Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 47141-47142 [E8-18732]

Download as PDF Federal Register / Vol. 73, No. 157 / Wednesday, August 13, 2008 / Notices Issued at Washington, DC, on August 7, 2008. Rachel Samuel, Deputy Committee, Management Officer. [FR Doc. E8–18723 Filed 8–12–08; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP07–367–002; CP08–19–001] Columbia Gas Transmission Corporation; Notice of Application ebenthall on PRODPC60 with NOTICES August 6, 2008. Take notice that on July 25, 2008, Columbia Gas Transmission Corporation (Columbia), 1700 MacCorkle Avenue, SE., Charleston, West Virginia 25314, filed, under section 7 of the Natural Gas Act, an application to amend its certificate authorized in Docket Nos. CP07–367–000, CP07–367–001, and CP08–19–000. These filings are available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket numbers excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. Any questions regarding this Application should be directed to Fredric J. George, Lead Counsel, Columbia Gas Transmission Corporation, P.O. Box 1273, Charleston, West Virginia 25325–1273 at (304) 357– 2359 or by fax at (304) 357–3206. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of VerDate Aug<31>2005 15:38 Aug 12, 2008 Jkt 214001 the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the below listed comment date, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 47141 Motions to intervene, protests and comments may be filed electronically via the internet in lieu of paper; see, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Comment Date: August 27, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–18669 Filed 8–12–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1494–349] Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests August 7, 2008. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Non-Project Use of Project Lands and Waters. b. Project No: 1494–349. c. Date Filed: July 18, 2008. d. Applicant: Grand River Dam Authority. e. Name of Project: Pensacola Project. f. Location: The project is located on the Grand (Neosho) River in Craig, Delaware, Mayes, and Ottawa Counties, Oklahoma. The project does not occupy federal or tribal lands. The proposed non-project use would be located along the west shore of Isle’s End Cove, an inlet to Monkey Island, near Afton, Oklahoma. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Ms. Tamara Jahnke, Grand River Dam Authority, P.O. Box 409, Vinita, OK 74301, (918) 256–5545. i. FERC Contact: Lorance Yates at 770–452–3784, or by e-mail: lorance.yates@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: September 8, 2008. k. Description of Application: The licensee requests Commission approval to grant St. Andrew’s Harbor permission to modify its existing docking facilities to include a new dock with eight boat slips and 21 personal water craft (PWC) slips, and one additional boat slip at an existing dock. If approved, St. Andrew’s Harbor would have a total of seven E:\FR\FM\13AUN1.SGM 13AUN1 ebenthall on PRODPC60 with NOTICES 47142 Federal Register / Vol. 73, No. 157 / Wednesday, August 13, 2008 / Notices docks with 56 boat slips and 84 PWC slips. l. Location of Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. All documents (original and eight copies) should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to VerDate Aug<31>2005 15:38 Aug 12, 2008 Jkt 214001 have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘eFiling’’ link. Kimberly D. Bose, Secretary. [FR Doc. E8–18732 Filed 8–12–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12783–002] Inglis Hydropower, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process August 7, 2008. a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 12783–002. c. Dated Filed: June 13, 2008. d. Submitted By: Inglis Hydropower, LLC (Inglis Hydropower). e. Name of Project: Inglis Hydroelectric Project. f. Location: At the existing Inglis Bypass Channel and Spillway on the Withlacoochee River, in the town of Inglis, Levy County, Florida. No federal lands would be occupied by the proposed project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Dean Edwards, Manager, Inglis Hydropower, LLC, PO Box 1565, Dover, FL 33527; (813) 659–3014, (813) 966–4300; e-mail—inglishydro@hotmail.com. i. FERC Contact: Jennifer Adams at (202) 502–83087; or e-mail at jennifer.adams@ferc.gov. j. Inglis Hydropower filed its request to use the Traditional Licensing Process on June 13, 2008. Inglis Hydropower filed public notice of its request on June 23, 2008. In a letter dated August 6, 2008, the Director of the Office of Energy Projects approved Inglis Hydropower’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service and National Marine Fisheries Service (NMFS) under PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, part 402; (b) NMFS under section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920; and (c) the Florida State Historic Preservation Officer, as required by section 106, National Historical Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. Inglis Hydropower filed a PreApplication Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. m. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits, in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov, or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in paragraph h. n. Register online at https://ferc.gov/ esubscribenow.htm to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. E8–18730 Filed 8–12–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13233–000] ORPC Alaska, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications August 7, 2008. On June 2, 2008, ORPC Alaska, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Nenana OCGen River TGU Power Project, located in the Tanana River, within the Unorganized Borough of Yukon- E:\FR\FM\13AUN1.SGM 13AUN1

Agencies

[Federal Register Volume 73, Number 157 (Wednesday, August 13, 2008)]
[Notices]
[Pages 47141-47142]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-18732]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1494-349]


Grand River Dam Authority; Notice of Application for Amendment of 
License and Soliciting Comments, Motions To Intervene, and Protests

August 7, 2008.
    Take notice that the following application has been filed with the 
Commission and is available for public inspection:
    a. Application Type: Non-Project Use of Project Lands and Waters.
    b. Project No: 1494-349.
    c. Date Filed: July 18, 2008.
    d. Applicant: Grand River Dam Authority.
    e. Name of Project: Pensacola Project.
    f. Location: The project is located on the Grand (Neosho) River in 
Craig, Delaware, Mayes, and Ottawa Counties, Oklahoma. The project does 
not occupy federal or tribal lands. The proposed non-project use would 
be located along the west shore of Isle's End Cove, an inlet to Monkey 
Island, near Afton, Oklahoma.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Ms. Tamara Jahnke, Grand River Dam Authority, 
P.O. Box 409, Vinita, OK 74301, (918) 256-5545.
    i. FERC Contact: Lorance Yates at 770-452-3784, or by e-mail: 
lorance.yates@ferc.gov.
    j. Deadline for filing comments, motions to intervene, and 
protests: September 8, 2008.
    k. Description of Application: The licensee requests Commission 
approval to grant St. Andrew's Harbor permission to modify its existing 
docking facilities to include a new dock with eight boat slips and 21 
personal water craft (PWC) slips, and one additional boat slip at an 
existing dock. If approved, St. Andrew's Harbor would have a total of 
seven

[[Page 47142]]

docks with 56 boat slips and 84 PWC slips.
    l. Location of Application: A copy of the application is available 
for inspection and reproduction at the Commission's Public Reference 
Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, 
or by calling (202) 502-8371. This filing may also be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at https://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via e-mail of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filings must 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'', as applicable, and the Project Number of the 
particular application to which the filing refers. All documents 
(original and eight copies) should be filed with: Secretary, Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426. A copy of any motion to intervene must also be served upon each 
representative of the Applicant specified in the particular 
application.
    p. Agency Comments: Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.
    q. Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site at https://www.ferc.gov 
under the ``e-Filing'' link.

Kimberly D. Bose,
Secretary.
[FR Doc. E8-18732 Filed 8-12-08; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.