CenterPoint Energy Gas Transmission Company; Notice of Application, 51456-51457 [E8-20265]
Download as PDF
sroberts on PROD1PC70 with NOTICES
51456
Federal Register / Vol. 73, No. 171 / Wednesday, September 3, 2008 / Notices
(Algonquin), filed with the Federal
Energy Regulatory Commission
(Commission) applications under
section 7(c) of the Natural Gas Act
(NGA) seeking authorization (i)
construct, install, modify, own, operate
and maintain approximately 1.13 miles
of 20-inch diameter natural gas
transmission pipeline (the Kleen Energy
Lateral), one meter station and all
ancillary facilities, and (ii) implement
initial rates pursuant to Rate Schedules
AFT–CL and AIT–2 and related tariff
revisions for service on the Kleen
Energy Lateral, all as more fully
described in the application.
This filing may be also viewed on the
Web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call (866)
208–3676 or TTY, (202) 502–8659.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Any questions regarding this
application should be directed to: Garth
Johnson, General Manager, Certificates
& Reporting, Algonquin Gas
Transmission, LLC, 5400 Westheimer
Court, P.O. Box 1642, Houston, Texas
77251–1642.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, before the comment date of this
notice, file with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, a
motion to intervene in accordance with
the requirements of the Commission’s
Rules of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10). A
VerDate Aug<31>2005
22:59 Sep 02, 2008
Jkt 214001
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies of all documents
filed by the applicant and by all other
parties. A party must submit 14 copies
of filings made with the Commission
and must mail a copy to the applicant
and to every other party in the
proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link.
Comment Date: September 16, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–20260 Filed 9–2–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–459–000]
CenterPoint Energy Gas Transmission
Company; Notice of Application
August 26, 2008.
Take notice that on August 13, 2008,
CenterPoint Energy Gas Transmission
Company (CEGT), 1111 Louisiana
Street, Houston, Texas 77002, filed in
the above referenced docket an
application pursuant to section 7(b) of
the Natural Gas Act (NGA) for an order
granting a certificate of public
convenience and necessity to abandon,
by sale, its Line 9–1 and one mile of its
Line 9–1–A to Ford Energy (Ford) who,
upon transfer, will operate the facilities
as part of its non-jurisdictional pipeline
system, all as more fully set forth in the
application which is on file with the
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Commission and open to public
inspection. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
The facilities to be abandoned by sale
include 2 miles of 14-inch diameter gas
supply lateral located in Grady County,
Oklahoma known as Line 9–1 as well as
a one mile segment of the 12-inch
diameter Line 9–1–A also located in
Grady County, Oklahoma. The sale price
of the facilities is $29,700.
Any questions regarding this
application should be directed to
Lawrence O. Thomas, Director, Rates &
Regulatory, CenterPoint Energy Gas
Transmission Company, P.O. Box
21734, Shreveport, Louisiana 71151, or
call (318) 429–2804.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
E:\FR\FM\03SEN1.SGM
03SEN1
sroberts on PROD1PC70 with NOTICES
Federal Register / Vol. 73, No. 171 / Wednesday, September 3, 2008 / Notices
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
VerDate Aug<31>2005
22:59 Sep 02, 2008
Jkt 214001
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: September 16, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–20265 Filed 9–2–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2232–556]
Duke Energy Carolinas, LLC; Notice of
Application for Amendment of License
and Soliciting Comments, Motions To
Intervene, and Protests
August 26, 2008.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No: 2232–556.
c. Date filed: August 15, 2008.
d. Applicant: Duke Energy Carolinas.
e. Name of Project: Catawba-Wateree
Project.
f. Location: The project is located on
Lake Norman in Iredell County, North
Carolina. The project does not occupy
federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Kelvin K.
Reagan, Duke Energy Carolinas, Senior
Lake Services Representative, P.O. Box
1006, Charlotte, NC 28201–1006, (704)
382–9386.
i. FERC Contact: Rebecca Martin at
202–502–6012, or e-mail
rebecca.martin@ferc.gov.
j. Deadline for filing comments and/
or motions: September 26, 2008.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Please include the project number (P–
2232–556) on any comments or motions
filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
51457
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Application: The
licensee requests Commission approval
to grant a lease of 2.31 acres to Lake
Cruises, Inc. to expand the Queen’s
Landing True Public Marina to add one
new dock facility that will
accommodate 10 boats, add 13 jet-ski
ports to existing structures, one new
floating dock to be used for rental boats,
and one new floating dock for parking
antique boats. No dredging is required
for this proposal.
l. Location of Application: A copy of
the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, OR ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
E:\FR\FM\03SEN1.SGM
03SEN1
Agencies
[Federal Register Volume 73, Number 171 (Wednesday, September 3, 2008)]
[Notices]
[Pages 51456-51457]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-20265]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP08-459-000]
CenterPoint Energy Gas Transmission Company; Notice of
Application
August 26, 2008.
Take notice that on August 13, 2008, CenterPoint Energy Gas
Transmission Company (CEGT), 1111 Louisiana Street, Houston, Texas
77002, filed in the above referenced docket an application pursuant to
section 7(b) of the Natural Gas Act (NGA) for an order granting a
certificate of public convenience and necessity to abandon, by sale,
its Line 9-1 and one mile of its Line 9-1-A to Ford Energy (Ford) who,
upon transfer, will operate the facilities as part of its non-
jurisdictional pipeline system, all as more fully set forth in the
application which is on file with the Commission and open to public
inspection. The filing may also be viewed on the web at https://
www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
The facilities to be abandoned by sale include 2 miles of 14-inch
diameter gas supply lateral located in Grady County, Oklahoma known as
Line 9-1 as well as a one mile segment of the 12-inch diameter Line 9-
1-A also located in Grady County, Oklahoma. The sale price of the
facilities is $29,700.
Any questions regarding this application should be directed to
Lawrence O. Thomas, Director, Rates & Regulatory, CenterPoint Energy
Gas Transmission Company, P.O. Box 21734, Shreveport, Louisiana 71151,
or call (318) 429-2804.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the
[[Page 51457]]
Commission and will receive copies of all documents filed by the
applicant and by all other parties. A party must submit 14 copies of
filings made with the Commission and must mail a copy to the applicant
and to every other party in the proceeding. Only parties to the
proceeding can ask for court review of Commission orders in the
proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 14 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: September 16, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-20265 Filed 9-2-08; 8:45 am]
BILLING CODE 6717-01-P