FFP Ohio River 12, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 46611-46612 [E8-18470]

Download as PDF Federal Register / Vol. 73, No. 155 / Monday, August 11, 2008 / Notices assistance, call toll-free 1–866–208– 3372. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Kimberly D. Bose, Secretary. [FR Doc. E8–18464 Filed 8–8–08; 8:45 am] [Project No. 13149–000] BILLING CODE 6717–01–P FFP Ohio River 1, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications rmajette on PRODPC74 with NOTICES August 5, 2008. On March 25, 2008, FFP Ohio River 1, LLC each filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Ohio River 10 and Ohio River 1 Projects, to be located on the Ohio River in Pulaski County, Illinois and Ballard County, Kentucky. The proposed Ohio River 1 Project consists of: (1) 3,180 proposed 20 kilowatt Free Flow generating units having a total installed capacity of 63.6 megawatts, (2) a proposed transmission line, and (3) appurtenant facilities. The FFP Ohio River 1, LLC, project would have an average annual generation of 278.57 gigawatt-hours and be sold to a local utility. Applicant Contact: Mr. Dan Irvin, FFP Ohio River 1, LLC, 69 Bridge Street, Manchester, MA 01944, phone (978) 232–3536. FERC Contact: Robert Bell, (202) 502– 6062. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (P–13149) in the docket number field to access the document. For VerDate Aug<31>2005 15:22 Aug 08, 2008 Jkt 214001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13156–000; Project No. 13157– 000] FFP Ohio River 10, LLC; FFP Ohio River 11, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications August 5, 2008. On March 25, 2008, FFP Ohio River 10, LLC and FFP Ohio River 11, LLC each filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Ohio River 10 and Ohio River 11 Projects, to be located on the Ohio River in Floyd County, Indiana and Jefferson County, Kentucky. The proposed Ohio River 10 Project consists of: (1) 1,920 proposed 20 kilowatt Free Flow generating units having a total installed capacity of 38.4 megawatts, (2) a proposed transmission line, and (3) appurtenant facilities. The FFP Ohio River 10, LLC, project would have an average annual generation of 168.19 gigawatt-hours and be sold to a local utility. The proposed Ohio River 11 Project consists of: (1) 1,740 proposed 20 kilowatt Free Flow generating units having a total installed capacity of 34.8 megawatts, (2) a proposed transmission line, and (3) appurtenant facilities. The FFP Ohio River 10, LLC, project would have an average annual generation of 236.52 gigawatt-hours and be sold to a local utility. Applicant Contact: Mr. Dan Irvin, FFP Ohio River 10, LLC and FFP Ohio River 11, LLC, 69 Bridge Street, Manchester, MA 01944, phone (978) 232–3536. FERC Contact: Robert Bell, (202) 502– 6062. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 46611 on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (P–13156 or P–13157) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E8–18469 Filed 8–8–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13158–000] FFP Ohio River 12, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications August 5, 2008. On March 25, 2008, FFP Ohio River 12, LLC each filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Ohio River 12 and Ohio River 8 Projects, to be located on the Ohio River in Clark County, Indiana and Jefferson County, Kentucky. The proposed Ohio River 12 Project consists of: (1) 2,700 proposed 20 kilowatt Free Flow generating units having a total installed capacity of 54 megawatts, (2) a proposed transmission line, and (3) appurtenant facilities. The FFP Ohio River 12, LLC, project would have an average annual generation of 236.52 gigawatt-hours and be sold to a local utility. Applicant Contact: Mr. Dan Irvin, FFP Ohio River 12, LLC, 69 Bridge Street, Manchester, MA 01944, phone (978) 232–3536. FERC Contact: Robert Bell, (202) 502– 6062. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 E:\FR\FM\11AUN1.SGM 11AUN1 46612 Federal Register / Vol. 73, No. 155 / Monday, August 11, 2008 / Notices days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (P–13158) in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3372. Kimberly D. Bose, Secretary. [FR Doc. E8–18470 Filed 8–8–08; 8:45 am] BILLING CODE 6717–01–P FERC Contact: Robert Bell, (202) 502– 6062. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (P–13150) in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3372. Kimberly D. Bose, Secretary. [FR Doc. E8–18465 Filed 8–8–08; 8:45 am] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission BILLING CODE 6717–01–P [Project No. 13150–000] have an average annual generation of 210.40 gigawatt-hours and be sold to a local utility. Applicant Contact: Mr. Dan Irvin, FFP Ohio River 7, LLC, 69 Bridge Street, Manchester, MA 01944, phone (978) 232–3536. FERC Contact: Robert Bell, (202) 502– 6062. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https:// www.ferc.gov/filing-comments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–13153) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E8–18466 Filed 8–8–08; 8:45 am] DEPARTMENT OF ENERGY August 5, 2008. rmajette on PRODPC74 with NOTICES FFP Ohio River 2, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications FFP Ohio River 7, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications DEPARTMENT OF ENERGY August 5, 2008. FFP Ohio River 8, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications On March 25, 2008, FFP Ohio River 2, LLC each filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Ohio River 10 and Ohio River 2 Projects, to be located on the Ohio River in Massac County, Illinois and McCracken County, Kentucky. The proposed Ohio River 2 Project consists of: (1) 2,460 proposed 20 kilowatt Free Flow generating units having a total installed capacity of 49.2 megawatts, (2) a proposed transmission line, and (3) appurtenant facilities. The FFP Ohio River 2, LLC, project would have an average annual generation of 215.50 gigawatt-hours and be sold to a local utility. Applicant Contact: Mr. Dan Irvin, FFP Ohio River 2, LLC, 69 Bridge Street, Manchester, MA 01944, phone (978) 232–3536. VerDate Aug<31>2005 15:22 Aug 08, 2008 Jkt 214001 Federal Energy Regulatory Commission BILLING CODE 6717–01–P [Project No. 13153–000] On March 25, 2008, FFP Ohio River 7, LLC each filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Ohio River 10 and Ohio River 7 Projects, to be located on the Ohio River in Perry and Spencer Counties, Indiana and Hancock County, Kentucky. The proposed Ohio River 7 Project consists of: (1) 2,400 proposed 20 kilowatt Free Flow generating units having a total installed capacity of 48 megawatts, (2) a proposed transmission line, and (3) appurtenant facilities. The FFP Ohio River 7, LLC, project would PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Project No. 13154–000] August 5, 2008. On March 25, 2008, FFP Ohio River 8, LLC each filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Ohio River 10 and Ohio River 8 Projects, to be located on the Ohio River in Perry County, Indiana and Hancock County, Kentucky. The proposed Ohio River 8 Project consists of: (1) 1,650 proposed 20 E:\FR\FM\11AUN1.SGM 11AUN1

Agencies

[Federal Register Volume 73, Number 155 (Monday, August 11, 2008)]
[Notices]
[Pages 46611-46612]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-18470]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13158-000]


FFP Ohio River 12, LLC; Notice of Preliminary Permit Applications 
Accepted for Filing and Soliciting Comment, Motions To Intervene, and 
Competing Applications

August 5, 2008.
    On March 25, 2008, FFP Ohio River 12, LLC each filed an 
application, pursuant to section 4(f) of the Federal Power Act, 
proposing to study the feasibility of the Ohio River 12 and Ohio River 
8 Projects, to be located on the Ohio River in Clark County, Indiana 
and Jefferson County, Kentucky.
    The proposed Ohio River 12 Project consists of: (1) 2,700 proposed 
20 kilowatt Free Flow generating units having a total installed 
capacity of 54 megawatts, (2) a proposed transmission line, and (3) 
appurtenant facilities. The FFP Ohio River 12, LLC, project would have 
an average annual generation of 236.52 gigawatt-hours and be sold to a 
local utility.
    Applicant Contact: Mr. Dan Irvin, FFP Ohio River 12, LLC, 69 Bridge 
Street, Manchester, MA 01944, phone (978) 232-3536.
    FERC Contact: Robert Bell, (202) 502-6062.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60

[[Page 46612]]

days from the issuance of this notice. Comments, motions to intervene, 
notices of intent, and competing applications may be filed 
electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the 
instructions on the Commission's Web site under the ``e-Filing'' link. 
If unable to be filed electronically, documents may be paper-filed. To 
paper-file, an original and eight copies should be mailed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426. For more information on how to 
submit these types of filings please go to the Commission's Web site 
located at https://www.ferc.gov/filing-comments.asp. More information 
about this project can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13158) in the docket number field to access 
the document. For assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
[FR Doc. E8-18470 Filed 8-8-08; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.