FFP Ohio River 12, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 46611-46612 [E8-18470]
Download as PDF
Federal Register / Vol. 73, No. 155 / Monday, August 11, 2008 / Notices
assistance, call toll-free 1–866–208–
3372.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. E8–18464 Filed 8–8–08; 8:45 am]
[Project No. 13149–000]
BILLING CODE 6717–01–P
FFP Ohio River 1, LLC; Notice of
Preliminary Permit Applications
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
rmajette on PRODPC74 with NOTICES
August 5, 2008.
On March 25, 2008, FFP Ohio River
1, LLC each filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Ohio River 10 and Ohio
River 1 Projects, to be located on the
Ohio River in Pulaski County, Illinois
and Ballard County, Kentucky.
The proposed Ohio River 1 Project
consists of: (1) 3,180 proposed 20
kilowatt Free Flow generating units
having a total installed capacity of 63.6
megawatts, (2) a proposed transmission
line, and (3) appurtenant facilities. The
FFP Ohio River 1, LLC, project would
have an average annual generation of
278.57 gigawatt-hours and be sold to a
local utility.
Applicant Contact: Mr. Dan Irvin, FFP
Ohio River 1, LLC, 69 Bridge Street,
Manchester, MA 01944, phone (978)
232–3536.
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13149) in the docket number
field to access the document. For
VerDate Aug<31>2005
15:22 Aug 08, 2008
Jkt 214001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13156–000; Project No. 13157–
000]
FFP Ohio River 10, LLC; FFP Ohio
River 11, LLC; Notice of Preliminary
Permit Applications Accepted for
Filing and Soliciting Comment,
Motions To Intervene, and Competing
Applications
August 5, 2008.
On March 25, 2008, FFP Ohio River
10, LLC and FFP Ohio River 11, LLC
each filed an application, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
Ohio River 10 and Ohio River 11
Projects, to be located on the Ohio River
in Floyd County, Indiana and Jefferson
County, Kentucky.
The proposed Ohio River 10 Project
consists of: (1) 1,920 proposed 20
kilowatt Free Flow generating units
having a total installed capacity of 38.4
megawatts, (2) a proposed transmission
line, and (3) appurtenant facilities. The
FFP Ohio River 10, LLC, project would
have an average annual generation of
168.19 gigawatt-hours and be sold to a
local utility.
The proposed Ohio River 11 Project
consists of: (1) 1,740 proposed 20
kilowatt Free Flow generating units
having a total installed capacity of 34.8
megawatts, (2) a proposed transmission
line, and (3) appurtenant facilities. The
FFP Ohio River 10, LLC, project would
have an average annual generation of
236.52 gigawatt-hours and be sold to a
local utility.
Applicant Contact: Mr. Dan Irvin, FFP
Ohio River 10, LLC and FFP Ohio River
11, LLC, 69 Bridge Street, Manchester,
MA 01944, phone (978) 232–3536.
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
46611
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13156 or P–13157) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–18469 Filed 8–8–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13158–000]
FFP Ohio River 12, LLC; Notice of
Preliminary Permit Applications
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
August 5, 2008.
On March 25, 2008, FFP Ohio River
12, LLC each filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Ohio River 12 and Ohio
River 8 Projects, to be located on the
Ohio River in Clark County, Indiana and
Jefferson County, Kentucky.
The proposed Ohio River 12 Project
consists of: (1) 2,700 proposed 20
kilowatt Free Flow generating units
having a total installed capacity of 54
megawatts, (2) a proposed transmission
line, and (3) appurtenant facilities. The
FFP Ohio River 12, LLC, project would
have an average annual generation of
236.52 gigawatt-hours and be sold to a
local utility.
Applicant Contact: Mr. Dan Irvin, FFP
Ohio River 12, LLC, 69 Bridge Street,
Manchester, MA 01944, phone (978)
232–3536.
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
E:\FR\FM\11AUN1.SGM
11AUN1
46612
Federal Register / Vol. 73, No. 155 / Monday, August 11, 2008 / Notices
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13158) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–18470 Filed 8–8–08; 8:45 am]
BILLING CODE 6717–01–P
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13150) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–18465 Filed 8–8–08; 8:45 am]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Project No. 13150–000]
have an average annual generation of
210.40 gigawatt-hours and be sold to a
local utility.
Applicant Contact: Mr. Dan Irvin, FFP
Ohio River 7, LLC, 69 Bridge Street,
Manchester, MA 01944, phone (978)
232–3536.
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13153) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–18466 Filed 8–8–08; 8:45 am]
DEPARTMENT OF ENERGY
August 5, 2008.
rmajette on PRODPC74 with NOTICES
FFP Ohio River 2, LLC; Notice of
Preliminary Permit Applications
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
FFP Ohio River 7, LLC; Notice of
Preliminary Permit Applications
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
DEPARTMENT OF ENERGY
August 5, 2008.
FFP Ohio River 8, LLC; Notice of
Preliminary Permit Applications
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
On March 25, 2008, FFP Ohio River
2, LLC each filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Ohio River 10 and Ohio
River 2 Projects, to be located on the
Ohio River in Massac County, Illinois
and McCracken County, Kentucky.
The proposed Ohio River 2 Project
consists of: (1) 2,460 proposed 20
kilowatt Free Flow generating units
having a total installed capacity of 49.2
megawatts, (2) a proposed transmission
line, and (3) appurtenant facilities. The
FFP Ohio River 2, LLC, project would
have an average annual generation of
215.50 gigawatt-hours and be sold to a
local utility.
Applicant Contact: Mr. Dan Irvin, FFP
Ohio River 2, LLC, 69 Bridge Street,
Manchester, MA 01944, phone (978)
232–3536.
VerDate Aug<31>2005
15:22 Aug 08, 2008
Jkt 214001
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Project No. 13153–000]
On March 25, 2008, FFP Ohio River
7, LLC each filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Ohio River 10 and Ohio
River 7 Projects, to be located on the
Ohio River in Perry and Spencer
Counties, Indiana and Hancock County,
Kentucky.
The proposed Ohio River 7 Project
consists of: (1) 2,400 proposed 20
kilowatt Free Flow generating units
having a total installed capacity of 48
megawatts, (2) a proposed transmission
line, and (3) appurtenant facilities. The
FFP Ohio River 7, LLC, project would
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Project No. 13154–000]
August 5, 2008.
On March 25, 2008, FFP Ohio River
8, LLC each filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Ohio River 10 and Ohio
River 8 Projects, to be located on the
Ohio River in Perry County, Indiana and
Hancock County, Kentucky.
The proposed Ohio River 8 Project
consists of: (1) 1,650 proposed 20
E:\FR\FM\11AUN1.SGM
11AUN1
Agencies
[Federal Register Volume 73, Number 155 (Monday, August 11, 2008)]
[Notices]
[Pages 46611-46612]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-18470]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13158-000]
FFP Ohio River 12, LLC; Notice of Preliminary Permit Applications
Accepted for Filing and Soliciting Comment, Motions To Intervene, and
Competing Applications
August 5, 2008.
On March 25, 2008, FFP Ohio River 12, LLC each filed an
application, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Ohio River 12 and Ohio River
8 Projects, to be located on the Ohio River in Clark County, Indiana
and Jefferson County, Kentucky.
The proposed Ohio River 12 Project consists of: (1) 2,700 proposed
20 kilowatt Free Flow generating units having a total installed
capacity of 54 megawatts, (2) a proposed transmission line, and (3)
appurtenant facilities. The FFP Ohio River 12, LLC, project would have
an average annual generation of 236.52 gigawatt-hours and be sold to a
local utility.
Applicant Contact: Mr. Dan Irvin, FFP Ohio River 12, LLC, 69 Bridge
Street, Manchester, MA 01944, phone (978) 232-3536.
FERC Contact: Robert Bell, (202) 502-6062.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60
[[Page 46612]]
days from the issuance of this notice. Comments, motions to intervene,
notices of intent, and competing applications may be filed
electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's Web site under the ``e-Filing'' link.
If unable to be filed electronically, documents may be paper-filed. To
paper-file, an original and eight copies should be mailed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For more information on how to
submit these types of filings please go to the Commission's Web site
located at https://www.ferc.gov/filing-comments.asp. More information
about this project can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13158) in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-18470 Filed 8-8-08; 8:45 am]
BILLING CODE 6717-01-P