Dalton Hydro LLC, Ampersand Gilman Hydro LP; Notice of Application for Transfer of License, and Soliciting Comments, Motions To Intervene, and Protests, 52340 [E8-20865]
Download as PDF
52340
Federal Register / Vol. 73, No. 175 / Tuesday, September 9, 2008 / Notices
Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any
motion to intervene must also be served
upon each representative of the
Applicants specified in the particular
application.
o. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicants. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicants’ representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–20866 Filed 9–8–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2392–024]
Dalton Hydro LLC, Ampersand Gilman
Hydro LP; Notice of Application for
Transfer of License, and Soliciting
Comments, Motions To Intervene, and
Protests
jlentini on PROD1PC65 with NOTICES
September 3, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Transfer of
License.
b. Project No.: 2392–024.
c. Date Filed: July 25, 2008 and
supplemented on July 31, 2008.
d. Applicants: Dalton Hydro, LLC
(transferor), Ampersand Gilman Hydro
LP (transferee).
e. Name and Location of Project: The
Gilman Project is located on the
Connecticut River in Essex County,
Vermont and Coos County, New
Hampshire.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
g. Applicant Contacts: For the
transferor: Steve Harmsen, City of
Martinsville, WV, C/O West American
Finance Company, 26 North State
Street, Salt Lake City, UT.
For the transferee: A.J. Goulding,
Ampersand Gilman Hydro LP, C/O
London Economics International LLC,
717 Atlantic Avenue, Suite 1A, Boston,
MA 02111.
h. FERC Contact: Robert Bell at (202)
502–6062.
VerDate Aug<31>2005
17:08 Sep 08, 2008
Jkt 214001
i. Deadline for filing comments,
protests, and motions to intervene:
September 30, 2008.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the Project Number on
any comments or motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing a document with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the documents
on that resource agency.
j. Description of Application: The
Applicants seek Commission approval
to transfer the license for the Gilman
Project from Dalton Hydro, LLC to
Ampersand Gilman Hydro LP.
k. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘FERRIS’’ link.
Enter the docket number (P–2392) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the addresses in item g.
above.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
PO 00000
Frm 00080
Fmt 4703
Sfmt 4703
n. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. Any of the above-named
documents must be filed by providing
the original and eight copies to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any
motion to intervene must also be served
upon each representative of the
Applicants specified in the particular
application.
o. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicants. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicants’ representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–20865 Filed 9–8–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[P–13235–000]
Middlebury Electric, LLC; Notice of
Application for Preliminary Permit
Accepted for Filing and Soliciting
Comments, Motions to Intervene, and
Protests
September 2, 2008.
On June 5, 2008, Middlebury Electric,
LLC filed an application, pursuant to
section 4(f) of the Federal Power Act
(FPA), to study the feasibility of
Middlebury Upper Hydroelectric
Project. The proposed project would be
located on the Otter Creek in Addison
County, Vermont. The properties that
would be associated with the proposed
Middlebury Upper Hydroelectric Project
are owned by the applicant.
The proposed project using the
existing properties, including the
sluiceway, intake infrastructure, and
flume, would consist of: (1) A proposed
powerhouse, containing a single 400 kW
generating unit; (2) a proposed penstock
approximately 120 feet long, 7.5 feet
wide; (3) a proposed new transmission
line around 500 feet long; and (4)
appurtenant facilities. The proposed
E:\FR\FM\09SEN1.SGM
09SEN1
Agencies
[Federal Register Volume 73, Number 175 (Tuesday, September 9, 2008)]
[Notices]
[Page 52340]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-20865]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2392-024]
Dalton Hydro LLC, Ampersand Gilman Hydro LP; Notice of
Application for Transfer of License, and Soliciting Comments, Motions
To Intervene, and Protests
September 3, 2008.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Transfer of License.
b. Project No.: 2392-024.
c. Date Filed: July 25, 2008 and supplemented on July 31, 2008.
d. Applicants: Dalton Hydro, LLC (transferor), Ampersand Gilman
Hydro LP (transferee).
e. Name and Location of Project: The Gilman Project is located on
the Connecticut River in Essex County, Vermont and Coos County, New
Hampshire.
f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
g. Applicant Contacts: For the transferor: Steve Harmsen, City of
Martinsville, WV, C/O West American Finance Company, 26 North State
Street, Salt Lake City, UT.
For the transferee: A.J. Goulding, Ampersand Gilman Hydro LP, C/O
London Economics International LLC, 717 Atlantic Avenue, Suite 1A,
Boston, MA 02111.
h. FERC Contact: Robert Bell at (202) 502-6062.
i. Deadline for filing comments, protests, and motions to
intervene: September 30, 2008.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, protests, and
interventions may be filed electronically via the Internet in lieu of
paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link. The Commission
strongly encourages electronic filings. Please include the Project
Number on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing a document with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the documents on that resource agency.
j. Description of Application: The Applicants seek Commission
approval to transfer the license for the Gilman Project from Dalton
Hydro, LLC to Ampersand Gilman Hydro LP.
k. This filing is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``FERRIS'' link. Enter the docket number
(P-2392) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the addresses in item
g. above.
l. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
m. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
n. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'', as applicable, and the Project Number of the
particular application to which the filing refers. Any of the above-
named documents must be filed by providing the original and eight
copies to: The Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. A copy of any motion to
intervene must also be served upon each representative of the
Applicants specified in the particular application.
o. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicants.
If an agency does not file comments within the time specified for
filing comments, it will be presumed to have no comments. One copy of
an agency's comments must also be sent to the Applicants'
representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-20865 Filed 9-8-08; 8:45 am]
BILLING CODE 6717-01-P