Davis Hydro, LLC.; Notice of Application for Preliminary Permit Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 46610 [E8-18376]
Download as PDF
46610
Federal Register / Vol. 73, No. 155 / Monday, August 11, 2008 / Notices
Scoping Meetings
Commission staff will hold two
scoping meetings in the vicinity of the
project at the time and place noted
below. The daytime meeting will focus
on resource agency, Indian tribes, and
non-governmental organization
concerns, while the evening meeting is
primarily for receiving input from the
public. We invite all interested
individuals, organizations, and agencies
to attend one or both of the meetings,
and to assist staff in identifying
particular study needs, as well as the
scope of environmental issues to be
addressed in the environmental
document. The times and locations of
these meetings are as follows:
Daytime Scoping Meeting
Date: Thursday, September 11, 2008.
Time: 9 a.m. to 12 noon (CST).
Location: Central Alabama
Community College, Betty Carol Graham
Center at Alexander City Campus, 1675
Cherokee Road, Alexander City, AL
35010.
Phone: (205) 257–2211.
rmajette on PRODPC74 with NOTICES
Evening Scoping Meeting
Date: Thursday, September 11, 2008.
Time: 6 p.m. to 8 p.m. (CST).
Location: Central Alabama
Community College, Betty Carol Graham
Center at Alexander City Campus, 1675
Cherokee Road, Alexander City, AL
35010.
Phone: (205) 257–2211.
Scoping Document 1 (SD1), which
outlines the subject areas to be
addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list. Copies of
SD1 will be available at the scoping
meetings, or may be viewed on the Web
at https://www.ferc.gov, using the
‘‘eLibrary’’ link. Follow the directions
for accessing information in paragraph
n. Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a
revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
Site Visit
The potential applicant and
Commission staff will conduct a site
visit of the project on Wednesday,
September 10, 2008, starting at 9 a.m.
(CST). All participants should meet at
the parking lot for the Martin Dam
powerhouse, located at 675 Overlook
Drive, Dadeville, AL 36853. All
participants are responsible for their
own transportation to the powerhouse
site. Anyone with questions about the
site visit should contact Viki Pate,
VerDate Aug<31>2005
15:22 Aug 08, 2008
Jkt 214001
Alabama Power Company at (205) 257–
2211 on or before September 3, 2008.
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this document.
Meeting Procedures
The meetings will be recorded by a
stenographer and will become part of
the formal record of the Commission
proceeding on the project.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–18471 Filed 8–8–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
P–13174–000]
Davis Hydro, LLC.; Notice of
Application for Preliminary Permit
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Protests
August 4, 2008.
On April 16, 2008, Davis Hydro LLC.
filed an application, pursuant to section
4(f) of the Federal Power Act (FPA), to
study the feasibility of Boca Power
Project. The proposed project would be
located on the Little Truckee River in
Nevada County, California. The existing
facilities are owned and operated by the
Bureau of Reclamation.
The proposed project using the
existing Bureau of Reclamation Boca
Power Project would consist of: (1) A
proposed approximately eight-foot-long
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
50-inch diameter penstock, (2) a
proposed powerhouse, containing one
generating unit with an installed
capacity of 1.125 megawatts, (3) a
proposed 2,000-foot-long, 12 kilovolt
transmission line, and (4) appurtenant
facilities. The proposed project would
have an average annual generation of 5
gigawatt-hours and be sold to a local
utility.
Applicant Contact: Richard D. Ely,
Principal, Davis Hydro LLC., 27264
Meadowbrook Drive, Davis, California
95618, (530) 753–8864,
Dick@davishydro.com.
FERC Contact: Jake Tung, (202) 502–
8757.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13177) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–18376 Filed 8–8–08; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\11AUN1.SGM
11AUN1
Agencies
[Federal Register Volume 73, Number 155 (Monday, August 11, 2008)]
[Notices]
[Page 46610]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-18376]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
P-13174-000]
Davis Hydro, LLC.; Notice of Application for Preliminary Permit
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Protests
August 4, 2008.
On April 16, 2008, Davis Hydro LLC. filed an application, pursuant
to section 4(f) of the Federal Power Act (FPA), to study the
feasibility of Boca Power Project. The proposed project would be
located on the Little Truckee River in Nevada County, California. The
existing facilities are owned and operated by the Bureau of
Reclamation.
The proposed project using the existing Bureau of Reclamation Boca
Power Project would consist of: (1) A proposed approximately eight-
foot-long 50-inch diameter penstock, (2) a proposed powerhouse,
containing one generating unit with an installed capacity of 1.125
megawatts, (3) a proposed 2,000-foot-long, 12 kilovolt transmission
line, and (4) appurtenant facilities. The proposed project would have
an average annual generation of 5 gigawatt-hours and be sold to a local
utility.
Applicant Contact: Richard D. Ely, Principal, Davis Hydro LLC.,
27264 Meadowbrook Drive, Davis, California 95618, (530) 753-8864,
Dick@davishydro.com.
FERC Contact: Jake Tung, (202) 502-8757.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of the Commission's Web site at http:/
/www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13177) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-18376 Filed 8-8-08; 8:45 am]