Download as PDF Federal Register / Vol. 73, No. 164 / Friday, August 22, 2008 / Notices environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: September 4, 2008. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E8–19473 Filed 8–21–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR08–15–002] Energy Transfer Fuel, LP; Notice of Compliance Filing jlentini on PROD1PC65 with NOTICES August 14, 2008. Take notice that on August 11, 2008, Energy Transfer Fuel, LP filed a Statement of Operating Conditions pursuant to section 284.123(e) of the Commission’s regulations and to comply with the July 11, 2008, order issued in Docket Nos. PR08–15–000 and PR08–15–001. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be VerDate Aug<31>2005 17:12 Aug 21, 2008 Jkt 214001 taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed on or before the date as indicated. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment date is: 5 p.m. Eastern Time on Friday, August 22, 2008. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E8–19469 Filed 8–21–08; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8584–8] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 08/11/2008 Through 08/15/2008 Pursuant to 40 CFR 1506.9. EIS No. 20080314, Draft EIS, NOA, OR, Elliott State Forest Habitat Conservation Plan, Proposed Issuance of an Incidental Take Permit, U.S. Army Corps Section 10 and 404 Permits, Coos and Douglas Counties, OR, Comment Period Ends: 11/20/ 2008, Contact: Chuck Wheeler 541– 957–3379. EIS No. 20080315, Second Draft Supplement, BLM, NV, Betze Pit Expansion Project, Development of New Facilities and Expansion of Existing Open-Pit Gold Mining, Eureka and Elko Counties, NV, Comment Period Ends: 10/06/2008, Contact: Kirk Laird 775–753–0272. PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 49667 EIS No. 20080316, Final EIS, BLM, UT, Vernal Field Office Resource Management Plan, To Revise and Integrate the Book Cliff and Diamond Mountain Resource Management Plans, and Analyzing the Management of Non-Wilderness Study Area Lands with Wilderness Characteristic, Implementation, Daggett, Duchesne, Uintah, and Grand Counties, UT, Wait Period Ends: 09/22/2008, Contact: Kelly Buckner 435–781–4400. EIS No. 20080317, Final EIS, FHW, 00, Interstate 73 North Project, Construct on New Alignment, from I–95 to Future I–74 in NC, Funding, U.S. Army COE Section 404 Permit, Dillon and Malboro Counties, SC, and Richmond and Scotland Counties, NC, Wait Period Ends: 09/22/2008, Contact: Patrick L. Tyndall 803–765– 5460. EIS No. 20080318, Final EIS, BLM, WY, Pinedale Resource Management Plan, Implementation, of Public Lands Administered, Pinedale Field Office, Sublette and Lincoln Counties, WY, Wait Period Ends: 09/22/2008, Contact: Ken Peacock 307–775–6113. EIS No. 20080319, Draft EIS, FAA, AK, Sitka Rocky Gutierrez Airport Master Plan, Improvements to the Runway Safety Area, Taxiway. Seaplane Pullout, Approach Lighting System, and the Seawall, U.S. Army COE Section 10 and 404 Permits, NPDES Permit, AK, Comment Period Ends: 10/14/2008, Contact: Patricia Sullivan 907–271–5454. EIS No. 20080320, Draft Supplement, NOA, 00, Amendment 18 to the Fishery Management Plan, Pelagic Fisheries of the Western Pacific Region, Management Modifications for the Hawaii-based Shallow-set Longline Swordfish Fishery, Proposal to Remove Effort Limits, Eliminate the Set Certificate Program and Implement New Sea Turtle Interaction Caps, Comment Period Ends: 10/06/ 2008, Contact: William Robinson 808–944–2200. EIS No. 20080321, Final EIS, FHW, CA, Phase I—CA 11 Corridor Location and Route Adoption and Location Identification of the Otay Mesa East Port of Entry (POE) on Otay Mesa, Presidential Permit for the POE and Acquisition of Right-Of-Way Permit, San Diego County, CA, Wait Period Ends: 09/22/2008, Contact: Cesar E. Perez 916–498–5065. EIS No. 20080322, Final EIS, NRC, GA, Vogtle Electric Generating Plant Site, Early Site Permit (ESP), for the Construction and Operation of a new Nuclear Power Generating Facility Application Approval, Burke County, GA NUREG 1872, Wait Period Ends: E:\FR\FM\22AUN1.SGM 22AUN1 49668 Federal Register / Vol. 73, No. 164 / Friday, August 22, 2008 / Notices 09/22/2008, Contact: Mark D. Notich 301–415–3053. EIS No. 20080323, Final EIS, CGD, 00, Rulemaking for Dry Cargo Residue (DCR) Discharges in the Great Lakes, To Regulate Nonhazardous and Nontoxic DCR Sweeping from Vessels in the Great Lakes that fall under the Jurisdiction of the United States, Wait Period Ends: 09/22/2008, Contact: Gregory Kirkbride 202–372–1479. EIS No. 20080324, Final EIS, BLM, WY, Kemmerer Field Office Planning Area, Resource Management Plan, Implementation, Lincoln, Sweetwater and Uinta Counties, WY, Wait Period Ends: 09/22/2008, Contact: Michele Easley 307–828–4524. EIS No. 20080325, Final EIS, NRC, CA, Generic—License Renewal of Nuclear Plants (GEIS) Regarding Shearon Harris Nuclear Power Plant, Unit 1, Plant-Specific Supplement 33 to NUREG–1437, Wake County, NC, Wait Period Ends: 09/22/2008, Contact: Samuel Hernandez 301–415– 4049. Amended Notices EIS No. 20080282, Draft EIS, UPS, CA, Aliso Viejo Incoming Mail Facility, Proposed Construction and Operation of a Mail Processing Facility on a 25Acre Parcel, Aliso Viejo, Orange County, CA, Comment Period Ends: 10/23/2008, Contact: Emmy Andrews 650–615–7200. Revision to FR Notice Published 7/25/ 2008: Extending Comment Period from 9/08/2008 to 10/23/2008. Dated: August 19, 2008. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E8–19535 Filed 8–21–08; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8584–9] jlentini on PROD1PC65 with NOTICES Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at 202–564–7146. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 6, 2008 (73 FR 19833). VerDate Aug<31>2005 17:12 Aug 21, 2008 Jkt 214001 Draft EISs EIS No. 20080206, ERP No. D–COE– K39112–CA, Middle Harbor Redevelopment Project, Proposal to Increase Container Terminal Efficiency to Accommodate a Portion of the Predicted Future Containerized Cargo, Section 10 and 404 Permits, Port of Long Beach, Los Angeles County, CA. Summary: EPA expressed environmental concerns about unavoidable impacts to air quality, environmental justice communities, aquatic and biological resources. EPA recommended commitments to meet air emission reductions, coordination with the environmental justice community to identify additional measures to offset health impacts, avoidance of fill, and development of a port-wide vessel whale strike avoidance program. Rating EC2. EIS No. 20080230, ERP No. D–COE– K39113–CA, Natomas Levee Improvement Project, Issuing of 408 Permission and 404 Permit, Sacramento Area Flood Control Agency, Sutter and Sacramento, CA. Summary: EPA expressed environmental concerns about the proposal’s compliance with the Clean Water Act Section 404(b)(1) Guidelines and potential impacts to wetlands. EPA also expressed environmental concerns about potential impacts to air quality, as well as the indirect and cumulative impacts of residential development associated with the levee improvement project and the residual flood risk to residential developments in the floodplain. EPA recommended that additional information be provided in the Final EIS regarding compliance with the Section 404(b)(1) Guidelines, floodplain management efforts in the area, and how the project and future development would be consistent with the Natomas Basin Habitat Conservation Plan Rating EC2. EIS No. 20080241, ERP No. D–USN– D11044–00, Virginia Capes (VACAPES) Range Complex, Proposed action is to Support and Conduct Current and Emerging Training and RDT & E Operations, Chesapeake Bay, DE, MD, VA, and NC. Summary: EPA expressed environmental concerns about impacts to the Lower Chesapeake Bay, water quality, marine mammals/threatened and endangered species, historic resources, effects from hazardous materials, and cumulative impacts. Additional information was requested to better assess the impacts. Rating EC2. Final EISs EIS No. 20080247, ERP No. F–NCP– D61060–DC, Smithsonian Institution PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 National Museum of African American History and Culture, Construction and Operation, Between 14th and 15th Streets NW., and Constitution Avenue, NW., and Madison Drive, NW., Washington, DC. Summary: EPA’s previous issues have been resolved; therefore, EPA does not object to the proposed action. Dated: August 19, 2008. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E8–19517 Filed 8–21–08; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–8707–9] Science Advisory Board Staff Office; Notification of a Upcoming Public Teleconference of the Science Advisory Board Ecological Processes and Effects Committee Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: SUMMARY: The Environmental Protection Agency (EPA or Agency) Science Advisory Board (SAB) Staff Office announces a public teleconference of the SAB Ecological Processes and Effects Committee Augmented for the Advisory on EPA’s Aquatic Life Water Quality Criteria. The teleconference is being held to discuss the Committee’s draft advisory report. DATES: The public teleconference will be held on September 16, 2008 from 1 p.m. to 4 p.m. (Eastern Daylight Time). ADDRESSES: The public teleconference will be conducted by telephone only. FOR FURTHER INFORMATION CONTACT: Members of the public who wish to obtain the call-in number and access code to participate in the teleconference may contact Dr. Thomas Armitage, Designated Federal Officer (DFO), EPA Science Advisory Board (1400F), U.S. Environmental Protection Agency, 1200 Pennsylvania Avenue, NW., Washington, DC 20460; telephone/voice mail: (202) 343–9995; fax (202) 233– 0643; or via e-mail at: armitage.thomas@epa.gov. General information about the EPA SAB, as well as any updates concerning the teleconference announced in this notice, may be found on the SAB Web site at https://www.epa.gov/sab. SUPPLEMENTARY INFORMATION: Pursuant to the Federal Advisory Committee Act, Public Law 92–463, notice is hereby given that the SAB Ecological Processes E:\FR\FM\22AUN1.SGM 22AUN1

Agencies

[Federal Register Volume 73, Number 164 (Friday, August 22, 2008)]
[Notices]
[Pages 49667-49668]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-19535]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8584-8]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 08/11/2008 Through 08/15/2008
Pursuant to 40 CFR 1506.9.

EIS No. 20080314, Draft EIS, NOA, OR, Elliott State Forest Habitat 
Conservation Plan, Proposed Issuance of an Incidental Take Permit, U.S. 
Army Corps Section 10 and 404 Permits, Coos and Douglas Counties, OR, 
Comment Period Ends: 11/20/2008, Contact: Chuck Wheeler 541-957-3379.
EIS No. 20080315, Second Draft Supplement, BLM, NV, Betze Pit Expansion 
Project, Development of New Facilities and Expansion of Existing Open-
Pit Gold Mining, Eureka and Elko Counties, NV, Comment Period Ends: 10/
06/2008, Contact: Kirk Laird 775-753-0272.
EIS No. 20080316, Final EIS, BLM, UT, Vernal Field Office Resource 
Management Plan, To Revise and Integrate the Book Cliff and Diamond 
Mountain Resource Management Plans, and Analyzing the Management of 
Non-Wilderness Study Area Lands with Wilderness Characteristic, 
Implementation, Daggett, Duchesne, Uintah, and Grand Counties, UT, Wait 
Period Ends: 09/22/2008, Contact: Kelly Buckner 435-781-4400.
EIS No. 20080317, Final EIS, FHW, 00, Interstate 73 North Project, 
Construct on New Alignment, from I-95 to Future I-74 in NC, Funding, 
U.S. Army COE Section 404 Permit, Dillon and Malboro Counties, SC, and 
Richmond and Scotland Counties, NC, Wait Period Ends: 09/22/2008, 
Contact: Patrick L. Tyndall 803-765-5460.
EIS No. 20080318, Final EIS, BLM, WY, Pinedale Resource Management 
Plan, Implementation, of Public Lands Administered, Pinedale Field 
Office, Sublette and Lincoln Counties, WY, Wait Period Ends: 09/22/
2008, Contact: Ken Peacock 307-775-6113.
EIS No. 20080319, Draft EIS, FAA, AK, Sitka Rocky Gutierrez Airport 
Master Plan, Improvements to the Runway Safety Area, Taxiway. Seaplane 
Pullout, Approach Lighting System, and the Seawall, U.S. Army COE 
Section 10 and 404 Permits, NPDES Permit, AK, Comment Period Ends: 10/
14/2008, Contact: Patricia Sullivan 907-271-5454.
EIS No. 20080320, Draft Supplement, NOA, 00, Amendment 18 to the 
Fishery Management Plan, Pelagic Fisheries of the Western Pacific 
Region, Management Modifications for the Hawaii-based Shallow-set 
Longline Swordfish Fishery, Proposal to Remove Effort Limits, Eliminate 
the Set Certificate Program and Implement New Sea Turtle Interaction 
Caps, Comment Period Ends: 10/06/2008, Contact: William Robinson 808-
944-2200.
EIS No. 20080321, Final EIS, FHW, CA, Phase I--CA 11 Corridor Location 
and Route Adoption and Location Identification of the Otay Mesa East 
Port of Entry (POE) on Otay Mesa, Presidential Permit for the POE and 
Acquisition of Right-Of-Way Permit, San Diego County, CA, Wait Period 
Ends: 09/22/2008, Contact: Cesar E. Perez 916-498-5065.
EIS No. 20080322, Final EIS, NRC, GA, Vogtle Electric Generating Plant 
Site, Early Site Permit (ESP), for the Construction and Operation of a 
new Nuclear Power Generating Facility Application Approval, Burke 
County, GA NUREG 1872, Wait Period Ends:

[[Page 49668]]

09/22/2008, Contact: Mark D. Notich 301-415-3053.
EIS No. 20080323, Final EIS, CGD, 00, Rulemaking for Dry Cargo Residue 
(DCR) Discharges in the Great Lakes, To Regulate Nonhazardous and 
Nontoxic DCR Sweeping from Vessels in the Great Lakes that fall under 
the Jurisdiction of the United States, Wait Period Ends: 09/22/2008, 
Contact: Gregory Kirkbride 202-372-1479.
EIS No. 20080324, Final EIS, BLM, WY, Kemmerer Field Office Planning 
Area, Resource Management Plan, Implementation, Lincoln, Sweetwater and 
Uinta Counties, WY, Wait Period Ends: 09/22/2008, Contact: Michele 
Easley 307-828-4524.
EIS No. 20080325, Final EIS, NRC, CA, Generic--License Renewal of 
Nuclear Plants (GEIS) Regarding Shearon Harris Nuclear Power Plant, 
Unit 1, Plant-Specific Supplement 33 to NUREG-1437, Wake County, NC, 
Wait Period Ends: 09/22/2008, Contact: Samuel Hernandez 301-415-4049.

Amended Notices

EIS No. 20080282, Draft EIS, UPS, CA, Aliso Viejo Incoming Mail 
Facility, Proposed Construction and Operation of a Mail Processing 
Facility on a 25-Acre Parcel, Aliso Viejo, Orange County, CA, Comment 
Period Ends: 10/23/2008, Contact: Emmy Andrews 650-615-7200.
    Revision to FR Notice Published 7/25/2008: Extending Comment Period 
from 9/08/2008 to 10/23/2008.

    Dated: August 19, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
 [FR Doc. E8-19535 Filed 8-21-08; 8:45 am]
BILLING CODE 6560-50-P