Environmental Impacts Statements; Notice of Availability, 49667-49668 [E8-19535]
Download as PDF
Federal Register / Vol. 73, No. 164 / Friday, August 22, 2008 / Notices
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: September 4, 2008.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8–19473 Filed 8–21–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR08–15–002]
Energy Transfer Fuel, LP; Notice of
Compliance Filing
jlentini on PROD1PC65 with NOTICES
August 14, 2008.
Take notice that on August 11, 2008,
Energy Transfer Fuel, LP filed a
Statement of Operating Conditions
pursuant to section 284.123(e) of the
Commission’s regulations and to
comply with the July 11, 2008, order
issued in Docket Nos. PR08–15–000 and
PR08–15–001.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
VerDate Aug<31>2005
17:12 Aug 21, 2008
Jkt 214001
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed on or before
the date as indicated.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment date is: 5 p.m. Eastern Time
on Friday, August 22, 2008.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8–19469 Filed 8–21–08; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8584–8]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 08/11/2008 Through 08/15/2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080314, Draft EIS, NOA, OR,
Elliott State Forest Habitat
Conservation Plan, Proposed Issuance
of an Incidental Take Permit, U.S.
Army Corps Section 10 and 404
Permits, Coos and Douglas Counties,
OR, Comment Period Ends: 11/20/
2008, Contact: Chuck Wheeler 541–
957–3379.
EIS No. 20080315, Second Draft
Supplement, BLM, NV, Betze Pit
Expansion Project, Development of
New Facilities and Expansion of
Existing Open-Pit Gold Mining,
Eureka and Elko Counties, NV,
Comment Period Ends: 10/06/2008,
Contact: Kirk Laird 775–753–0272.
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
49667
EIS No. 20080316, Final EIS, BLM, UT,
Vernal Field Office Resource
Management Plan, To Revise and
Integrate the Book Cliff and Diamond
Mountain Resource Management
Plans, and Analyzing the Management
of Non-Wilderness Study Area Lands
with Wilderness Characteristic,
Implementation, Daggett, Duchesne,
Uintah, and Grand Counties, UT, Wait
Period Ends: 09/22/2008, Contact:
Kelly Buckner 435–781–4400.
EIS No. 20080317, Final EIS, FHW, 00,
Interstate 73 North Project, Construct
on New Alignment, from I–95 to
Future I–74 in NC, Funding, U.S.
Army COE Section 404 Permit, Dillon
and Malboro Counties, SC, and
Richmond and Scotland Counties,
NC, Wait Period Ends: 09/22/2008,
Contact: Patrick L. Tyndall 803–765–
5460.
EIS No. 20080318, Final EIS, BLM, WY,
Pinedale Resource Management Plan,
Implementation, of Public Lands
Administered, Pinedale Field Office,
Sublette and Lincoln Counties, WY,
Wait Period Ends: 09/22/2008,
Contact: Ken Peacock 307–775–6113.
EIS No. 20080319, Draft EIS, FAA, AK,
Sitka Rocky Gutierrez Airport Master
Plan, Improvements to the Runway
Safety Area, Taxiway. Seaplane
Pullout, Approach Lighting System,
and the Seawall, U.S. Army COE
Section 10 and 404 Permits, NPDES
Permit, AK, Comment Period Ends:
10/14/2008, Contact: Patricia Sullivan
907–271–5454.
EIS No. 20080320, Draft Supplement,
NOA, 00, Amendment 18 to the
Fishery Management Plan, Pelagic
Fisheries of the Western Pacific
Region, Management Modifications
for the Hawaii-based Shallow-set
Longline Swordfish Fishery, Proposal
to Remove Effort Limits, Eliminate the
Set Certificate Program and
Implement New Sea Turtle Interaction
Caps, Comment Period Ends: 10/06/
2008, Contact: William Robinson
808–944–2200.
EIS No. 20080321, Final EIS, FHW, CA,
Phase I—CA 11 Corridor Location and
Route Adoption and Location
Identification of the Otay Mesa East
Port of Entry (POE) on Otay Mesa,
Presidential Permit for the POE and
Acquisition of Right-Of-Way Permit,
San Diego County, CA, Wait Period
Ends: 09/22/2008, Contact: Cesar E.
Perez 916–498–5065.
EIS No. 20080322, Final EIS, NRC, GA,
Vogtle Electric Generating Plant Site,
Early Site Permit (ESP), for the
Construction and Operation of a new
Nuclear Power Generating Facility
Application Approval, Burke County,
GA NUREG 1872, Wait Period Ends:
E:\FR\FM\22AUN1.SGM
22AUN1
49668
Federal Register / Vol. 73, No. 164 / Friday, August 22, 2008 / Notices
09/22/2008, Contact: Mark D. Notich
301–415–3053.
EIS No. 20080323, Final EIS, CGD, 00,
Rulemaking for Dry Cargo Residue
(DCR) Discharges in the Great Lakes,
To Regulate Nonhazardous and
Nontoxic DCR Sweeping from Vessels
in the Great Lakes that fall under the
Jurisdiction of the United States, Wait
Period Ends: 09/22/2008, Contact:
Gregory Kirkbride 202–372–1479.
EIS No. 20080324, Final EIS, BLM, WY,
Kemmerer Field Office Planning Area,
Resource Management Plan,
Implementation, Lincoln, Sweetwater
and Uinta Counties, WY, Wait Period
Ends: 09/22/2008, Contact: Michele
Easley 307–828–4524.
EIS No. 20080325, Final EIS, NRC, CA,
Generic—License Renewal of Nuclear
Plants (GEIS) Regarding Shearon
Harris Nuclear Power Plant, Unit 1,
Plant-Specific Supplement 33 to
NUREG–1437, Wake County, NC,
Wait Period Ends: 09/22/2008,
Contact: Samuel Hernandez 301–415–
4049.
Amended Notices
EIS No. 20080282, Draft EIS, UPS, CA,
Aliso Viejo Incoming Mail Facility,
Proposed Construction and Operation
of a Mail Processing Facility on a 25Acre Parcel, Aliso Viejo, Orange
County, CA, Comment Period Ends:
10/23/2008, Contact: Emmy Andrews
650–615–7200.
Revision to FR Notice Published 7/25/
2008: Extending Comment Period from
9/08/2008 to 10/23/2008.
Dated: August 19, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–19535 Filed 8–21–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8584–9]
jlentini on PROD1PC65 with NOTICES
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7146.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated April 6, 2008 (73 FR 19833).
VerDate Aug<31>2005
17:12 Aug 21, 2008
Jkt 214001
Draft EISs
EIS No. 20080206, ERP No. D–COE–
K39112–CA, Middle Harbor
Redevelopment Project, Proposal to
Increase Container Terminal Efficiency
to Accommodate a Portion of the
Predicted Future Containerized Cargo,
Section 10 and 404 Permits, Port of
Long Beach, Los Angeles County, CA.
Summary: EPA expressed
environmental concerns about
unavoidable impacts to air quality,
environmental justice communities,
aquatic and biological resources. EPA
recommended commitments to meet air
emission reductions, coordination with
the environmental justice community to
identify additional measures to offset
health impacts, avoidance of fill, and
development of a port-wide vessel
whale strike avoidance program. Rating
EC2.
EIS No. 20080230, ERP No. D–COE–
K39113–CA, Natomas Levee
Improvement Project, Issuing of 408
Permission and 404 Permit, Sacramento
Area Flood Control Agency, Sutter and
Sacramento, CA.
Summary: EPA expressed
environmental concerns about the
proposal’s compliance with the Clean
Water Act Section 404(b)(1) Guidelines
and potential impacts to wetlands. EPA
also expressed environmental concerns
about potential impacts to air quality, as
well as the indirect and cumulative
impacts of residential development
associated with the levee improvement
project and the residual flood risk to
residential developments in the
floodplain. EPA recommended that
additional information be provided in
the Final EIS regarding compliance with
the Section 404(b)(1) Guidelines,
floodplain management efforts in the
area, and how the project and future
development would be consistent with
the Natomas Basin Habitat Conservation
Plan Rating EC2.
EIS No. 20080241, ERP No. D–USN–
D11044–00, Virginia Capes (VACAPES)
Range Complex, Proposed action is to
Support and Conduct Current and
Emerging Training and RDT & E
Operations, Chesapeake Bay, DE, MD,
VA, and NC.
Summary: EPA expressed
environmental concerns about impacts
to the Lower Chesapeake Bay, water
quality, marine mammals/threatened
and endangered species, historic
resources, effects from hazardous
materials, and cumulative impacts.
Additional information was requested to
better assess the impacts. Rating EC2.
Final EISs
EIS No. 20080247, ERP No. F–NCP–
D61060–DC, Smithsonian Institution
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
National Museum of African American
History and Culture, Construction and
Operation, Between 14th and 15th
Streets NW., and Constitution Avenue,
NW., and Madison Drive, NW.,
Washington, DC.
Summary: EPA’s previous issues have
been resolved; therefore, EPA does not
object to the proposed action.
Dated: August 19, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–19517 Filed 8–21–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–8707–9]
Science Advisory Board Staff Office;
Notification of a Upcoming Public
Teleconference of the Science
Advisory Board Ecological Processes
and Effects Committee
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: The Environmental Protection
Agency (EPA or Agency) Science
Advisory Board (SAB) Staff Office
announces a public teleconference of
the SAB Ecological Processes and
Effects Committee Augmented for the
Advisory on EPA’s Aquatic Life Water
Quality Criteria. The teleconference is
being held to discuss the Committee’s
draft advisory report.
DATES: The public teleconference will
be held on September 16, 2008 from 1
p.m. to 4 p.m. (Eastern Daylight Time).
ADDRESSES: The public teleconference
will be conducted by telephone only.
FOR FURTHER INFORMATION CONTACT:
Members of the public who wish to
obtain the call-in number and access
code to participate in the teleconference
may contact Dr. Thomas Armitage,
Designated Federal Officer (DFO), EPA
Science Advisory Board (1400F), U.S.
Environmental Protection Agency, 1200
Pennsylvania Avenue, NW.,
Washington, DC 20460; telephone/voice
mail: (202) 343–9995; fax (202) 233–
0643; or via e-mail at:
armitage.thomas@epa.gov. General
information about the EPA SAB, as well
as any updates concerning the
teleconference announced in this notice,
may be found on the SAB Web site at
https://www.epa.gov/sab.
SUPPLEMENTARY INFORMATION: Pursuant
to the Federal Advisory Committee Act,
Public Law 92–463, notice is hereby
given that the SAB Ecological Processes
E:\FR\FM\22AUN1.SGM
22AUN1
Agencies
[Federal Register Volume 73, Number 164 (Friday, August 22, 2008)]
[Notices]
[Pages 49667-49668]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-19535]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8584-8]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 08/11/2008 Through 08/15/2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080314, Draft EIS, NOA, OR, Elliott State Forest Habitat
Conservation Plan, Proposed Issuance of an Incidental Take Permit, U.S.
Army Corps Section 10 and 404 Permits, Coos and Douglas Counties, OR,
Comment Period Ends: 11/20/2008, Contact: Chuck Wheeler 541-957-3379.
EIS No. 20080315, Second Draft Supplement, BLM, NV, Betze Pit Expansion
Project, Development of New Facilities and Expansion of Existing Open-
Pit Gold Mining, Eureka and Elko Counties, NV, Comment Period Ends: 10/
06/2008, Contact: Kirk Laird 775-753-0272.
EIS No. 20080316, Final EIS, BLM, UT, Vernal Field Office Resource
Management Plan, To Revise and Integrate the Book Cliff and Diamond
Mountain Resource Management Plans, and Analyzing the Management of
Non-Wilderness Study Area Lands with Wilderness Characteristic,
Implementation, Daggett, Duchesne, Uintah, and Grand Counties, UT, Wait
Period Ends: 09/22/2008, Contact: Kelly Buckner 435-781-4400.
EIS No. 20080317, Final EIS, FHW, 00, Interstate 73 North Project,
Construct on New Alignment, from I-95 to Future I-74 in NC, Funding,
U.S. Army COE Section 404 Permit, Dillon and Malboro Counties, SC, and
Richmond and Scotland Counties, NC, Wait Period Ends: 09/22/2008,
Contact: Patrick L. Tyndall 803-765-5460.
EIS No. 20080318, Final EIS, BLM, WY, Pinedale Resource Management
Plan, Implementation, of Public Lands Administered, Pinedale Field
Office, Sublette and Lincoln Counties, WY, Wait Period Ends: 09/22/
2008, Contact: Ken Peacock 307-775-6113.
EIS No. 20080319, Draft EIS, FAA, AK, Sitka Rocky Gutierrez Airport
Master Plan, Improvements to the Runway Safety Area, Taxiway. Seaplane
Pullout, Approach Lighting System, and the Seawall, U.S. Army COE
Section 10 and 404 Permits, NPDES Permit, AK, Comment Period Ends: 10/
14/2008, Contact: Patricia Sullivan 907-271-5454.
EIS No. 20080320, Draft Supplement, NOA, 00, Amendment 18 to the
Fishery Management Plan, Pelagic Fisheries of the Western Pacific
Region, Management Modifications for the Hawaii-based Shallow-set
Longline Swordfish Fishery, Proposal to Remove Effort Limits, Eliminate
the Set Certificate Program and Implement New Sea Turtle Interaction
Caps, Comment Period Ends: 10/06/2008, Contact: William Robinson 808-
944-2200.
EIS No. 20080321, Final EIS, FHW, CA, Phase I--CA 11 Corridor Location
and Route Adoption and Location Identification of the Otay Mesa East
Port of Entry (POE) on Otay Mesa, Presidential Permit for the POE and
Acquisition of Right-Of-Way Permit, San Diego County, CA, Wait Period
Ends: 09/22/2008, Contact: Cesar E. Perez 916-498-5065.
EIS No. 20080322, Final EIS, NRC, GA, Vogtle Electric Generating Plant
Site, Early Site Permit (ESP), for the Construction and Operation of a
new Nuclear Power Generating Facility Application Approval, Burke
County, GA NUREG 1872, Wait Period Ends:
[[Page 49668]]
09/22/2008, Contact: Mark D. Notich 301-415-3053.
EIS No. 20080323, Final EIS, CGD, 00, Rulemaking for Dry Cargo Residue
(DCR) Discharges in the Great Lakes, To Regulate Nonhazardous and
Nontoxic DCR Sweeping from Vessels in the Great Lakes that fall under
the Jurisdiction of the United States, Wait Period Ends: 09/22/2008,
Contact: Gregory Kirkbride 202-372-1479.
EIS No. 20080324, Final EIS, BLM, WY, Kemmerer Field Office Planning
Area, Resource Management Plan, Implementation, Lincoln, Sweetwater and
Uinta Counties, WY, Wait Period Ends: 09/22/2008, Contact: Michele
Easley 307-828-4524.
EIS No. 20080325, Final EIS, NRC, CA, Generic--License Renewal of
Nuclear Plants (GEIS) Regarding Shearon Harris Nuclear Power Plant,
Unit 1, Plant-Specific Supplement 33 to NUREG-1437, Wake County, NC,
Wait Period Ends: 09/22/2008, Contact: Samuel Hernandez 301-415-4049.
Amended Notices
EIS No. 20080282, Draft EIS, UPS, CA, Aliso Viejo Incoming Mail
Facility, Proposed Construction and Operation of a Mail Processing
Facility on a 25-Acre Parcel, Aliso Viejo, Orange County, CA, Comment
Period Ends: 10/23/2008, Contact: Emmy Andrews 650-615-7200.
Revision to FR Notice Published 7/25/2008: Extending Comment Period
from 9/08/2008 to 10/23/2008.
Dated: August 19, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E8-19535 Filed 8-21-08; 8:45 am]
BILLING CODE 6560-50-P