Northern Illinois Hydropower, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approval of Use of the Traditional Licensing Process, 50803 [E8-19932]
Download as PDF
Federal Register / Vol. 73, No. 168 / Thursday, August 28, 2008 / Notices
combined installed capacity of 26megawatts; (2) a new 13,100-foot-long,
230-kilovolt transmission line; and (3)
appurtenant facilities. The proposed
Mississippi River Lock and Dam No. 14
Hydroelectric Project would have an
average annual generation of 145gigawatt-hours, which would be sold to
a local utility.
Applicants Contacts: For Mississippi
River 14 Hydro, LLC, Mr. Brent L.
Smith, COO, Symbiotics, LLC, P. O. Box
535, Rigby, ID 83442, phone: (208) 745–
0834. For BPUS Generation
Development, LLC, Mr. Jeffrey M.
Auser, P.E., BPUS Generation
Development, LLC, 225 Greenfield
Parkway, Suite 201, Liverpool, NY
13088, (315) 413–2821.
FERC Contact: Patricia W. Gillis, (202)
502–8735.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13116 or P–
13115) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–19934 Filed 8–27–08; 8:45 am]
jlentini on PROD1PC65 with NOTICES
BILLING CODE 6717–01–P
VerDate Aug<31>2005
17:36 Aug 27, 2008
Jkt 214001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12626–001]
Northern Illinois Hydropower, LLC;
Notice of Intent To File License
Application, Filing of Pre-Application
Document, and Approval of Use of the
Traditional Licensing Process
August 21, 2008.
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 12626–001.
c. Dated Filed: July 16, 2008.
d. Submitted By: Northern Illinois
Hydropower, LLC.
e. Name of Project: Dresden Island
Hydroelectric Project.
f. Location: The project would be
located at the U.S. Corps of Engineers
Dresden Island Lock and Dam, on the
Illinois River in Grundy County,
Illinois.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Applicant Contact: Damon
Zdunich, President, Northern Illinois
Hydropower, LLC, 801 Oakland
Avenue, Joliet, IL 60435, (312) 408–
4353.
i. FERC Contact: Tom Dean, (202)
502–6041.
j. Northern Illinois Hydropower, LLC
filed its request to use the Traditional
Licensing Process on July 16, 2008.
Northern Illinois Hydropower, LLC filed
public notice of its request on August 4,
2008. In a letter dated August 20, 2008,
the Director of the Office of Energy
Projects approved Northern Illinois
Hydropower, LLC’s request to use the
Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with: (a) the U.S.
Fish and Wildlife Service under section
7 of the Endangered Species Act; and (b)
the Illinois State Historic Preservation
Officer, as required by section 106,
National Historical Preservation Act,
and the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. Northern Illinois Hydropower, LLC
filed a Pre-Application Document (PAD;
including a proposed process plan and
schedule) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
m. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
50803
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, of for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in paragraph h.
Register online at https://ferc.gov/docsfiling/esubscription.asp to be notified
via e-mail of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–19932 Filed 8–27–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12717–001]
Northern Illinois Hydropower, LLC;
Notice of Intent To File License
Application, Filing of Pre-Application
Document, and Approval of Use of the
Traditional Licensing Process
August 21, 2008.
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 12717–001.
c. Date Filed: July 16, 2008.
d. Submitted By: Northern Illinois
Hydropower, LLC.
e. Name of Project: Brandon Road
Hydroelectric Project.
f. Location: The project would be
located at the U.S. Corps of Engineers
Brandon Road Lock and Dam, on the
Des Plaines River in Will County,
Illinois.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Applicant Contact: Damon
Zdunich, President, Northern Illinois
Hydropower, LLC, 801 Oakland
Avenue, Joliet, IL 60435, (312) 408–
4353.
i. FERC Contact: Michael Spencer,
(202) 502–6093.
j. Northern Illinois Hydropower, LLC
filed its request to use the Traditional
Licensing Process on July 16, 2008.
Northern Illinois Hydropower, LLC filed
public notice of its request on August 4,
2008. In a letter dated August 20, 2008,
the Director of the Office of Energy
Projects approved Northern Illinois
Hydropower, LLC’s request to use the
Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with: (a) the U.S.
E:\FR\FM\28AUN1.SGM
28AUN1
Agencies
[Federal Register Volume 73, Number 168 (Thursday, August 28, 2008)]
[Notices]
[Page 50803]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-19932]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12626-001]
Northern Illinois Hydropower, LLC; Notice of Intent To File
License Application, Filing of Pre-Application Document, and Approval
of Use of the Traditional Licensing Process
August 21, 2008.
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 12626-001.
c. Dated Filed: July 16, 2008.
d. Submitted By: Northern Illinois Hydropower, LLC.
e. Name of Project: Dresden Island Hydroelectric Project.
f. Location: The project would be located at the U.S. Corps of
Engineers Dresden Island Lock and Dam, on the Illinois River in Grundy
County, Illinois.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Applicant Contact: Damon Zdunich, President, Northern Illinois
Hydropower, LLC, 801 Oakland Avenue, Joliet, IL 60435, (312) 408-4353.
i. FERC Contact: Tom Dean, (202) 502-6041.
j. Northern Illinois Hydropower, LLC filed its request to use the
Traditional Licensing Process on July 16, 2008. Northern Illinois
Hydropower, LLC filed public notice of its request on August 4, 2008.
In a letter dated August 20, 2008, the Director of the Office of Energy
Projects approved Northern Illinois Hydropower, LLC's request to use
the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with:
(a) the U.S. Fish and Wildlife Service under section 7 of the
Endangered Species Act; and (b) the Illinois State Historic
Preservation Officer, as required by section 106, National Historical
Preservation Act, and the implementing regulations of the Advisory
Council on Historic Preservation at 36 CFR 800.2.
l. Northern Illinois Hydropower, LLC filed a Pre-Application
Document (PAD; including a proposed process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.
m. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, of for TTY,
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in paragraph h.
Register online at https://ferc.gov/docs-filing/esubscription.asp to
be notified via e-mail of new filing and issuances related to this or
other pending projects. For assistance, contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-19932 Filed 8-27-08; 8:45 am]
BILLING CODE 6717-01-P