Download as PDF Federal Register / Vol. 73, No. 155 / Monday, August 11, 2008 / Notices only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers (P–2187–004). All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘eFiling’’ link. Kimberly D. Bose, Secretary. [FR Doc. E8–18377 Filed 8–8–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission rmajette on PRODPC74 with NOTICES [Project No. 349–150] Alabama Power Company; Notice of Intent To File License Application, Filing of Pre-Application Document, Commencement of Licensing Proceeding, and Scoping; Request for Comments on the PAD and Scoping Document, and Identification of Issues and Associated Study Requests August 5, 2008. a. Type of Filing: Notice of Intent to File License Application for a New VerDate Aug<31>2005 15:22 Aug 08, 2008 Jkt 214001 License and Commencing Licensing Proceeding. b. Project No.: 349–150. c. Dated Filed: June 5, 2008. d. Submitted by: Alabama Power Company. e. Name of Project: Martin Dam Hydroelectric. f. Location: On the Tallapoosa River, in Tallapoosa, Coosa, and Elmore counties. The project does not occupy federal lands. g. Filed Pursuant to: 18 CFR part 5 of the Commission’s Regulations. h. Potential Applicant Contact: Mr. Jerry L. Stewart, Senior Vice President, Alabama Power Company, 600 North 18th Street, P.O. Box 2641, Birmingham, AL 35291. Tel. (205) 257–6227. i. FERC Contact: Lee Emery at (202) 502–8379 or e-mail at lee.emery@ferc.gov. j. We are asking federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues to cooperate with us in the preparation of the environmental document. Agencies who would like to request cooperating status should follow the instructions for filing comments described in paragraph o below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94 FERC ¶ 61,076 (2001). k. With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR part 402 and (b) the State Historic Preservation Officer, as required by section 106, National Historical Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating Alabama Power Company as the Commission’s non-federal representative for carrying out informal consultation, pursuant to section 7 of the Endangered Species Act and section 106 of the National Historic Preservation Act. m. Alabama Power Company filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 46609 excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in paragraph h. Register online at https://ferc.gov/ esubscribenow.htm to be notified via e-mail of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. With this notice, we are soliciting comments on the PAD and Scoping Document 1 (SD1), as well as study requests. All comments on the PAD and SD1, and study requests should be sent to the address above in paragraph h. In addition, all comments on the PAD and SD1, study requests, requests for cooperating agency status, and all communications to and from Commission staff related to the merits of the potential application (original and eight copies) must be filed with the Commission at the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. All filings with the Commission must include on the first page, the project name (Martin Dam Hydroelectric Project) and number (P–349–150), and bear the heading ‘‘Comments on PreApplication Document,’’ ‘‘Study Requests,’’ ‘‘Comments on Scoping Document 1,’’ ‘‘Request for Cooperating Agency Status,’’ or ‘‘Communications to and from Commission Staff.’’ Any individual or entity interested in submitting study requests, commenting on the PAD or SD1, and any agency requesting cooperating status must do so by October 3, 2008. Comments on the PAD and SD1, study requests, requests for cooperating agency status, and other permissible forms of communications with the Commission may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-filing’’ link. p. Although our current intent is to prepare an environmental assessment (EA), there is the possibility that an Environmental Impact Statement (EIS) will be required. Nevertheless, this meeting will satisfy the NEPA scoping requirements, irrespective of whether an EA or EIS is issued by the Commission. E:\FR\FM\11AUN1.SGM 11AUN1 46610 Federal Register / Vol. 73, No. 155 / Monday, August 11, 2008 / Notices Scoping Meetings Commission staff will hold two scoping meetings in the vicinity of the project at the time and place noted below. The daytime meeting will focus on resource agency, Indian tribes, and non-governmental organization concerns, while the evening meeting is primarily for receiving input from the public. We invite all interested individuals, organizations, and agencies to attend one or both of the meetings, and to assist staff in identifying particular study needs, as well as the scope of environmental issues to be addressed in the environmental document. The times and locations of these meetings are as follows: Daytime Scoping Meeting Date: Thursday, September 11, 2008. Time: 9 a.m. to 12 noon (CST). Location: Central Alabama Community College, Betty Carol Graham Center at Alexander City Campus, 1675 Cherokee Road, Alexander City, AL 35010. Phone: (205) 257–2211. rmajette on PRODPC74 with NOTICES Evening Scoping Meeting Date: Thursday, September 11, 2008. Time: 6 p.m. to 8 p.m. (CST). Location: Central Alabama Community College, Betty Carol Graham Center at Alexander City Campus, 1675 Cherokee Road, Alexander City, AL 35010. Phone: (205) 257–2211. Scoping Document 1 (SD1), which outlines the subject areas to be addressed in the environmental document, was mailed to the individuals and entities on the Commission’s mailing list. Copies of SD1 will be available at the scoping meetings, or may be viewed on the Web at https://www.ferc.gov, using the ‘‘eLibrary’’ link. Follow the directions for accessing information in paragraph n. Based on all oral and written comments, a Scoping Document 2 (SD2) may be issued. SD2 may include a revised process plan and schedule, as well as a list of issues, identified through the scoping process. Site Visit The potential applicant and Commission staff will conduct a site visit of the project on Wednesday, September 10, 2008, starting at 9 a.m. (CST). All participants should meet at the parking lot for the Martin Dam powerhouse, located at 675 Overlook Drive, Dadeville, AL 36853. All participants are responsible for their own transportation to the powerhouse site. Anyone with questions about the site visit should contact Viki Pate, VerDate Aug<31>2005 15:22 Aug 08, 2008 Jkt 214001 Alabama Power Company at (205) 257– 2211 on or before September 3, 2008. Meeting Objectives At the scoping meetings, staff will: (1) Initiate scoping of the issues; (2) review and discuss existing conditions and resource management objectives; (3) review and discuss existing information and identify preliminary information and study needs; (4) review and discuss the process plan and schedule for prefiling activity that incorporates the time frames provided for in Part 5 of the Commission’s regulations and, to the extent possible, maximizes coordination of federal, state, and tribal permitting and certification processes; and (5) discuss the appropriateness of any federal or state agency or Indian tribe acting as a cooperating agency for development of an environmental document. Meeting participants should come prepared to discuss their issues and/or concerns. Please review the PAD in preparation for the scoping meetings. Directions on how to obtain a copy of the PAD and SD1 are included in item n. of this document. Meeting Procedures The meetings will be recorded by a stenographer and will become part of the formal record of the Commission proceeding on the project. Kimberly D. Bose, Secretary. [FR Doc. E8–18471 Filed 8–8–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission P–13174–000] Davis Hydro, LLC.; Notice of Application for Preliminary Permit Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests August 4, 2008. On April 16, 2008, Davis Hydro LLC. filed an application, pursuant to section 4(f) of the Federal Power Act (FPA), to study the feasibility of Boca Power Project. The proposed project would be located on the Little Truckee River in Nevada County, California. The existing facilities are owned and operated by the Bureau of Reclamation. The proposed project using the existing Bureau of Reclamation Boca Power Project would consist of: (1) A proposed approximately eight-foot-long PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 50-inch diameter penstock, (2) a proposed powerhouse, containing one generating unit with an installed capacity of 1.125 megawatts, (3) a proposed 2,000-foot-long, 12 kilovolt transmission line, and (4) appurtenant facilities. The proposed project would have an average annual generation of 5 gigawatt-hours and be sold to a local utility. Applicant Contact: Richard D. Ely, Principal, Davis Hydro LLC., 27264 Meadowbrook Drive, Davis, California 95618, (530) 753–8864, Dick@davishydro.com. FERC Contact: Jake Tung, (202) 502– 8757. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (P–13177) in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3372. Kimberly D. Bose, Secretary. [FR Doc. E8–18376 Filed 8–8–08; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\11AUN1.SGM 11AUN1

Agencies

[Federal Register Volume 73, Number 155 (Monday, August 11, 2008)]
[Notices]
[Pages 46609-46610]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-18471]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 349-150]


Alabama Power Company; Notice of Intent To File License 
Application, Filing of Pre-Application Document, Commencement of 
Licensing Proceeding, and Scoping; Request for Comments on the PAD and 
Scoping Document, and Identification of Issues and Associated Study 
Requests

August 5, 2008.
    a. Type of Filing: Notice of Intent to File License Application for 
a New License and Commencing Licensing Proceeding.
    b. Project No.: 349-150.
    c. Dated Filed: June 5, 2008.
    d. Submitted by: Alabama Power Company.
    e. Name of Project: Martin Dam Hydroelectric.
    f. Location: On the Tallapoosa River, in Tallapoosa, Coosa, and 
Elmore counties. The project does not occupy federal lands.
    g. Filed Pursuant to: 18 CFR part 5 of the Commission's 
Regulations.
    h. Potential Applicant Contact: Mr. Jerry L. Stewart, Senior Vice 
President, Alabama Power Company, 600 North 18th Street, P.O. Box 2641, 
Birmingham, AL 35291. Tel. (205) 257-6227.
    i. FERC Contact: Lee Emery at (202) 502-8379 or e-mail at 
lee.emery@ferc.gov.
    j. We are asking federal, state, local, and tribal agencies with 
jurisdiction and/or special expertise with respect to environmental 
issues to cooperate with us in the preparation of the environmental 
document. Agencies who would like to request cooperating status should 
follow the instructions for filing comments described in paragraph o 
below. Cooperating agencies should note the Commission's policy that 
agencies that cooperate in the preparation of the environmental 
document cannot also intervene. See, 94 FERC ] 61,076 (2001).
    k. With this notice, we are initiating informal consultation with: 
(a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under 
section 7 of the Endangered Species Act and the joint agency 
regulations thereunder at 50 CFR part 402 and (b) the State Historic 
Preservation Officer, as required by section 106, National Historical 
Preservation Act, and the implementing regulations of the Advisory 
Council on Historic Preservation at 36 CFR 800.2.
    l. With this notice, we are designating Alabama Power Company as 
the Commission's non-federal representative for carrying out informal 
consultation, pursuant to section 7 of the Endangered Species Act and 
section 106 of the National Historic Preservation Act.
    m. Alabama Power Company filed a Pre-Application Document (PAD; 
including a proposed process plan and schedule) with the Commission, 
pursuant to 18 CFR 5.6 of the Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, 
(202) 502-8659. A copy is also available for inspection and 
reproduction at the address in paragraph h.
    Register online at https://ferc.gov/esubscribenow.htm to be notified 
via e-mail of new filing and issuances related to this or other pending 
projects. For assistance, contact FERC Online Support.
    o. With this notice, we are soliciting comments on the PAD and 
Scoping Document 1 (SD1), as well as study requests. All comments on 
the PAD and SD1, and study requests should be sent to the address above 
in paragraph h. In addition, all comments on the PAD and SD1, study 
requests, requests for cooperating agency status, and all 
communications to and from Commission staff related to the merits of 
the potential application (original and eight copies) must be filed 
with the Commission at the following address: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426. All filings with the Commission must include on 
the first page, the project name (Martin Dam Hydroelectric Project) and 
number (P-349-150), and bear the heading ``Comments on Pre-Application 
Document,'' ``Study Requests,'' ``Comments on Scoping Document 1,'' 
``Request for Cooperating Agency Status,'' or ``Communications to and 
from Commission Staff.'' Any individual or entity interested in 
submitting study requests, commenting on the PAD or SD1, and any agency 
requesting cooperating status must do so by October 3, 2008.
    Comments on the PAD and SD1, study requests, requests for 
cooperating agency status, and other permissible forms of 
communications with the Commission may be filed electronically via the 
Internet in lieu of paper. The Commission strongly encourages 
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions 
on the Commission's Web site (https://www.ferc.gov) under the ``e-
filing'' link.
    p. Although our current intent is to prepare an environmental 
assessment (EA), there is the possibility that an Environmental Impact 
Statement (EIS) will be required. Nevertheless, this meeting will 
satisfy the NEPA scoping requirements, irrespective of whether an EA or 
EIS is issued by the Commission.

[[Page 46610]]

Scoping Meetings

    Commission staff will hold two scoping meetings in the vicinity of 
the project at the time and place noted below. The daytime meeting will 
focus on resource agency, Indian tribes, and non-governmental 
organization concerns, while the evening meeting is primarily for 
receiving input from the public. We invite all interested individuals, 
organizations, and agencies to attend one or both of the meetings, and 
to assist staff in identifying particular study needs, as well as the 
scope of environmental issues to be addressed in the environmental 
document. The times and locations of these meetings are as follows:

Daytime Scoping Meeting

    Date: Thursday, September 11, 2008.
    Time: 9 a.m. to 12 noon (CST).
    Location: Central Alabama Community College, Betty Carol Graham 
Center at Alexander City Campus, 1675 Cherokee Road, Alexander City, AL 
35010.
    Phone: (205) 257-2211.

Evening Scoping Meeting

    Date: Thursday, September 11, 2008.
    Time: 6 p.m. to 8 p.m. (CST).
    Location: Central Alabama Community College, Betty Carol Graham 
Center at Alexander City Campus, 1675 Cherokee Road, Alexander City, AL 
35010.
    Phone: (205) 257-2211.
    Scoping Document 1 (SD1), which outlines the subject areas to be 
addressed in the environmental document, was mailed to the individuals 
and entities on the Commission's mailing list. Copies of SD1 will be 
available at the scoping meetings, or may be viewed on the Web at 
https://www.ferc.gov, using the ``eLibrary'' link. Follow the directions 
for accessing information in paragraph n. Based on all oral and written 
comments, a Scoping Document 2 (SD2) may be issued. SD2 may include a 
revised process plan and schedule, as well as a list of issues, 
identified through the scoping process.

Site Visit

    The potential applicant and Commission staff will conduct a site 
visit of the project on Wednesday, September 10, 2008, starting at 9 
a.m. (CST). All participants should meet at the parking lot for the 
Martin Dam powerhouse, located at 675 Overlook Drive, Dadeville, AL 
36853. All participants are responsible for their own transportation to 
the powerhouse site. Anyone with questions about the site visit should 
contact Viki Pate, Alabama Power Company at (205) 257-2211 on or before 
September 3, 2008.

Meeting Objectives

    At the scoping meetings, staff will: (1) Initiate scoping of the 
issues; (2) review and discuss existing conditions and resource 
management objectives; (3) review and discuss existing information and 
identify preliminary information and study needs; (4) review and 
discuss the process plan and schedule for pre-filing activity that 
incorporates the time frames provided for in Part 5 of the Commission's 
regulations and, to the extent possible, maximizes coordination of 
federal, state, and tribal permitting and certification processes; and 
(5) discuss the appropriateness of any federal or state agency or 
Indian tribe acting as a cooperating agency for development of an 
environmental document.
    Meeting participants should come prepared to discuss their issues 
and/or concerns. Please review the PAD in preparation for the scoping 
meetings. Directions on how to obtain a copy of the PAD and SD1 are 
included in item n. of this document.

Meeting Procedures

    The meetings will be recorded by a stenographer and will become 
part of the formal record of the Commission proceeding on the project.

Kimberly D. Bose,
Secretary.
 [FR Doc. E8-18471 Filed 8-8-08; 8:45 am]
BILLING CODE 6717-01-P