006; ER06-1334-006; ER07-277-004; ER07-810-003.
    Applicants: Spring Canyon Energy LLC; Judith Gap Energy LLC; 
Invernergy TN LLC; Hardee Power Partners Limited; Wolverine Creek 
Energy LLC; Spindle Hill Energy LLC; Invenergy Cannon Falls LLC; Grays 
Harbor Energy LLC.
    Description: Spring Canyon Energy LLC et al. submits notification 
of change of status under market-based rate authority.
    Filed Date: 08/28/2008.
    Accession Number: 20080829-0113.
    Comment Date: 5 p.m. Eastern Time on Thursday, September 18, 2008.

    Docket Numbers: ER06-456-015; ER06-954-011; ER06-1271-010; ER07-
424-006; EL07-57-003; ER06-880-011.
    Applicants: PJM Interconnection, L.L.C.
    Description: PJM Interconnection, LLC submits clean and redlined 
versions of the revised paragraph of the Offer of Settlement and 
Partial Settlement Agreement, in accordance with FERC's July 29, 2008 
Order.
    Filed Date: 08/29/2008.
    Accession Number: 20080903-0078.
    Comment Date: 5 p.m. Eastern Time on Friday, September 19, 2008.

    Docket Numbers: ER06-1364-002.
    Applicants: International Paper Company.
    Description: Notice of Change in Status re International Paper Co.
    Filed Date: 09/02/2008.
    Accession Number: 20080902-5144.
    Comment Date: 5 p.m. Eastern Time on Tuesday, September 23, 2008.

    Docket Numbers: ER08-1094-002; ER08-1095-002; ER08-1097-002.
    Applicants: NAEA Energy Massachusetts, LLC; NAEA Ocean Peaking 
Power, LLC; NAEA Rock Springs, LLC.
    Description: NAEA Energy Massachusetts, LLC et al. submits 
revisions to their respective market-based rate tariffs, rate schedules 
and agreements under ER08-1094 et al.
    Filed Date: 08/29/2008.
    Accession Number: 20080903-0077.
    Comment Date: 5 p.m. Eastern Time on Tuesday, September 9, 2008.

    Docket Numbers: ER08-1477-000.
    Applicants: Midwest Independent Transmission System Operator, Inc.
    Description: Midwest Independent Transmission System Operator, Inc 
submits Large Generator Interconnection Agreement among American 
Transmission Company, LLC, Wisconsin Power and Light Co & Midwest ISO 
etc.
    Filed Date: 08/29/2008.
    Accession Number: 20080903-0109.
    Comment Date: 5 p.m. Eastern Time on Friday, September 19, 2008.

    Take notice that the Commission received the following open access 
transmission tariff filings:

    Docket Numbers: OA07-11-004; OA07-33-003.
    Applicants: Deseret Generation & Transmission Co-op.
    Description: Order No. 890 OATT Compliance Filing re Deseret 
Generation & Transmission Co-operative, Inc. under OA07-11 et al.
    Filed Date: 08/29/2008.
    Accession Number: 20080829-5163.
    Comment Date: 5 p.m. Eastern Time on Friday, September 19, 2008.

    Docket Numbers: OA07-110-002.
    Applicants: NorthWestern Corporation (South Dakota).
    Description: NorthWestern Corporation (North Western) submits a

[[Page 53418]]

substitute version of the Attachment K to its South Dakota Open Access 
Transmission Tariff, FERC Electric Tariff, Second Revised Volume 2 etc 
under OA07-110.
    Filed Date: 08/29/2008.
    Accession Number: 20080903-0076.
    Comment Date: 5 p.m. Eastern Time on Friday, September 19, 2008.

    Any person desiring to intervene or to protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214) on or before 5 p.m. Eastern time on the specified comment 
date. It is not necessary to separately intervene again in a subdocket 
related to a compliance filing if you have previously intervened in the 
same docket. Protests will be considered by the Commission in 
determining the appropriate action to be taken, but will not serve to 
make protestants parties to the proceeding. Anyone filing a motion to 
intervene or protest must serve a copy of that document on the 
Applicant. In reference to filings initiating a new proceeding, 
interventions or protests submitted on or before the comment deadline 
need not be served on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
14 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
    The filings in the above proceedings are accessible in the 
Commission's eLibrary system by clicking on the appropriate link in the 
above list. They are also available for review in the Commission's 
Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive e-mail notification 
when a document is added to a subscribed dockets(s). For assistance 
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, 
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8-21560 Filed 9-15-08; 8:45 am]
BILLING CODE 6717-01-P