Texas Gas Transmission, LLC; Notice of Application, 50956-50957 [E8-20053]

Download as PDF 50956 Federal Register / Vol. 73, No. 169 / Friday, August 29, 2008 / Notices copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at http: //www.ferc.gov/filing-comments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at http: //www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–13173) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E8–20049 Filed 8–28–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No.: 2801–027] Littleville Power Company, Inc.; Notice Soliciting Scoping Comments mstockstill on PROD1PC66 with NOTICES August 22, 2008. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent Minor License. b. Project No.: P–2801–027. c. Date filed: October 31, 2007. d. Applicant: Littleville Power Company, Inc. e. Name of Project: Glendale Hydroelectric Project. f. Location: On the Housatonic River in the Town of Stockbridge, Berkshire County. The project does not affect federal lands. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Kevin M. Webb, Environmental Affairs Coordinator, Littleville Power Company, Inc., One Tech Drive, Suite 220, Andover, MA 01810, (978) 681–1900 ext. 809, kevin.webb@northamerica.enel.it. i. FERC Contact: Kristen Murphy, (202) 502–6236 or kristen.murphy@ferc.gov. j. Deadline for filing scoping comments: September 22, 2008. All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. k. This application has been accepted, but is not ready for environmental analysis at this time. VerDate Aug<31>2005 17:32 Aug 28, 2008 Jkt 214001 l. As licensed, the existing Glendale Project consists of: (1) A 250-foot long, 30-foot high concrete gravity dam with a 182-foot-long spillway; (2) a 23-acre reservoir; (3) two manually operated 10 by 10-foot intake gates; (4) a 1,500-foot long, 40-foot wide intake canal; (5) a forebay structure and a 250-foot long, 12-foot diameter steel penstock; (6) a powerhouse with four turbines with a combined installed capacity of 1,140kilowatts; (7) a 300-foot long tailrace channel; (8) a step-up transformer and an 83-foot-long 13.8 kilovolt transmission line; and (9) appurtenant facilities. The Housatonic River reach that is bypassed by the project (measured from the gatehouse to the tailrace channel) is about 2,500 feet long. The proposed project would include a new 165-kW turbine unit in the waste gate slot located at the gatehouse adjacent to the project dam. This unit would operate off of a proposed minimum bypassed reach flow of 90 cubic feet per second (cfs) or inflow. In addition, the proposed project would provide additional recreational access through formal canoe portage facilities and parking. The applicant estimates that the total average annual generation, with the proposed additional turbine, would be 5,800 megawatt-hours. The applicant proposes to continue to operate the project in run-of-river mode with an increase in minimum flow in the bypass reach from 10 cfs to 90 cfs or inflow, whichever is less. The purpose of the project is to produce electrical power for sale. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport @ferc.gov or toll-free at 1–866–208– 3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. n. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. Scoping Process The Commission staff intends to prepare a single environmental assessment (EA) for the Glendale Hydroelectric Project in accordance PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 with the National Environmental Policy Act. The EA will consider both sitespecific and cumulative environmental impacts and reasonable alternatives to the proposed action. Commission staff does not propose to conduct any on-site scoping meetings at this time. Instead, we are soliciting comments, recommendations, and information, on the scoping document issued on August 22, 2008. Copies of the scoping document outlining the subject areas to be addressed in the EA were distributed to the parties on the Commission’s mailing list and the applicant’s distribution list. Copies of the scoping document may be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call 1–866–208–3676 or for TTY, (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E8–20047 Filed 8–28–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP07–417–002] Texas Gas Transmission, LLC; Notice of Application August 22, 2008. Take notice that on August 22, 2008, Texas Gas Transmission, LLC (Texas Gas), 3800 Frederica Street, Owensboro, Kentucky 42301, filed in the above referenced docket an application pursuant to section 7(c) of the Natural Gas Act (NGA), and section 157 of the Commission’s regulations to amend the certificate of public convenience and necessity issued on May 2, 2008, in Docket No. CP07–417–000. Specifically, Texas Gas requests authorization to increase in the maximum design capability of the Fayetteville Lateral, located in Arkansas and Mississippi, from 841,000 MMBtu per day to 967,000 MMBtu/d, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll E:\FR\FM\29AUN1.SGM 29AUN1 mstockstill on PROD1PC66 with NOTICES Federal Register / Vol. 73, No. 169 / Friday, August 29, 2008 / Notices free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Kathy D. Fort, Manager, Certificates and Tariffs, Texas Gas Transmission, LLC, 3800 Frederica Street, Owensboro, Kentucky 42301 at (270) 688–6825. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be VerDate Aug<31>2005 17:32 Aug 28, 2008 Jkt 214001 taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: August 29, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–20053 Filed 8–28–08; 8:45 am] BILLING CODE 6717–01–P PO 00000 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. ER07–501–010; ER08–649– 005; ER06–739–014; ER06–738–014] Birchwood Power Partners, L.P., EFS Parlin Holdings LLC, Linden Holding L.L.C., Technologies Linden Venture L.P.; Notice of Filing August 22, 2008. Take notice that on June 27, 2008, Birchwood Power Partners, L.P., EFS Parlin Holdings LLC, Linden Holding L.L.C. and Technologies Linden Venture L.P. filed a triennial market power analysis pursuant to the Commission’s Order 697. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on August 29, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–20052 Filed 8–28–08; 8:45 am] BILLING CODE 6717–01–P Frm 00033 Fmt 4703 50957 Sfmt 4703 E:\FR\FM\29AUN1.SGM 29AUN1

Agencies

[Federal Register Volume 73, Number 169 (Friday, August 29, 2008)]
[Notices]
[Pages 50956-50957]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-20053]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP07-417-002]


Texas Gas Transmission, LLC; Notice of Application

August 22, 2008.
    Take notice that on August 22, 2008, Texas Gas Transmission, LLC 
(Texas Gas), 3800 Frederica Street, Owensboro, Kentucky 42301, filed in 
the above referenced docket an application pursuant to section 7(c) of 
the Natural Gas Act (NGA), and section 157 of the Commission's 
regulations to amend the certificate of public convenience and 
necessity issued on May 2, 2008, in Docket No. CP07-417-000. 
Specifically, Texas Gas requests authorization to increase in the 
maximum design capability of the Fayetteville Lateral, located in 
Arkansas and Mississippi, from 841,000 MMBtu per day to 967,000 MMBtu/
d, all as more fully set forth in the application which is on file with 
the Commission and open to public inspection. The filing may also be 
viewed on the Web at https://www.ferc.gov using the ``eLibrary'' link. 
Enter the docket number excluding the last three digits in the docket 
number field to access the document. For assistance, please contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or toll

[[Page 50957]]

free at (866) 208-3676, or TTY, contact (202) 502-8659.
    Any questions concerning this application may be directed to Kathy 
D. Fort, Manager, Certificates and Tariffs, Texas Gas Transmission, 
LLC, 3800 Frederica Street, Owensboro, Kentucky 42301 at (270) 688-
6825.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 14 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 14 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: August 29, 2008.

Kimberly D. Bose,
Secretary.
[FR Doc. E8-20053 Filed 8-28-08; 8:45 am]