Georgia Power Company; Notice of Application for Amendment of License Soliciting Comments, Motions To Intervene, and Protests, 51458-51459 [E8-20263]
Download as PDF
51458
Federal Register / Vol. 73, No. 171 / Wednesday, September 3, 2008 / Notices
application to which the filing refers. A
copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the
‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–20262 Filed 9–2–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2413–104]
Georgia Power Company; Notice of
Application for Amendment of License
Soliciting Comments, Motions To
Intervene, and Protests
sroberts on PROD1PC70 with NOTICES
August 26, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No: 2413–104.
c. Date Filed: May 12, 2008, and
supplemented on August 4, 2008.
d. Applicant: Georgia Power
Company.
e. Name of Project: Wallace Dam
Project.
f. Location: The proposal would be
located immediately adjacent to the
Georgia Highway 44 bridge as it crosses
Lick Creek, on Lake Oconee, in Putnam
County, Georgia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Lee Glenn,
Lake Resources Manager, 125 Wallace
Dam Road NE, Eatonton, GA 31024,
(706) 485–8704.
i. FERC Contact: Isis Johnson,
Telephone (202) 502–6346, and e-mail:
Isis.Johnson@ferc.gov.
VerDate Aug<31>2005
22:59 Sep 02, 2008
Jkt 214001
j. Deadline for filing comments,
motions to intervene, and protests:
September 26, 2008.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The Commission’s Rules of Practice
require all interveners filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervener files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: Georgia
Power Company filed an application
seeking Commission approval to grant
Oconee Bait and Tackle (for Jones
Petroleum) to complete improvements
and modifications to an existing
commercial facility. These
improvements include: (1) Removal of a
single-slip dock; (2) installation of a
boat launching platform for boats in an
adjacent dry-storage facility (located off
project lands); (3) removal of a wharf
dock; (4) removal of a platform that is
currently attached to an existing dock;
(5) removal of a small platform that is
currently attached to an existing ramp
and pier dock; and (6) the extension of
an existing seawall. All structures
would be built in-place and existing
vegetation would remain, or be restored
once construction is complete.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3372 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the
‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–20259 Filed 9–2–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2413–102]
Georgia Power Company; Notice of
Application for Amendment of License
Soliciting Comments, Motions To
Intervene, and Protests
August 26, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
E:\FR\FM\03SEN1.SGM
03SEN1
sroberts on PROD1PC70 with NOTICES
Federal Register / Vol. 73, No. 171 / Wednesday, September 3, 2008 / Notices
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No: 2413–102.
c. Date Filed: May 12, 2008, and
supplemented on July 28, 2008.
d. Applicant: Georgia Power
Company.
e. Name of Project: Wallace Dam
Project.
f. Location: The proposal would be
located less than two miles south of the
Georgia Highway 44 crossing of
Richland Creek, on Lake Oconee, in
Greene County, Georgia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Lee Glenn,
Lake Resources Manager, 125 Wallace
Dam Road NE, Eatonton, GA 31024,
(706) 485–8704.
i. FERC Contact: Isis Johnson,
Telephone (202) 502–6346, and e-mail:
Isis.Johnson@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
September 26, 2008.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The Commission’s Rules of Practice
require all interveners filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervener files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: Georgia
Power Company filed an application
seeking Commission approval to grant
permission to the Linger Longer
Development Company to install a new
10-slip dock, as well as add additional
slips to an existing six-slip dock on Lake
Oconee. An impervious walkway would
also be constructed in association with
the new dock. The new dock and
additional slips would serve the
residents of the Montgomery Place III
subdivision. The proposed structures
would be built in-place and rip-rap
would be used for shoreline
stabilization, if necessary. No dredging
is proposed as part of this application.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
VerDate Aug<31>2005
22:59 Sep 02, 2008
Jkt 214001
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3372 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the
‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–20263 Filed 9–2–08; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
51459
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2413–103]
Georgia Power Company; Notice of
Application for Amendment of License
Soliciting Comments, Motions To
Intervene, and Protests
August 26, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No.: 2413–103.
c. Date Filed: May 12, 2008, and
supplemented on July 28, 2008.
d. Applicant: Georgia Power
Company.
e. Name of Project: Wallace Dam
Project.
f. Location: The proposal would be
located less than two miles south of the
Georgia Highway 44 crossing of
Richland Creek, on Lake Oconee, in
Greene County, Georgia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Lee Glenn,
Lake Resources Manager, 125 Wallace
Dam Road, NE., Eatonton, GA 31024,
(706) 485–8704.
i. FERC Contact: Isis Johnson,
Telephone (202) 502–6346, and e-mail:
Isis.Johnson@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
September 26, 2008.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The Commission’s Rules of Practice
require all interveners filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervener files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: Georgia
Power Company filed an application
seeking Commission approval to grant
permission to the Linger Longer
Development Company to construct a
10-slip boat dock and an impervious
E:\FR\FM\03SEN1.SGM
03SEN1
Agencies
[Federal Register Volume 73, Number 171 (Wednesday, September 3, 2008)]
[Notices]
[Pages 51458-51459]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-20263]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2413-102]
Georgia Power Company; Notice of Application for Amendment of
License Soliciting Comments, Motions To Intervene, and Protests
August 26, 2008.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
[[Page 51459]]
a. Application Type: Non-Project Use of Project Lands and Waters.
b. Project No: 2413-102.
c. Date Filed: May 12, 2008, and supplemented on July 28, 2008.
d. Applicant: Georgia Power Company.
e. Name of Project: Wallace Dam Project.
f. Location: The proposal would be located less than two miles
south of the Georgia Highway 44 crossing of Richland Creek, on Lake
Oconee, in Greene County, Georgia.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Lee Glenn, Lake Resources Manager, 125
Wallace Dam Road NE, Eatonton, GA 31024, (706) 485-8704.
i. FERC Contact: Isis Johnson, Telephone (202) 502-6346, and e-
mail: Isis.Johnson@ferc.gov.
j. Deadline for filing comments, motions to intervene, and
protests: September 26, 2008.
All documents (original and eight copies) should be filed with:
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
The Commission's Rules of Practice require all interveners filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervener files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency. A copy of any motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
k. Description of Request: Georgia Power Company filed an
application seeking Commission approval to grant permission to the
Linger Longer Development Company to install a new 10-slip dock, as
well as add additional slips to an existing six-slip dock on Lake
Oconee. An impervious walkway would also be constructed in association
with the new dock. The new dock and additional slips would serve the
residents of the Montgomery Place III subdivision. The proposed
structures would be built in-place and rip-rap would be used for
shoreline stabilization, if necessary. No dredging is proposed as part
of this application.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via e-mail of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3372 or e-mail
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Any filings must bear in all capital letters the title
``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as applicable,
and the Project Number of the particular application to which the
filing refers.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at https://www.ferc.gov
under the ``e-Filing'' link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-20263 Filed 9-2-08; 8:45 am]
BILLING CODE 6717-01-P