Ha-Best, Inc.; Notice of License Application Amendment, 48208 [E8-18994]
Download as PDF
48208
Federal Register / Vol. 73, No. 160 / Monday, August 18, 2008 / Notices
Comment Date: 5 p.m. Eastern Time
on August 26, 2008.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8–18998 Filed 8–15–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12492–001]
Ha-Best, Inc.; Notice of License
Application Amendment
sroberts on PROD1PC70 with NOTICES
August 8, 2008.
Take notice that the following
hydroelectric application amendment
has been filed with the Commission and
is available for public inspection.
a. Type of Application: License
Application Amendment for an Original
Minor License.
b. Project No.: P–12492–001.
c. Date Filed: July 31, 2008.
d. Applicant: Ha-Best Inc.
e. Name of Project: Miner Shoal
Waterpower Project.
f. Location: The proposed project is
located on the Soque River, near the
Town of Demorest, Habersham County,
Georgia. The proposed project does not
occupy federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Don Ferguson,
34 West Jarrard Street, Cleveland, GA
30528; Telephone (706) 865–3999.
i. FERC Contact: Janet Hutzel,
Telephone (202) 502–8675, or by e-mail
at janet.hutzel@ferc.gov.
j. The application is not ready for
environmental analysis at this time.
k. Project Description: The proposed
Minor Shoal Project would consist of
the following: (1) An existing 5-foothigh, 80-foot-long diversion dam; (2) an
existing 92-foot-long, 7-foot-diameter
steel penstock; (3) a new 160-foot-long,
7-foot-diameter steel penstock from the
diversion dam tying in to the existing
penstock at elevation 1228 feet mean sea
level; (4) two existing powerhouses
containing a total of three turbines with
a total installed capacity of 1,320
kilowatts; and (5) appurtenant facilities.
The project would have an annual
generation of 2,175,000 kilowatt-hours.
l. Locations of the Application
Amendment: A copy of the application
amendment is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
VerDate Aug<31>2005
16:50 Aug 15, 2008
Jkt 214001
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202)
502–8659. A copy is also available for
inspection and reproduction at the
address in item (h) above.
You may also register online at
https://www.ferc.gov/esubscribenow.htm
to be notified via e-mail of new filings
and issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
m. Procedural Schedule: At this time
we do not anticipate the need for
preparing a draft environmental
assessment (EA). Recipients will have
30 days to provide the Commission with
any written comments on the EA. All
comments filed with the Commission
will be considered in the Order taking
final action on the license application.
However, should substantive comments
requiring re-analysis be received on the
EA document, we would consider
preparing a subsequent EA document.
The application will be processed
according to the following Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Milestone
Target date
Issue Acceptance or Deficiency Letter.
Request Additional Information.
Issue Scoping Document 1
for Comments.
Issue Scoping Document 2
(if necessary).
Notice that application is
ready for environmental
analysis.
Notice of the Availability of
the EA.
October 2008.
October 2008.
March 2009.
June 2009.
June 2009.
December
2009.
n. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice ready for
environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–18994 Filed 8–15–08; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP06–1–010]
Florida Gas Transmission Company;
Notice of Motion To Vacate Certificate
in Part
August 11, 2008.
Take notice that on August 1, 2008,
Florida Gas Transmission Company
(FGT), 5444 Westheimer Road, Houston,
Texas 77056, filed in Docket No. CP06–
1–010, a motion to vacate the certificate
authority granted on June 15, 2006, in
Docket No. CP06–1–000, to construct,
own, and operate FGT’s Phase VII
Expansion Project facilities. FGT states
that the planned construction of two 36inch diameter pipeline loops totaling
15.3 miles in Levy and Hernando
Counties, Florida, the rewheeling two
existing compressor units at FGT’s
Station 27 in Hillsborough County,
Florida, and the addition of appurtenant
facilities, are no longer necessary due to
a customer’s decision to terminate its
service commitment. FGT seeks to
vacate the portion of its certificate that
authorizes these facilities.
The motion is on file with the
Commission and open for public
inspection. This motion is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
Any questions regarding the
application should be directed to
Frazier King or Dawn McGuire, Florida
Gas Transmission Company (FGT), 5444
Westheimer Road, Houston, Texas
77056, (713) 998–2132.
There are two ways to become
involved in the Commission’s review of
FGT’s request. First, any person wishing
to obtain legal status by becoming a
party to this proceeding should, on or
before the comment date listed below,
file with the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426, a motion to
intervene in accordance with the
requirements of the Commission’s Rules
of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10). A
person obtaining party status will be
placed on the service list maintained by
E:\FR\FM\18AUN1.SGM
18AUN1
Agencies
[Federal Register Volume 73, Number 160 (Monday, August 18, 2008)]
[Notices]
[Page 48208]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-18994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12492-001]
Ha-Best, Inc.; Notice of License Application Amendment
August 8, 2008.
Take notice that the following hydroelectric application amendment
has been filed with the Commission and is available for public
inspection.
a. Type of Application: License Application Amendment for an
Original Minor License.
b. Project No.: P-12492-001.
c. Date Filed: July 31, 2008.
d. Applicant: Ha-Best Inc.
e. Name of Project: Miner Shoal Waterpower Project.
f. Location: The proposed project is located on the Soque River,
near the Town of Demorest, Habersham County, Georgia. The proposed
project does not occupy federal lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Don Ferguson, 34 West Jarrard Street,
Cleveland, GA 30528; Telephone (706) 865-3999.
i. FERC Contact: Janet Hutzel, Telephone (202) 502-8675, or by e-
mail at janet.hutzel@ferc.gov.
j. The application is not ready for environmental analysis at this
time.
k. Project Description: The proposed Minor Shoal Project would
consist of the following: (1) An existing 5-foot-high, 80-foot-long
diversion dam; (2) an existing 92-foot-long, 7-foot-diameter steel
penstock; (3) a new 160-foot-long, 7-foot-diameter steel penstock from
the diversion dam tying in to the existing penstock at elevation 1228
feet mean sea level; (4) two existing powerhouses containing a total of
three turbines with a total installed capacity of 1,320 kilowatts; and
(5) appurtenant facilities. The project would have an annual generation
of 2,175,000 kilowatt-hours.
l. Locations of the Application Amendment: A copy of the
application amendment is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, or for TTY,
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above.
You may also register online at https://www.ferc.gov/
esubscribenow.htm to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
m. Procedural Schedule: At this time we do not anticipate the need
for preparing a draft environmental assessment (EA). Recipients will
have 30 days to provide the Commission with any written comments on the
EA. All comments filed with the Commission will be considered in the
Order taking final action on the license application. However, should
substantive comments requiring re-analysis be received on the EA
document, we would consider preparing a subsequent EA document. The
application will be processed according to the following Hydro
Licensing Schedule. Revisions to the schedule will be made as
appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Issue Acceptance or Deficiency Letter... October 2008.
Request Additional Information.......... October 2008.
Issue Scoping Document 1 for Comments... March 2009.
Issue Scoping Document 2 (if necessary). June 2009.
Notice that application is ready for June 2009.
environmental analysis.
Notice of the Availability of the EA.... December 2009.
------------------------------------------------------------------------
n. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
ready for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-18994 Filed 8-15-08; 8:45 am]
BILLING CODE 6717-01-P