Download as PDF sroberts on PROD1PC76 with NOTICES Federal Register / Vol. 73, No. 166 / Tuesday, August 26, 2008 / Notices the date of filing of the application, and serve a copy of the request on the applicant. l. Deadline for filing additional study requests and requests for cooperating agency status: October 14, 2008. All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Additional study requests and requests for cooperating agency status may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. m. This application is not ready for environmental analysis at this time. n. The Flint Creek project consists of: (1) An existing 2,850 acre reservoir with 31,034 acre-feet of storage at elevation 6,378 feet above mean sea level; (2) an existing 330-foot-long and 44-foot-high earth with masonry-core dam; (3) a new 36-inch-diameter by 6,282-foot-long polymer and/or steel pipeline; (4) a surge tank; (5) a new 36-inch-diameter by approximately 1,463-foot-long buried penstock connecting the surge tank to the new powerhouse; (6) a new approximately 30-foot by 40-foot powerhouse containing one Pelton turbine-generator unit rated at 2 megawatts; (7) a new approximately 95foot-long buried tailrace; (8) a new approximately 10-foot by 10-foot fenced substation located next to the powerhouse; and (9) all appurtenant structures. The average annual generation of the project is approximately 10 gigawatthours. o. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. p. Procedural schedule and final amendments: The application will be VerDate Aug<31>2005 00:53 Aug 26, 2008 Jkt 214001 processed according to the following Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. Issue Deficiency Letter ....... Issue Acceptance letter ...... Issue Scoping Document 1 for comments. Request Additional Information. Issue Scoping Document 2 Notice of application is ready for environmental analysis. Notice of the availability of the environmental analysis. Ready for Commission’s decision on the application. October 2008 November 2008 January 2009 March 2009 May 2009 June 2009 August 2009 September 2009 Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Kimberly D. Bose, Secretary. [FR Doc. E8–19683 Filed 8–25–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY 50317 FERC Contact: Patricia W. Gillis (202) 502–8735. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13144) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Federal Energy Regulatory Commission Kimberly D. Bose, Secretary. [FR Doc. E8–19684 Filed 8–25–08; 8:45 am] [Project No. 13144–000] BILLING CODE 6717–01–P Mananook Associates; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications August 19, 2008. On March 19, 2008, and supplemented on August 4, 2008, Mananook Associates filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Grand Manan Channel Project, located in the Grand Manan Channel in Washington County, Lubec, Maine. The project uses no dam or impoundment. The proposed project would consist of: (1) 1,377 proposed tidal current generating units, with a total installed capacity of 72-megawatts, (2) a proposed transmission line, and (3) appurtenant facilities. The project is estimated to have an annual generation of 158gigawatt-hours, which would be sold to a local utility. Applicant Contact: Mr. Fred J. Moore, III, Mananook Associates, P.O. Box 69, Perry, Maine 04667, phone 207–733– 5513. PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13257–000] Modern Hydro; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene and Competing Applications August 19, 2008. On July 17, 2008, Modern Hydro filed an application, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Delhi Project to be located on the south fork of the Maquoketa River in Delaware County, Iowa. Existing facilities are owned by the Lake Delhi Recreation Association Board. The proposed project would utilize the existing Delhi Dam and would consist of: (1) A powerhouse containing two turbine generator units with a total installed capacity of 1.5 MW; (2) a 75 foot long transmission line and; (3) appurtenant facilities. The annual C:\FR\FM\26AUN1.SGM 26AUN1

Agencies

[Federal Register Volume 73, Number 166 (Tuesday, August 26, 2008)]
[Notices]
[Page 50317]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-19684]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13144-000]


Mananook Associates; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

August 19, 2008.
    On March 19, 2008, and supplemented on August 4, 2008, Mananook 
Associates filed an application, pursuant to section 4(f) of the 
Federal Power Act, proposing to study the feasibility of the Grand 
Manan Channel Project, located in the Grand Manan Channel in Washington 
County, Lubec, Maine. The project uses no dam or impoundment.
    The proposed project would consist of: (1) 1,377 proposed tidal 
current generating units, with a total installed capacity of 72-
megawatts, (2) a proposed transmission line, and (3) appurtenant 
facilities. The project is estimated to have an annual generation of 
158-gigawatt-hours, which would be sold to a local utility.
    Applicant Contact: Mr. Fred J. Moore, III, Mananook Associates, 
P.O. Box 69, Perry, Maine 04667, phone 207-733-5513.
    FERC Contact: Patricia W. Gillis (202) 502-8735.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or 
printed on the ``eLibrary'' link of Commission's Web site at https://
www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13144) in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
 [FR Doc. E8-19684 Filed 8-25-08; 8:45 am]
BILLING CODE 6717-01-P