Hydrodynamics, Inc.; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Terms and Conditions, Recommendations, and Prescriptions, 49665-49666 [E8-19472]

Download as PDF Federal Register / Vol. 73, No. 164 / Friday, August 22, 2008 / Notices protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceedings. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must (1) Bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION’’, ‘‘COMPETING APPLICATION’’, ‘‘COMMENTS’’, ‘‘REPLY COMMENTS’’, ‘‘RECOMMENDATIONS’’, ‘‘TERMS AND CONDITIONS’’, or ‘‘PRESCRIPTIONS’’; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the applications directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to these applications must be accompanied by proof of service on all persons listed in the service lists prepared by the Commission in these proceedings, in accordance with 18 CFR 4.34(b) and 385.2010. o. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification(s); (2) a copy of the request(s) for certification, including proof of the date on which the certifying agency received the request(s); or (3) evidence of waiver(s) of water quality certification. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E8–19471 Filed 8–21–08; 8:45 am] jlentini on PROD1PC65 with NOTICES BILLING CODE 6717–01–P VerDate Aug<31>2005 17:12 Aug 21, 2008 Jkt 214001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12548–002] Hydrodynamics, Inc.; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Terms and Conditions, Recommendations, and Prescriptions August 14, 2008. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Minor unconstructed project. b. Project No.: 12548–002. c. Date filed: April 1, 2008. d. Applicant: Hydrodynamics, Inc. e. Name of Project: Greenfield. f. Location: On the Greenfields Main Canal, part of the U.S. Bureau of Reclamation’s existing Sun River Irrigation Project, in Teton County, Montana, near Fairfield, Montana. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Roger Kirk, Hydrodynamics, Inc., P.O. Box 1136, Bozeman, MT 59771, (406) 587–5086. i. FERC Contact: Dianne Rodman, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426; telephone (202) 502–6077 or by e-mail at dianne.rodman@ferc.gov. j. Deadline for filing motions to intervene and protests, comments, terms and conditions, recommendations, and prescriptions: 60 days from the issuance of this notice. All reply comments must be filed with the Commission within 105 days from the date of this notice. All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. Motions to intervene, protests, comments, terms and conditions, recommendations, and prescriptions may be filed electronically via the Internet in lieu of paper. The PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 49665 Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. k. This application has been accepted for filing and is now ready for environmental analysis. l. The proposed Greenfield Project would be built at the Greenfields Main Canal’s Greenfield drop structure. The applicant proposes to construct: (1) An inflatable weir spanning the width of the canal; (2) an intake structure with trash rack and radial gate or stop-log shut off; (3) a buried, 60-inch-diameter, 530-foot-long steel or polyethylene penstock; (4) a powerhouse containing one Francis or propeller (Reaction) turbine and one generator with a rated output of 600 kilowatts; (5) a tailrace returning flows to the canal; (6) a switchyard; and (7) a 512-foot-long, 12kilovolt transmission line interconnecting with an existing powerline. Average annual generation would be 1.5 gigawatt hours. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits, in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice. A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a development application. A E:\FR\FM\22AUN1.SGM 22AUN1 jlentini on PROD1PC65 with NOTICES 49666 Federal Register / Vol. 73, No. 164 / Friday, August 22, 2008 / Notices notice of intent must be served on the applicant named in this public notice. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION’’, ‘‘COMPETING APPLICATION’’, ‘‘COMMENTS’’, ‘‘REPLY COMMENTS’’, ‘‘RECOMMENDATIONS’’, ‘‘TERMS AND CONDITIONS’’, or ‘‘PRESCRIPTIONS’’; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. License applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E8–19472 Filed 8–21–08; 8:45 am] BILLING CODE 6717–01–P VerDate Aug<31>2005 17:12 Aug 21, 2008 Jkt 214001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP08–454–000] Liberty Gas Storage, LLC; Notice of Application August 14, 2008. Take notice that on July 31, 2008, Liberty Gas Storage, LLC (Liberty Gas), 101 Ash Street, San Diego, CA 92101, filed in the above referenced docket an application pursuant to section 7(c) of the Natural Gas Act (NGA), for an order granting a certificate of public convenience to construct new natural gas storage, comprised of three existing salt dome caverns and the development of a new salt dome cavern, pipeline and appurtenant facilities. The new facilities will be located in Cameron and Calcasieu Parishes, Louisiana, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to William Rapp, Liberty Gas Storage, 101 Ash Street, San Diego, CA 92101 or by phone at (619) 699–5050. Liberty Gas’ new storage project has been designed to provide approximately 18.9 billion cubic feet (Bcf) of working gas capacity with a maximum injection rate of up to 600 million cubic feet (Mcf) per day and a maximum withdrawal rate of up to 1.2 Bcf per day. Additionally, Liberty Gas intends to construct 5.1 miles of 36-inch diameter pipeline to deliver the natural gas to Cameron Interstate Pipeline, LLC, as well as one 18,940 horsepower compressor station, a 4.0 mile brine disposal pipeline and water supply facilities necessary to develop the proposed new cavern. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s E:\FR\FM\22AUN1.SGM 22AUN1

Agencies

[Federal Register Volume 73, Number 164 (Friday, August 22, 2008)]
[Notices]
[Pages 49665-49666]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-19472]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12548-002]


Hydrodynamics, Inc.; Notice of Application Accepted for Filing, 
Soliciting Motions To Intervene and Protests, Ready for Environmental 
Analysis, and Soliciting Comments, Terms and Conditions, 
Recommendations, and Prescriptions

August 14, 2008.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Minor unconstructed project.
    b. Project No.: 12548-002.
    c. Date filed: April 1, 2008.
    d. Applicant: Hydrodynamics, Inc.
    e. Name of Project: Greenfield.
    f. Location: On the Greenfields Main Canal, part of the U.S. Bureau 
of Reclamation's existing Sun River Irrigation Project, in Teton 
County, Montana, near Fairfield, Montana.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Roger Kirk, Hydrodynamics, Inc., P.O. Box 
1136, Bozeman, MT 59771, (406) 587-5086.
    i. FERC Contact: Dianne Rodman, Federal Energy Regulatory 
Commission, 888 First Street, NE., Washington, DC 20426; telephone 
(202) 502-6077 or by e-mail at dianne.rodman@ferc.gov.
    j. Deadline for filing motions to intervene and protests, comments, 
terms and conditions, recommendations, and prescriptions: 60 days from 
the issuance of this notice. All reply comments must be filed with the 
Commission within 105 days from the date of this notice.
    All documents (original and eight copies) should be filed with: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on that resource agency.
    Motions to intervene, protests, comments, terms and conditions, 
recommendations, and prescriptions may be filed electronically via the 
Internet in lieu of paper. The Commission strongly encourages 
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions 
on the Commission's Web site (https://www.ferc.gov) under the ``e-
Filing'' link.
    k. This application has been accepted for filing and is now ready 
for environmental analysis.
    l. The proposed Greenfield Project would be built at the 
Greenfields Main Canal's Greenfield drop structure. The applicant 
proposes to construct: (1) An inflatable weir spanning the width of the 
canal; (2) an intake structure with trash rack and radial gate or stop-
log shut off; (3) a buried, 60-inch-diameter, 530-foot-long steel or 
polyethylene penstock; (4) a powerhouse containing one Francis or 
propeller (Reaction) turbine and one generator with a rated output of 
600 kilowatts; (5) a tailrace returning flows to the canal; (6) a 
switchyard; and (7) a 512-foot-long, 12-kilovolt transmission line 
interconnecting with an existing powerline. Average annual generation 
would be 1.5 gigawatt hours.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number, excluding the last three digits, in the 
docket number field to access the document. For assistance, contact 
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for 
inspection and reproduction at the address in item h above.
    Register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    n. Any qualified applicant desiring to file a competing application 
must submit to the Commission, on or before the specified intervention 
deadline date, a competing development application, or a notice of 
intent to file such an application. Submission of a timely notice of 
intent allows an interested person to file the competing development 
application no later than 120 days after the specified intervention 
deadline date. Applications for preliminary permits will not be 
accepted in response to this notice.
    A notice of intent must specify the exact name, business address, 
and telephone number of the prospective applicant, and must include an 
unequivocal statement of intent to submit a development application. A

[[Page 49666]]

notice of intent must be served on the applicant named in this public 
notice.
    Anyone may submit comments, a protest, or a motion to intervene in 
accordance with the requirements of Rules of Practice and Procedure, 18 
CFR 385.210, 385.211, and 385.214. In determining the appropriate 
action to take, the Commission will consider all protests or other 
comments filed, but only those who file a motion to intervene in 
accordance with the Commission's Rules may become a party to the 
proceeding. Any comments, protests, or motions to intervene must be 
received on or before the specified comment date for the particular 
application.
    All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION'', ``COMPETING APPLICATION'', ``COMMENTS'', 
``REPLY COMMENTS'', ``RECOMMENDATIONS'', ``TERMS AND CONDITIONS'', or 
``PRESCRIPTIONS''; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, 
recommendations, terms and conditions or prescriptions must set forth 
their evidentiary basis and otherwise comply with the requirements of 
18 CFR 4.34(b). Agencies may obtain copies of the application directly 
from the applicant. A copy of any protest or motion to intervene must 
be served upon each representative of the applicant specified in the 
particular application. A copy of all other filings in reference to 
this application must be accompanied by proof of service on all persons 
listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
    o. License applicant must file no later than 60 days following the 
date of issuance of this notice: (1) A copy of the water quality 
certification; (2) a copy of the request for certification, including 
proof of the date on which the certifying agency received the request; 
or (3) evidence of waiver of water quality certification.

Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8-19472 Filed 8-21-08; 8:45 am]