Mananook Associates; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 50317 [E8-19684]
Download as PDF
sroberts on PROD1PC76 with NOTICES
Federal Register / Vol. 73, No. 166 / Tuesday, August 26, 2008 / Notices
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: October 14, 2008.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Additional study requests and
requests for cooperating agency status
may be filed electronically via the
Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
m. This application is not ready for
environmental analysis at this time.
n. The Flint Creek project consists of:
(1) An existing 2,850 acre reservoir with
31,034 acre-feet of storage at elevation
6,378 feet above mean sea level; (2) an
existing 330-foot-long and 44-foot-high
earth with masonry-core dam; (3) a new
36-inch-diameter by 6,282-foot-long
polymer and/or steel pipeline; (4) a
surge tank; (5) a new 36-inch-diameter
by approximately 1,463-foot-long buried
penstock connecting the surge tank to
the new powerhouse; (6) a new
approximately 30-foot by 40-foot
powerhouse containing one Pelton
turbine-generator unit rated at 2
megawatts; (7) a new approximately 95foot-long buried tailrace; (8) a new
approximately 10-foot by 10-foot fenced
substation located next to the
powerhouse; and (9) all appurtenant
structures. The average annual
generation of the project is
approximately 10 gigawatthours.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item (h) above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
VerDate Aug<31>2005
00:53 Aug 26, 2008
Jkt 214001
processed according to the following
Hydro Licensing Schedule. Revisions to
the schedule will be made as
appropriate.
Issue Deficiency Letter .......
Issue Acceptance letter ......
Issue Scoping Document 1
for comments.
Request Additional Information.
Issue Scoping Document 2
Notice of application is
ready for environmental
analysis.
Notice of the availability of
the environmental analysis.
Ready for Commission’s
decision on the application.
October 2008
November
2008
January 2009
March 2009
May 2009
June 2009
August 2009
September
2009
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–19683 Filed 8–25–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
50317
FERC Contact: Patricia W. Gillis (202)
502–8735.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13144) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. E8–19684 Filed 8–25–08; 8:45 am]
[Project No. 13144–000]
BILLING CODE 6717–01–P
Mananook Associates; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
August 19, 2008.
On March 19, 2008, and
supplemented on August 4, 2008,
Mananook Associates filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Grand Manan
Channel Project, located in the Grand
Manan Channel in Washington County,
Lubec, Maine. The project uses no dam
or impoundment.
The proposed project would consist
of: (1) 1,377 proposed tidal current
generating units, with a total installed
capacity of 72-megawatts, (2) a proposed
transmission line, and (3) appurtenant
facilities. The project is estimated to
have an annual generation of 158gigawatt-hours, which would be sold to
a local utility.
Applicant Contact: Mr. Fred J. Moore,
III, Mananook Associates, P.O. Box 69,
Perry, Maine 04667, phone 207–733–
5513.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13257–000]
Modern Hydro; Notice of Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene and Competing Applications
August 19, 2008.
On July 17, 2008, Modern Hydro filed
an application, pursuant to section 4(f)
of the Federal Power Act (FPA),
proposing to study the feasibility of the
Delhi Project to be located on the south
fork of the Maquoketa River in Delaware
County, Iowa. Existing facilities are
owned by the Lake Delhi Recreation
Association Board.
The proposed project would utilize
the existing Delhi Dam and would
consist of: (1) A powerhouse containing
two turbine generator units with a total
installed capacity of 1.5 MW; (2) a 75
foot long transmission line and; (3)
appurtenant facilities. The annual
C:\FR\FM\26AUN1.SGM
26AUN1
Agencies
[Federal Register Volume 73, Number 166 (Tuesday, August 26, 2008)]
[Notices]
[Page 50317]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-19684]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13144-000]
Mananook Associates; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
August 19, 2008.
On March 19, 2008, and supplemented on August 4, 2008, Mananook
Associates filed an application, pursuant to section 4(f) of the
Federal Power Act, proposing to study the feasibility of the Grand
Manan Channel Project, located in the Grand Manan Channel in Washington
County, Lubec, Maine. The project uses no dam or impoundment.
The proposed project would consist of: (1) 1,377 proposed tidal
current generating units, with a total installed capacity of 72-
megawatts, (2) a proposed transmission line, and (3) appurtenant
facilities. The project is estimated to have an annual generation of
158-gigawatt-hours, which would be sold to a local utility.
Applicant Contact: Mr. Fred J. Moore, III, Mananook Associates,
P.O. Box 69, Perry, Maine 04667, phone 207-733-5513.
FERC Contact: Patricia W. Gillis (202) 502-8735.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of Commission's Web site at https://
www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13144) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-19684 Filed 8-25-08; 8:45 am]