c. Date filed: August 22, 2008.
d. Applicant: Public Utility District
No. 1 of Okanogan County.
e. Name of Project: Enloe
Hydroelectric Project.
f. Location: On the Similkameen
River, near the Town of Oroville,
Okanogan County, Washington. The
project occupies about 35.47 acres of
federal lands under the jurisdiction of
the U.S. Bureau of Land Management.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: John R.
Grubich, General Manager, Public
Utility District No. 1 of Okanogan
County, P.O. Box 912, Okanogan,
Washington 98840, (509) 422–8485.
i. FERC Contact:
Dianne Rodman, 888 First Street, NE.,
Room 6B–02, Washington, DC 20426,
(202) 502–6077,
dianne.rodman@ferc.gov.
Kim A. Nguyen, 888 First Street, NE.,
Room 63–11, Washington, DC 20426,
(202) 502–6105, kim.nguyen@ferc.gov.
j. Cooperating agencies: We are asking
Federal, state, local, and tribal agencies
with jurisdiction and/or special
expertise with respect to environmental
issues to cooperate with us in the
preparation of the environmental
document. Agencies who would like to
request cooperating status should follow
the instructions for filing comments
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. The application is not ready for
environmental analysis at this time.
l. Deadline for requesting cooperating
agency status is October 21, 2008.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
m. The Enloe Project would consist of:
(1) An existing 315-foot-long and 54foot-high concrete gravity arch dam
with an integrated 276-foot-long central
overflow spillway with 5-foot-high
flashboards; (2) an existing 76.6-acre
reservoir (narrow channel of the
Similkameen River) with a storage
capacity of 775 acre-feet at 1049.3 feet
mean sea level; (3) an 190-foot-long
intake canal on the east abutment of the
dam diverting flows into the penstock
intake structure; (4) a 35-foot-long by
30-foot-wide penstock intake structure;
(5) two above-ground 8.5-foot-diameter
steel penstocks carrying flows from the
intake to the powerhouse; (6) a
powerhouse containing two vertical
Kaplan turbine/generator units with a
total installed capacity of 9.0 megawatts;
(7) a 180-foot-long tailrace channel that
would convey flows from the
powerhouse to the Similkameen River,
downstream of the Similkameen Falls;
(8) a new substation adjacent to the
powerhouse; (9) a new 100-foot-long,
13.2-kilovolt primary transmission line
from the substation connecting to an
existing distribution line; (10) new and
upgraded access roads, and (11)
appurtenant facilities.
The project is estimated to generate an
average of 54 gigawatthours annually.
n. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. With this notice, we are initiating
consultation with the Washington State
Historic Preservation Officer, as
required by section 106, National
Historic Preservation Act, and the
regulations of the Advisory Council on
Historic Preservation, 36 CFR 800.4.
p. Procedural schedule: The
application will be processed according
to the following Hydro Licensing
Schedule. Revisions to the schedule will
be made as appropriate.
Issue Deficiency Letter, if needed .................................................................................................................................................
Issue Acceptance letter ...................................................................................................................................................................
Issue Scoping Document 1 .............................................................................................................................................................
Issue Scoping Document 2 .............................................................................................................................................................
Notice that application is ready for environmental analysis .......................................................................................................
Notice of availability of the draft Environmental Assessment ....................................................................................................
Notice of availability of the final Environmental Assessment ....................................................................................................
Kimberly D. Bose,
Secretary.
[FR Doc. E8–21153 Filed 9–11–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
ebenthall on PROD1PC60 with NOTICES
September 9, 2008.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP08–591–000
Applicants: Equitrans, L.P.
Description: Equitrans, LP submits
Twenty First Revised Sheet 5 et al to
VerDate Aug<31>2005
15:18 Sep 11, 2008
Jkt 214001
FERC Gas Tariff, Original Volume 1,
effective 10/1/08.
Filed Date: 08/29/2008
Accession Number: 20080903–0031
Comment Date: 5 p.m. Eastern Time
on Friday, September 12, 2008.
Docket Numbers: RP08–602–000
Applicants: Sabine Pipe Line LLC
Description: Sabine Pipe Line LLC
submits a revision to original transmittal
letter dated 8/27/08, correcting
proposed effective date of October 1,
2008 instead of November 1, 2008.
Filed Date: 09/08/2008
Accession Number: 20080908–4000
Comment Date: 5 p.m. Eastern Time
on Monday, September 22, 2008.
Docket Numbers: CP03–342–005
CP03–343–003
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
52975
September 2008.
January 2009.
February 2009.
May 2009.
May 2009.
October 2009.
March 2010.
Applicants: Discovery Gas
Transmission LLC and Discovery
Producer Services LLC
Description: Discovery Gas
Transmission LLC and Discovery
Producer Services LLC submit a joint
abbreviated application to amend the
certificate granted by FERC’s order
issued 5/6/04.
Filed Date: 08/12/2008
Accession Number: 20080818–0056
Comment Date: 5 p.m. Eastern Time
on Friday, September 19, 2008.
Docket Numbers: CP08–30–001
Applicants: Colorado Interstate Gas
Company
Description: Colorado Interstate Gas
Company petitions to amend order to
reflect increased project costs and to
revise initial rates.
E:\FR\FM\12SEN1.SGM
12SEN1
ebenthall on PROD1PC60 with NOTICES
52976
Federal Register / Vol. 73, No. 178 / Friday, September 12, 2008 / Notices
Filed Date: 09/08/2008
Accession Number: 20080908–5081
Comment Date: 5 p.m. Eastern Time
on Friday, September 19, 2008.
Docket Number: CP08–461–000
Applicants: Texas Eastern
Transmission, LP
Description: Texas Eastern
Transmission, LP submits an
application for permission and approval
to abandon 50,000 dekatherms per day
of firm capacity by lease too Discovery
Gas Transmission, LLC.
Filed Date: 08/12/2008
Accession Number: 20080815–0051
Comment Date: 5 p.m. Eastern Time
on Friday, September 19, 2008.
Docket Number: CP08–470–000
Applicants: Questar Pipeline
Company
Description: Questar Pipeline
Company submits an abbreviated
application for abandonment
authorization.
Filed Date: 09/05/2008
Accession Number: 20080905–5146
Comment Date: 5 p.m. Eastern Time
on Friday, September 19, 2008.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
VerDate Aug<31>2005
15:18 Sep 11, 2008
Jkt 214001
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8–21296 Filed 9–11–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings, #1
September 5, 2008.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER00–2508–003.
Applicants: Orion Power Midwest,
L.P., Reliant Energy Mid-Atlantic Power
Holdings.
Description: Reliant Energy MidAtlantic Power Holdings, LLC submits a
Supplement to the June 30, 2008
Triennial Market Update.
Filed Date: 09/02/2008.
Accession Number: 20080902–5148.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 23, 2008.
Docket Numbers: ER01–1403–006;
ER06–1443–002; ER04–366–005; ER01–
2968–007; ER01–845–006; ER05–1122–
004; ER08–107–001.
Applicants: FirstEnergy Operating
Companies, Pennsylvania Power
Company, Jersey Central Power & Light
Company, FirstEnergy Solutions Corp,
FirstEnergy Generation Corporation,
FirstEnergy Nuclear Generation
Corporation, FirstEnergy Generation
Mansfield Unit 1 Corp.
Description: First Energy Service Co
submits the revised pivotal supplier and
market share screen analyses.
Filed Date: 09/02/2008.
Accession Number: 20080904–0579.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 23, 2008.
Docket Numbers: ER01–596–006;
ER01–560–012; ER01–2690–010; ER02–
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
963–010; ER01–2641–012; ER01–558–
011; ER02–2509–007; ER05–524–005;
ER02–77–010; ER02–553–011; ER00–
840–008; ER01–137–006; ER98–1767–
013; ER99–2992–008; ER99–3165–008;
ER94–389–029; ER02–1942–008; ER00–
1780–008; ER01–557–012; ER01–559–
012.
Applicants: Alabama Electric
Marketing, LLC, Big Sandy Peaker Plant,
LLC, California Electric Marketing, LLC,
Crete, Energy Venture, LLC, High Desert
Power Project, LLC, Holland Energy,
LLC, Kiowa Power Partners, LLC,
Lincoln Generating Facility, LLC, New
Mexico Electric Marketing, LLC, Rolling
Hills Generating, L.L.C., Tenaska
Alabama Partners, L.P., Tenaska
Alabama II Partners, L.P., Tenaska
Frontier Partners, Ltd., Tenaska
Gateway Partners, Ltd., Tenaska Georgia
Partners, L.P., Tenaska Power Services
Co, Tenaska Virginia Partners, L.P.,
Texas Electric Marketing, LLC,
University Park Energy, LLC, Wolf Hills
Energy, LLC.
Description: Tenaska Energy, Inc et al.
submit notice of change in status.
Filed Date: 09/02/2008.
Accession Number: 20080904–0506.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 23, 2008.
Docket Numbers: ER04–230–039;
ER01–3155–025; ER01–1385–034;
EL01–45–033.
Applicants: New York Independent
System Operator, Inc.
Description: New York ISO’s Fifteenth
Quarterly Report on efforts to improve
efficient utilization of combined cycle
units within the NYISO markets, and
progress of certain technologies in its
ancillary services markets.
Filed Date: 09/02/2008.
Accession Number: 20080902–5118.
Comment Date: 5 p.m. Eastern Time
on Tuesday, September 23, 2008.
Docket Numbers: ER07–496–001;
ER00–1372–004.
Applicants: Alcoa Power Marketing,
Inc., Alcoa Power Generating, Inc.
Description: Alcoa Power Generating,
Inc et al. submits their updated market
power analysis that supports their
continued market based rate
authorization.
Filed Date: 09/02/2008.
Accession Number: 20080903–0306.
Comment Date: 5 p.m. Eastern Time
on Monday, November 3, 2008.
Docket Numbers: ER07–771–002.
Applicants: E.ON U.S. LLC.
Description: Louisville Gas and
Electric Company et al. submits their
Revised Schedule 2, Reactive Power
Supply and Voltage Control under their
Open Access Transmission Tariff.
Filed Date: 09/02/2008.
E:\FR\FM\12SEN1.SGM
12SEN1
Agencies
[Federal Register Volume 73, Number 178 (Friday, September 12, 2008)]
[Notices]
[Pages 52975-52976]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-21296]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
September 9, 2008.
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Docket Numbers: RP08-591-000
Applicants: Equitrans, L.P.
Description: Equitrans, LP submits Twenty First Revised Sheet 5 et
al to FERC Gas Tariff, Original Volume 1, effective 10/1/08.
Filed Date: 08/29/2008
Accession Number: 20080903-0031
Comment Date: 5 p.m. Eastern Time on Friday, September 12, 2008.
Docket Numbers: RP08-602-000
Applicants: Sabine Pipe Line LLC
Description: Sabine Pipe Line LLC submits a revision to original
transmittal letter dated 8/27/08, correcting proposed effective date of
October 1, 2008 instead of November 1, 2008.
Filed Date: 09/08/2008
Accession Number: 20080908-4000
Comment Date: 5 p.m. Eastern Time on Monday, September 22, 2008.
Docket Numbers: CP03-342-005 CP03-343-003
Applicants: Discovery Gas Transmission LLC and Discovery Producer
Services LLC
Description: Discovery Gas Transmission LLC and Discovery Producer
Services LLC submit a joint abbreviated application to amend the
certificate granted by FERC's order issued 5/6/04.
Filed Date: 08/12/2008
Accession Number: 20080818-0056
Comment Date: 5 p.m. Eastern Time on Friday, September 19, 2008.
Docket Numbers: CP08-30-001
Applicants: Colorado Interstate Gas Company
Description: Colorado Interstate Gas Company petitions to amend
order to reflect increased project costs and to revise initial rates.
[[Page 52976]]
Filed Date: 09/08/2008
Accession Number: 20080908-5081
Comment Date: 5 p.m. Eastern Time on Friday, September 19, 2008.
Docket Number: CP08-461-000
Applicants: Texas Eastern Transmission, LP
Description: Texas Eastern Transmission, LP submits an application
for permission and approval to abandon 50,000 dekatherms per day of
firm capacity by lease too Discovery Gas Transmission, LLC.
Filed Date: 08/12/2008
Accession Number: 20080815-0051
Comment Date: 5 p.m. Eastern Time on Friday, September 19, 2008.
Docket Number: CP08-470-000
Applicants: Questar Pipeline Company
Description: Questar Pipeline Company submits an abbreviated
application for abandonment authorization.
Filed Date: 09/05/2008
Accession Number: 20080905-5146
Comment Date: 5 p.m. Eastern Time on Friday, September 19, 2008.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St. NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive e-mail notification
when a document is added to a subscribed dockets(s). For assistance
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov.
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8-21296 Filed 9-11-08; 8:45 am]
BILLING CODE 6717-01-P