Ha-Best, Inc.; Notice of License Application Amendment, 48208 [E8-18994]

Download as PDF 48208 Federal Register / Vol. 73, No. 160 / Monday, August 18, 2008 / Notices Comment Date: 5 p.m. Eastern Time on August 26, 2008. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E8–18998 Filed 8–15–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12492–001] Ha-Best, Inc.; Notice of License Application Amendment sroberts on PROD1PC70 with NOTICES August 8, 2008. Take notice that the following hydroelectric application amendment has been filed with the Commission and is available for public inspection. a. Type of Application: License Application Amendment for an Original Minor License. b. Project No.: P–12492–001. c. Date Filed: July 31, 2008. d. Applicant: Ha-Best Inc. e. Name of Project: Miner Shoal Waterpower Project. f. Location: The proposed project is located on the Soque River, near the Town of Demorest, Habersham County, Georgia. The proposed project does not occupy federal lands. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Don Ferguson, 34 West Jarrard Street, Cleveland, GA 30528; Telephone (706) 865–3999. i. FERC Contact: Janet Hutzel, Telephone (202) 502–8675, or by e-mail at janet.hutzel@ferc.gov. j. The application is not ready for environmental analysis at this time. k. Project Description: The proposed Minor Shoal Project would consist of the following: (1) An existing 5-foothigh, 80-foot-long diversion dam; (2) an existing 92-foot-long, 7-foot-diameter steel penstock; (3) a new 160-foot-long, 7-foot-diameter steel penstock from the diversion dam tying in to the existing penstock at elevation 1228 feet mean sea level; (4) two existing powerhouses containing a total of three turbines with a total installed capacity of 1,320 kilowatts; and (5) appurtenant facilities. The project would have an annual generation of 2,175,000 kilowatt-hours. l. Locations of the Application Amendment: A copy of the application amendment is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the VerDate Aug<31>2005 16:50 Aug 15, 2008 Jkt 214001 last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. You may also register online at https://www.ferc.gov/esubscribenow.htm to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. m. Procedural Schedule: At this time we do not anticipate the need for preparing a draft environmental assessment (EA). Recipients will have 30 days to provide the Commission with any written comments on the EA. All comments filed with the Commission will be considered in the Order taking final action on the license application. However, should substantive comments requiring re-analysis be received on the EA document, we would consider preparing a subsequent EA document. The application will be processed according to the following Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. Milestone Target date Issue Acceptance or Deficiency Letter. Request Additional Information. Issue Scoping Document 1 for Comments. Issue Scoping Document 2 (if necessary). Notice that application is ready for environmental analysis. Notice of the Availability of the EA. October 2008. October 2008. March 2009. June 2009. June 2009. December 2009. n. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice ready for environmental analysis. Kimberly D. Bose, Secretary. [FR Doc. E8–18994 Filed 8–15–08; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP06–1–010] Florida Gas Transmission Company; Notice of Motion To Vacate Certificate in Part August 11, 2008. Take notice that on August 1, 2008, Florida Gas Transmission Company (FGT), 5444 Westheimer Road, Houston, Texas 77056, filed in Docket No. CP06– 1–010, a motion to vacate the certificate authority granted on June 15, 2006, in Docket No. CP06–1–000, to construct, own, and operate FGT’s Phase VII Expansion Project facilities. FGT states that the planned construction of two 36inch diameter pipeline loops totaling 15.3 miles in Levy and Hernando Counties, Florida, the rewheeling two existing compressor units at FGT’s Station 27 in Hillsborough County, Florida, and the addition of appurtenant facilities, are no longer necessary due to a customer’s decision to terminate its service commitment. FGT seeks to vacate the portion of its certificate that authorizes these facilities. The motion is on file with the Commission and open for public inspection. This motion is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. Any questions regarding the application should be directed to Frazier King or Dawn McGuire, Florida Gas Transmission Company (FGT), 5444 Westheimer Road, Houston, Texas 77056, (713) 998–2132. There are two ways to become involved in the Commission’s review of FGT’s request. First, any person wishing to obtain legal status by becoming a party to this proceeding should, on or before the comment date listed below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by E:\FR\FM\18AUN1.SGM 18AUN1

Agencies

[Federal Register Volume 73, Number 160 (Monday, August 18, 2008)]
[Notices]
[Page 48208]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-18994]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12492-001]


Ha-Best, Inc.; Notice of License Application Amendment

August 8, 2008.
    Take notice that the following hydroelectric application amendment 
has been filed with the Commission and is available for public 
inspection.
    a. Type of Application: License Application Amendment for an 
Original Minor License.
    b. Project No.: P-12492-001.
    c. Date Filed: July 31, 2008.
    d. Applicant: Ha-Best Inc.
    e. Name of Project: Miner Shoal Waterpower Project.
    f. Location: The proposed project is located on the Soque River, 
near the Town of Demorest, Habersham County, Georgia. The proposed 
project does not occupy federal lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Don Ferguson, 34 West Jarrard Street, 
Cleveland, GA 30528; Telephone (706) 865-3999.
    i. FERC Contact: Janet Hutzel, Telephone (202) 502-8675, or by e-
mail at janet.hutzel@ferc.gov.
    j. The application is not ready for environmental analysis at this 
time.
    k. Project Description: The proposed Minor Shoal Project would 
consist of the following: (1) An existing 5-foot-high, 80-foot-long 
diversion dam; (2) an existing 92-foot-long, 7-foot-diameter steel 
penstock; (3) a new 160-foot-long, 7-foot-diameter steel penstock from 
the diversion dam tying in to the existing penstock at elevation 1228 
feet mean sea level; (4) two existing powerhouses containing a total of 
three turbines with a total installed capacity of 1,320 kilowatts; and 
(5) appurtenant facilities. The project would have an annual generation 
of 2,175,000 kilowatt-hours.
    l. Locations of the Application Amendment: A copy of the 
application amendment is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's Web site at 
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, or for TTY, 
(202) 502-8659. A copy is also available for inspection and 
reproduction at the address in item (h) above.
    You may also register online at https://www.ferc.gov/
esubscribenow.htm to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    m. Procedural Schedule: At this time we do not anticipate the need 
for preparing a draft environmental assessment (EA). Recipients will 
have 30 days to provide the Commission with any written comments on the 
EA. All comments filed with the Commission will be considered in the 
Order taking final action on the license application. However, should 
substantive comments requiring re-analysis be received on the EA 
document, we would consider preparing a subsequent EA document. The 
application will be processed according to the following Hydro 
Licensing Schedule. Revisions to the schedule will be made as 
appropriate.

------------------------------------------------------------------------
                Milestone                           Target date
------------------------------------------------------------------------
Issue Acceptance or Deficiency Letter...  October 2008.
Request Additional Information..........  October 2008.
Issue Scoping Document 1 for Comments...  March 2009.
Issue Scoping Document 2 (if necessary).  June 2009.
Notice that application is ready for      June 2009.
 environmental analysis.
Notice of the Availability of the EA....  December 2009.
------------------------------------------------------------------------

    n. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
ready for environmental analysis.

Kimberly D. Bose,
Secretary.
[FR Doc. E8-18994 Filed 8-15-08; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.