Ceresco Power and Light; Notice of Application for Preliminary Permit Accepted for Filing and Soliciting Comments, Motions to Intervene, and Protests, 50314-50315 [E8-19685]

Download as PDF 50314 Federal Register / Vol. 73, No. 166 / Tuesday, August 26, 2008 / Notices o. Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. E8–19692 Filed 8–25–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 459–230] Ameren/UE; Notice of Application for Amendment of License and Soliciting Comments, Motions to Intervene, and Protests sroberts on PROD1PC76 with NOTICES August 19, 2008. a. Type of Application: Non-project use of project lands and waters. b. Project Number: 459–230. c. Date Filed: July 14, 2008. Supplemented August 12, 2008. d. Applicant: Ameren/UE. e. Name of Project: Osage Hydroelectric Project. f. Location: The project is located at the Mission Bay development near mile marker 32.1 of the main channel of the Lake of the Ozarks, in Camden County, Missouri. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a) 825(r) and 799 and 801. h. Applicant Contact: Mr. Jeff Green, Shoreline Supervisor, Ameren/UE, P.O. Box 993, Lake Ozark, MO 65049, (573) 365–9214. i. FERC Contact: Any questions on this notice should be addressed to Christopher Yeakel at (202) 502–8132, or e-mail address: christopher.yeakel@ferc.gov. j. Deadline for filing comments and or motions: September 19, 2008. k. Description of Request: Ameren/UE requests approval to permit EC Development, LLC, to construct 8 new multi-slip boat docks at the Mission Bay development. The docks would have a total of 104 boat slips ranging from 12 VerDate Aug<31>2005 00:53 Aug 26, 2008 Jkt 214001 feet long and 12 feet wide to 56 feet long and 14 feet wide and would include central walkways 4 feet wide. The docks would be available to the residents of the Mission Bay development. The shoreline within the project boundary is currently occupied by a new seawall but is otherwise undeveloped. No dredging, fuel dispensing, or sewage pumping facilities are proposed. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field (p-459) to access the document. You may also register online at https://www.ferc.gov/ docs-filing/esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3372 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’, OR ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers (p-459–230). All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington DC PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 20426. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘e-Filing’’ link. Kimberly D. Bose, Secretary. [FR Doc. E8–19690 Filed 8–25–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13190–000] Ceresco Power and Light; Notice of Application for Preliminary Permit Accepted for Filing and Soliciting Comments, Motions to Intervene, and Protests August 19, 2008. On April 18, 2008, Ceresco Power and Light filed an application, pursuant to section 4(f) of the Federal Power Act (FPA), to study the feasibility of Ceresco Hydroelectric Project. The proposed project would be located on the Kalamazoo River in Calhoun County, Michigan. The existing Ceresco Dam is owned by the applicant. No lands of the United States are within the proposed project boundary. The proposed project using the existing Ceresco Dam would consist of: (1) A proposed powerhouse, containing four turbine-generator units, switchgears, circuit breakers, transformers, and a control panel; (2) a proposed service building; and (3) appurtenant facilities. The proposed project would have a total installed capacity of 800 kilowatts and an average annual generation of 2.6 gigawatt-hours, to be sold to a local utility, Consumers Energy, or the City of Battle Creek, MI. Applicant Contact: William Morris, 544 West Columbia Avenue, Suite B, C:\FR\FM\26AUN1.SGM 26AUN1 Federal Register / Vol. 73, No. 166 / Tuesday, August 26, 2008 / Notices Battle Creek, MI 49015, (269) 968–4242 ext. 105. FERC Contact: Jake Tung, (202) 502– 8757. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (P–13190) in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3372. Kimberly D. Bose, Secretary. [FR Doc. E8–19685 Filed 8–25–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2576–083] FirstLight Hydro Generating Company; Notice of Application Soliciting Comments, Motions To Intervene, and Protests sroberts on PROD1PC76 with NOTICES August 19, 2008. Take notice that Commission staff is providing an opportunity for public input regarding additional information that has been filed regarding a pending proceeding before the Commission on the following application: a. Application Type: Supplement(s) to Shoreline Management Plan. b. Project No: 2576–083. c. Date Filed: July 27, 2006, supplemented January 18, and June 27, 2008. d. Applicant: FirstLight Power Hydro Generating Company. e. Name of Project: Housatonic River Hydroelectric Project. VerDate Aug<31>2005 00:53 Aug 26, 2008 Jkt 214001 f. Location: The project is located on the Housatonic River, in Fairfield, Litchfield and New Haven Counties, Connecticut. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Robert Gates, Station Manager-Connecticut Hydro, 143 West St., Ext. Suite E , New Milford, CT 06776, (860) 350–3617. i. FERC Contact: Any questions on this notice should be addressed to Isis Johnson at (202) 502–6346, or by e-mail: Isis.Johnson@ferc.gov. j. Deadline for filing comments and/ or motions: September 19, 2008. By letter dated December 12, 2007, and April 30, 2008, the Commission requested that the applicant file additional information regarding the shoreline management plan for the Housatonic Project. This notice is intended to grant members of the public the opportunity to provide comments on this supplemental information. Any entity that has previously intervened with regard to this proceeding is a party and not required to submit additional motions. Likewise, all comments that have been filed with the Commission in this proceeding are still applicable; as such, re-filing of comments is not necessary. All documents (original and eight copies) should be filed with: Ms. Kimberley D. Bose, Secretary, Federal Energy Regulatory Commission, DHAC, PJ–12.1, 888 First Street, NE., Washington, DC 20426. Please include the project number (P–2576–083) on any comments or motions filed. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link. The Commission strongly encourages electronic filings. k. Description of Proposal: The shoreline management plan (SMP) was filed with the Commission as required by the project license. The proposed SMP provides for the maintenance of safe public access to lake shorelines and riverfront lands and waters, as well as for the stewardship and development of shoreline/riverfront areas. The SMP also contains provisions to promote the conservation of land and water-related resources, in addition to promoting education and public awareness of resource protection and management programs. The SMP also includes guidelines for permitting new and existing structures on project lands, and a fee schedule to recover the administrative costs of implementing the permitting program. PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 50315 l. This filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or call toll-free 1–866–208–3372, or for TTY, call (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 211, 214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘RECOMMENDATIONS FOR TERMS AND CONDITIONS’’, ‘‘PROTEST’’, OR ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. E8–19689 Filed 8–25–08; 8:45 am] BILLING CODE 6717–01–P C:\FR\FM\26AUN1.SGM 26AUN1

Agencies

[Federal Register Volume 73, Number 166 (Tuesday, August 26, 2008)]
[Notices]
[Pages 50314-50315]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-19685]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13190-000]


Ceresco Power and Light; Notice of Application for Preliminary 
Permit Accepted for Filing and Soliciting Comments, Motions to 
Intervene, and Protests

August 19, 2008.
    On April 18, 2008, Ceresco Power and Light filed an application, 
pursuant to section 4(f) of the Federal Power Act (FPA), to study the 
feasibility of Ceresco Hydroelectric Project. The proposed project 
would be located on the Kalamazoo River in Calhoun County, Michigan. 
The existing Ceresco Dam is owned by the applicant. No lands of the 
United States are within the proposed project boundary.
    The proposed project using the existing Ceresco Dam would consist 
of: (1) A proposed powerhouse, containing four turbine-generator units, 
switchgears, circuit breakers, transformers, and a control panel; (2) a 
proposed service building; and (3) appurtenant facilities. The proposed 
project would have a total installed capacity of 800 kilowatts and an 
average annual generation of 2.6 gigawatt-hours, to be sold to a local 
utility, Consumers Energy, or the City of Battle Creek, MI.
    Applicant Contact: William Morris, 544 West Columbia Avenue, Suite 
B,

[[Page 50315]]

Battle Creek, MI 49015, (269) 968-4242 ext. 105.
    FERC Contact: Jake Tung, (202) 502-8757.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or 
printed on the ``eLibrary'' link of the Commission's Web site at http:/
/www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13190) in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
 [FR Doc. E8-19685 Filed 8-25-08; 8:45 am]
BILLING CODE 6717-01-P