Ceresco Power and Light; Notice of Application for Preliminary Permit Accepted for Filing and Soliciting Comments, Motions to Intervene, and Protests, 50314-50315 [E8-19685]
Download as PDF
50314
Federal Register / Vol. 73, No. 166 / Tuesday, August 26, 2008 / Notices
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–19692 Filed 8–25–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 459–230]
Ameren/UE; Notice of Application for
Amendment of License and Soliciting
Comments, Motions to Intervene, and
Protests
sroberts on PROD1PC76 with NOTICES
August 19, 2008.
a. Type of Application: Non-project
use of project lands and waters.
b. Project Number: 459–230.
c. Date Filed: July 14, 2008.
Supplemented August 12, 2008.
d. Applicant: Ameren/UE.
e. Name of Project: Osage
Hydroelectric Project.
f. Location: The project is located at
the Mission Bay development near mile
marker 32.1 of the main channel of the
Lake of the Ozarks, in Camden County,
Missouri.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a) 825(r) and 799 and
801.
h. Applicant Contact: Mr. Jeff Green,
Shoreline Supervisor, Ameren/UE, P.O.
Box 993, Lake Ozark, MO 65049, (573)
365–9214.
i. FERC Contact: Any questions on
this notice should be addressed to
Christopher Yeakel at (202) 502–8132,
or e-mail address:
christopher.yeakel@ferc.gov.
j. Deadline for filing comments and or
motions: September 19, 2008.
k. Description of Request: Ameren/UE
requests approval to permit EC
Development, LLC, to construct 8 new
multi-slip boat docks at the Mission Bay
development. The docks would have a
total of 104 boat slips ranging from 12
VerDate Aug<31>2005
00:53 Aug 26, 2008
Jkt 214001
feet long and 12 feet wide to 56 feet long
and 14 feet wide and would include
central walkways 4 feet wide. The docks
would be available to the residents of
the Mission Bay development. The
shoreline within the project boundary is
currently occupied by a new seawall but
is otherwise undeveloped. No dredging,
fuel dispensing, or sewage pumping
facilities are proposed.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field (p-459) to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via e-mail of new filings and
issuances related to this or other
pending projects. For assistance, call
1–866–208–3372 or e-mail
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers (p-459–230). All documents
(original and eight copies) should be
filed with: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington DC
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
20426. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the
‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–19690 Filed 8–25–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13190–000]
Ceresco Power and Light; Notice of
Application for Preliminary Permit
Accepted for Filing and Soliciting
Comments, Motions to Intervene, and
Protests
August 19, 2008.
On April 18, 2008, Ceresco Power and
Light filed an application, pursuant to
section 4(f) of the Federal Power Act
(FPA), to study the feasibility of Ceresco
Hydroelectric Project. The proposed
project would be located on the
Kalamazoo River in Calhoun County,
Michigan. The existing Ceresco Dam is
owned by the applicant. No lands of the
United States are within the proposed
project boundary.
The proposed project using the
existing Ceresco Dam would consist of:
(1) A proposed powerhouse, containing
four turbine-generator units,
switchgears, circuit breakers,
transformers, and a control panel; (2) a
proposed service building; and (3)
appurtenant facilities. The proposed
project would have a total installed
capacity of 800 kilowatts and an average
annual generation of 2.6 gigawatt-hours,
to be sold to a local utility, Consumers
Energy, or the City of Battle Creek, MI.
Applicant Contact: William Morris,
544 West Columbia Avenue, Suite B,
C:\FR\FM\26AUN1.SGM
26AUN1
Federal Register / Vol. 73, No. 166 / Tuesday, August 26, 2008 / Notices
Battle Creek, MI 49015, (269) 968–4242
ext. 105.
FERC Contact: Jake Tung, (202) 502–
8757.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13190) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–19685 Filed 8–25–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2576–083]
FirstLight Hydro Generating Company;
Notice of Application Soliciting
Comments, Motions To Intervene, and
Protests
sroberts on PROD1PC76 with NOTICES
August 19, 2008.
Take notice that Commission staff is
providing an opportunity for public
input regarding additional information
that has been filed regarding a pending
proceeding before the Commission on
the following application:
a. Application Type: Supplement(s) to
Shoreline Management Plan.
b. Project No: 2576–083.
c. Date Filed: July 27, 2006,
supplemented January 18, and June 27,
2008.
d. Applicant: FirstLight Power Hydro
Generating Company.
e. Name of Project: Housatonic River
Hydroelectric Project.
VerDate Aug<31>2005
00:53 Aug 26, 2008
Jkt 214001
f. Location: The project is located on
the Housatonic River, in Fairfield,
Litchfield and New Haven Counties,
Connecticut.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Robert
Gates, Station Manager-Connecticut
Hydro, 143 West St., Ext. Suite E , New
Milford, CT 06776, (860) 350–3617.
i. FERC Contact: Any questions on
this notice should be addressed to Isis
Johnson at (202) 502–6346, or by e-mail:
Isis.Johnson@ferc.gov.
j. Deadline for filing comments and/
or motions: September 19, 2008.
By letter dated December 12, 2007,
and April 30, 2008, the Commission
requested that the applicant file
additional information regarding the
shoreline management plan for the
Housatonic Project. This notice is
intended to grant members of the public
the opportunity to provide comments on
this supplemental information. Any
entity that has previously intervened
with regard to this proceeding is a party
and not required to submit additional
motions. Likewise, all comments that
have been filed with the Commission in
this proceeding are still applicable; as
such, re-filing of comments is not
necessary.
All documents (original and eight
copies) should be filed with: Ms.
Kimberley D. Bose, Secretary, Federal
Energy Regulatory Commission, DHAC,
PJ–12.1, 888 First Street, NE.,
Washington, DC 20426. Please include
the project number (P–2576–083) on any
comments or motions filed. Comments,
protests and interventions may be filed
electronically via the Internet in lieu of
paper. See, 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site under the ‘‘eFiling’’ link. The Commission strongly
encourages electronic filings.
k. Description of Proposal: The
shoreline management plan (SMP) was
filed with the Commission as required
by the project license. The proposed
SMP provides for the maintenance of
safe public access to lake shorelines and
riverfront lands and waters, as well as
for the stewardship and development of
shoreline/riverfront areas. The SMP also
contains provisions to promote the
conservation of land and water-related
resources, in addition to promoting
education and public awareness of
resource protection and management
programs. The SMP also includes
guidelines for permitting new and
existing structures on project lands, and
a fee schedule to recover the
administrative costs of implementing
the permitting program.
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
50315
l. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or call
toll-free 1–866–208–3372, or for TTY,
call (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, 211, 214. In
determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–19689 Filed 8–25–08; 8:45 am]
BILLING CODE 6717–01–P
C:\FR\FM\26AUN1.SGM
26AUN1
Agencies
[Federal Register Volume 73, Number 166 (Tuesday, August 26, 2008)]
[Notices]
[Pages 50314-50315]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-19685]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13190-000]
Ceresco Power and Light; Notice of Application for Preliminary
Permit Accepted for Filing and Soliciting Comments, Motions to
Intervene, and Protests
August 19, 2008.
On April 18, 2008, Ceresco Power and Light filed an application,
pursuant to section 4(f) of the Federal Power Act (FPA), to study the
feasibility of Ceresco Hydroelectric Project. The proposed project
would be located on the Kalamazoo River in Calhoun County, Michigan.
The existing Ceresco Dam is owned by the applicant. No lands of the
United States are within the proposed project boundary.
The proposed project using the existing Ceresco Dam would consist
of: (1) A proposed powerhouse, containing four turbine-generator units,
switchgears, circuit breakers, transformers, and a control panel; (2) a
proposed service building; and (3) appurtenant facilities. The proposed
project would have a total installed capacity of 800 kilowatts and an
average annual generation of 2.6 gigawatt-hours, to be sold to a local
utility, Consumers Energy, or the City of Battle Creek, MI.
Applicant Contact: William Morris, 544 West Columbia Avenue, Suite
B,
[[Page 50315]]
Battle Creek, MI 49015, (269) 968-4242 ext. 105.
FERC Contact: Jake Tung, (202) 502-8757.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of the Commission's Web site at http:/
/www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13190) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-19685 Filed 8-25-08; 8:45 am]
BILLING CODE 6717-01-P