CenterPoint Energy Gas Transmission Company; Notice of Request Under Blanket Authorization, 47152 [E8-18728]
Download as PDF
47152
Federal Register / Vol. 73, No. 157 / Wednesday, August 13, 2008 / Notices
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on August 22, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–18729 Filed 8–12–08; 8:45 am]
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on August 15, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–18668 Filed 8–12–08; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–456–000]
CenterPoint Energy Gas Transmission
Company; Notice of Request Under
Blanket Authorization
[Docket No. ER08–1242–000]
Sugar Creek Power Company, LLC;
Notice of Filing
August 7, 2008.
ebenthall on PRODPC60 with NOTICES
August 6, 2008.
Take notice that on July 9, 2008,
Northern Indiana Public Service
Company filed a Notice of Cancellation
of the Market-Based Rate Tariff of Sugar
Creek Power Company.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
VerDate Aug<31>2005
15:38 Aug 12, 2008
Jkt 214001
Take notice that on August 5, 2008,
CenterPoint Energy Gas Transmission
Company (CenterPoint), 1111 Louisiana
Street, Houston, Texas, filed in Docket
No. CP08–456–000 a prior notice
request pursuant to sections 157.205 of
the Commission’s regulations under the
Natural Gas Act (NGA), and
CenterPoint’s blanket certificate issued
in Docket No. CP82–384–000 on
September 1, 1982,1 and amended in
Docket No. CP82–384–001 on February
10, 1983.2 CenterPoint seeks
authorization to construct a new
interconnection with Texas Gas
Transmission, LLC (Texas Gas), which
will include the installation of a new
compressor station, in White County,
Arkansas, all as more fully set forth in
the application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
1 20
2 22
PO 00000
FERC ¶ 62,408 (1982).
FERC ¶ 61,148 (1983).
Frm 00027
Fmt 4703
Sfmt 4703
Specifically, CenterPoint proposes to
construct, own and operate the Searcy
Interconnection comprised of a 16-inch
tap, one 2,370 horsepower (hp)
Caterpillar G3608 compressor package,
one 237 hp Generac 150 KW standby
generator, suction and discharge piping,
and ancillary equipment, all in a 9-acre
fenced area within an 18.5 acre parcel
of land on and adjacent to CenterPoint’s
Line J. The project has an estimated cost
of $13,213,955. The initial peak day
design capacity is 125,000 Dekatherms
per day. The project will provide firm
transportation from existing and future
receipt points on CenterPoint’s system
in northern Arkansas to the Fayetteville
Lateral currently being constructed by
Texas Gas.
Any questions regarding this
application should be directed to B.
Michelle Willis, Supervisor—Rate &
Regulatory, CenterPoint Energy Gas
Transmission Company, P.O. Box
21734, Shreveport, Louisiana 71151, or
call (318) 429–2804, FAX (318) 429–
3133, e-mail
michelle.willis@centerpointenergy.com.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the Natural Gas Act
(NGA) (18 CFR 157.205) a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street, NE., Washington, DC
20426.
Comment Date: October 6, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–18728 Filed 8–12–08; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\13AUN1.SGM
13AUN1
Agencies
[Federal Register Volume 73, Number 157 (Wednesday, August 13, 2008)]
[Notices]
[Page 47152]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-18728]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP08-456-000]
CenterPoint Energy Gas Transmission Company; Notice of Request
Under Blanket Authorization
August 7, 2008.
Take notice that on August 5, 2008, CenterPoint Energy Gas
Transmission Company (CenterPoint), 1111 Louisiana Street, Houston,
Texas, filed in Docket No. CP08-456-000 a prior notice request pursuant
to sections 157.205 of the Commission's regulations under the Natural
Gas Act (NGA), and CenterPoint's blanket certificate issued in Docket
No. CP82-384-000 on September 1, 1982,\1\ and amended in Docket No.
CP82-384-001 on February 10, 1983.\2\ CenterPoint seeks authorization
to construct a new interconnection with Texas Gas Transmission, LLC
(Texas Gas), which will include the installation of a new compressor
station, in White County, Arkansas, all as more fully set forth in the
application which is on file with the Commission and open to public
inspection. The filing may also be viewed on the Web at https://
www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
---------------------------------------------------------------------------
\1\ 20 FERC ] 62,408 (1982).
\2\ 22 FERC ] 61,148 (1983).
---------------------------------------------------------------------------
Specifically, CenterPoint proposes to construct, own and operate
the Searcy Interconnection comprised of a 16-inch tap, one 2,370
horsepower (hp) Caterpillar G3608 compressor package, one 237 hp
Generac 150 KW standby generator, suction and discharge piping, and
ancillary equipment, all in a 9-acre fenced area within an 18.5 acre
parcel of land on and adjacent to CenterPoint's Line J. The project has
an estimated cost of $13,213,955. The initial peak day design capacity
is 125,000 Dekatherms per day. The project will provide firm
transportation from existing and future receipt points on CenterPoint's
system in northern Arkansas to the Fayetteville Lateral currently being
constructed by Texas Gas.
Any questions regarding this application should be directed to B.
Michelle Willis, Supervisor--Rate & Regulatory, CenterPoint Energy Gas
Transmission Company, P.O. Box 21734, Shreveport, Louisiana 71151, or
call (318) 429-2804, FAX (318) 429-3133, e-mail
michelle.willis@centerpointenergy.com.
Any person or the Commission's Staff may, within 60 days after the
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and, pursuant to section 157.205 of
the Commission's Regulations under the Natural Gas Act (NGA) (18 CFR
157.205) a protest to the request. If no protest is filed within the
time allowed therefore, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request shall be treated as
an application for authorization pursuant to section 7 of the NGA.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (https://www.ferc.gov) under the ``e-Filing'' link. Persons unable
to file electronically should submit an original and 14 copies of the
protest or intervention to the Federal Energy regulatory Commission,
888 First Street, NE., Washington, DC 20426.
Comment Date: October 6, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-18728 Filed 8-12-08; 8:45 am]