Federal Register / Vol. 73, No. 178 / Friday, September 12, 2008 / Notices
Schedule of Rate for Scheduling,
System Control, and Dispatch Ancillary
Services
Effective: Beginning on October 1,
2008, and extending through September
30, 2013.
Available: In the area served by the
Colorado River Storage Project (CRSP)
transmission system.
Applicable: To all CRSP transmission
customers receiving this service.
Character of Service: Scheduling,
System Control, and Dispatch service is
required to schedule the movement of
power through, out of, within, or into a
balancing authority.
Rate: Included in appropriate
transmission rates.
Rate Schedule SP–RS3
(Supersedes Schedule SP–RS2)
United States Department of Energy
Western Area Power Administration
Colorado River Storage Project; Arizona,
Colorado, New Mexico, Utah
Schedule of Rate for Reactive Supply
and Voltage Control Ancillary Service
Effective: Beginning on October 1,
2008, and extending through September
30, 2013.
Available: In the area served by the
Colorado River Storage Project (CRSP)
Transmission system.
Applicable: To all CRSP transmission
customers receiving this service.
Character of Service: Reactive power
is support provided from generation
facilities that is necessary to maintain
transmission voltages within acceptable
limits of the system.
Rate: Provided through WALC
balancing authority under Rate
Schedule DSW–RS2 or WACM
balancing authority under Rate
Schedule L–AS2, or as superseded.
ebenthall on PROD1PC60 with NOTICES
Rate Schedule SP–EI3
(Supersedes Schedule SP–EI2)
United States Department of Energy
Western Area Power Administration
Colorado River Storage Project; Arizona,
Colorado, New Mexico, Utah
Schedule of Rate for Energy Imbalance
Ancillary Service
Effective: Beginning on October 1,
2008, and extending through September
30, 2013.
Available: In the area served by the
Colorado River Storage Project (CRSP)
transmission system.
Applicable: To all CRSP transmission
customers receiving this service.
Character of Service: Provided when
a difference occurs between the
schedules and the actual delivery of
energy to a load located within a
balancing authority over a single hour.
Rates: Provided through WALC
balancing authority under Rate
VerDate Aug<31>2005
15:18 Sep 11, 2008
Jkt 214001
Schedule DSW–EI2 or WACM balancing
authority under Rate Schedule L–AS4,
or as superseded, or the customer can
make alternative comparable
arrangements to satisfy its Energy
Imbalance service obligations.
Rate Schedule SP–FR3
(Supersedes Schedule SP–FR2)
United States Department of Energy
Western Area Power Administration
Colorado River Storage Project; Arizona,
Colorado, New Mexico, Utah
Schedule of Rate for Regulation and
Frequency Response Ancillary Service
Effective: Beginning on October 1,
2008, and extending through September
30, 2013.
Available: In the area served by the
Colorado River Storage Project (CRSP)
transmission system.
Applicable: To all CRSP transmission
customers receiving this service.
Character of Service: Necessary to
provide the continuous balancing of
resources, generation and interchange,
with load and for maintaining schedules
interconnection frequency at 60 cycles
per second (60 Hz).
Rate: If the CRSP MC has regulation
available for sale, the SLCA/IP firm
power capacity rate, currently in effect,
will be charged. If regulation is
unavailable from SLCA/IP resources, the
WALC or WACM balancing authorities
can provide the service, in accordance
with their respective rate schedules.
Rate Schedule SP–SSR3
(Supersedes Schedule SP–SSR2)
United States Department of Energy
Western Area Power Administration
Colorado River Storage Project; Arizona,
Colorado, New Mexico, Utah
Schedule of Rates for Spinning and
Supplemental Reserve Ancillary
Service
Effective: Beginning on October 1,
2008, and extending through September
30, 2013.
Available: In the area served by the
Colorado River Storage Project (CRSP)
transmission system.
Applicable: To all CRSP transmission
customers receiving this service.
Character of Service: Spinning
Reserve is defined in Schedule 5 of
Western Area Power Administration’s
Open Access Transmission Tariff.
Supplemental Reserve is defined in
Schedule 6 of Western Area Power
Administration’s Open Access
Transmission Tariff.
Rate: If CRSP resources are available,
the charge will be determined based on
market rates plus administrative costs. If
CRSP resources are not available, CRSP
will purchase spinning reserves and
pass through the costs associated with
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
these purchases, including
administrative costs.
[FR Doc. E8–21176 Filed 9–11–08; 8:45 am]
BILLING CODE 6450–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–8714–3]
Agency Information Collection
Activities OMB Responses
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: This document announces the
Office of Management and Budget’s
(OMB) responses to Agency Clearance
requests, in compliance with the
Paperwork Reduction Act (44 U.S.C.
3501 et seq.). An agency may not
conduct or sponsor, and a person is not
required to respond to, a collection of
information unless it displays a
currently valid OMB control number.
The OMB control numbers for EPA’s
regulations are listed in 40 CFR part 9
and 48 CFR chapter 15.
FOR FURTHER INFORMATION CONTACT: Rick
Westlund (202) 566–1682, or e-mail at
westlund.rick@epa.gov and please refer
to the appropriate EPA Information
Collection Request (ICR) Number.
SUPPLEMENTARY INFORMATION:
OMB Responses to Agency Clearance
Requests
OMB Approvals
EPA ICR Number 1669.05; Lead-Based
Paint Pre-Renovation Information
Dissemination—TSCA Section 406(b);
in 40 CFR part 735, subpart E; was
approved 08/14/2008; OMB Number
2070–0158; expires 08/31/2011.
Dated: September 8, 2008.
Sara Hisel-McCoy,
Director, Collection Strategies Division.
[FR Doc. E8–21314 Filed 9–11–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPPT–2008–0661; FRL–8381–5]
Certain New Chemicals; Receipt and
Status Information
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: Section 5 of the Toxic
Substances Control Act (TSCA) requires
any person who intends to manufacture
E:\FR\FM\12SEN1.SGM
12SEN1
Agencies
[Federal Register Volume 73, Number 178 (Friday, September 12, 2008)]
[Notices]
[Page 52996]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-21314]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[FRL-8714-3]
Agency Information Collection Activities OMB Responses
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: This document announces the Office of Management and Budget's
(OMB) responses to Agency Clearance requests, in compliance with the
Paperwork Reduction Act (44 U.S.C. 3501 et seq.). An agency may not
conduct or sponsor, and a person is not required to respond to, a
collection of information unless it displays a currently valid OMB
control number. The OMB control numbers for EPA's regulations are
listed in 40 CFR part 9 and 48 CFR chapter 15.
FOR FURTHER INFORMATION CONTACT: Rick Westlund (202) 566-1682, or e-
mail at westlund.rick@epa.gov and please refer to the appropriate EPA
Information Collection Request (ICR) Number.
SUPPLEMENTARY INFORMATION:
OMB Responses to Agency Clearance Requests
OMB Approvals
EPA ICR Number 1669.05; Lead-Based Paint Pre-Renovation Information
Dissemination--TSCA Section 406(b); in 40 CFR part 735, subpart E; was
approved 08/14/2008; OMB Number 2070-0158; expires 08/31/2011.
Dated: September 8, 2008.
Sara Hisel-McCoy,
Director, Collection Strategies Division.
[FR Doc. E8-21314 Filed 9-11-08; 8:45 am]
BILLING CODE 6560-50-P