Environmental Impacts Statements; Notice of Availability, 46269 [E8-18318]

Download as PDF Federal Register / Vol. 73, No. 154 / Friday, August 8, 2008 / Notices Summary: EPA expressed environmental concerns about impacts to water quality, public drinking water supplies, and streams. Rating EC2. Final EISs EIS No. 20080213, ERP No. F–COE– E67005–NC, PCS Phosphate Mine Continuation, New Information on Additional Alternative ‘‘L’’ and ‘‘M’’, Proposes to Expand its Existing Open Pit Phosphate Mining Operation into a 3,412 Acre Tract, Pamlico River and South Creek, near Aurora, Beaufort County, NC. Summary: EPA continues to have environmental objections to the applicant’s proposed action (‘‘Alternative L’’) due to significant impacts to waters of the U.S. EPA believes that ‘‘Alternative S33AP’’ is both environmentally preferable and economically practicable; EPA also proposed modifications to Alternative L that would reduce the potential environmental impacts. EIS No. 20080269, ERP No. FS–FHW– G40129–AR, U.S. 67 Construction, U.S. 67/167 to I–40 West/I–430 Interchange around the North Little Rock Metropolitan Area, Funding, Pulaski County, AR. Summary: EPA does not object to the proposed project. Dated: August 5, 2008. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E8–18314 Filed 8–7–08; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8584–4] pwalker on PROD1PC71 with NOTICES Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 07/28/2008 through 08/01/2008 Pursuant to 40 CFR 1506.9. EIS No. 20080295, Final EIS, FHW, NY, NYS Route 17 at Exit 122 Interchange Project, To Improve the Safety and Operation, Right-of-Way Acquisition, Town of Wallkill, Orange County, NY, Wait Period Ends: 09/08/2008, Contact: Jeffery W. Kolb 518–431– 4127. EIS No. 20080296, Final EIS, FHW, TX, Grand Parkway (State Highway 99) Selected the Preferred Alternative VerDate Aug<31>2005 17:25 Aug 07, 2008 Jkt 214001 Alignment, Segment F–2 from SH 249 to IH 45, Right-of-Way Permit and U.S. Army COE Section 404 Permit, Harris County, TX, Wait Period Ends: 09/17/2008, Contact: Justin Ham 512– 536–5963. EIS No. 20080297, Draft EIS, IBR, CA, Lake Casitas Resource Management Plan (RMP), Implementation, Cities of Los Angeles and Ventura, Western Ventura County, CA, Comment Period Ends: 09/22/2008, Contact: Sharon McHale 916–989–7172. EIS No. 20080298, Final EIS, BLM, ID, Cottonwood Resource Management Plan, Implementation, Latah, Clearwater, Nez Perce, Lewis, Idaho and Adams Counties, ID, Wait Period Ends: 09/08/2008, Contact: Dean Huibregtse 208–962–3784. EIS No. 20080299, Final EIS, IBR, CA, American Basin Fish Screen and Habitat Improvement Project, Construction and Operation of one or two Positive-Barrier Fish Screen Diversion Facilities, Funding and U.S. Army COE Section 10 and 404 Permits, Natomas Mutual, Sacramento and Sutter Counties, CA, Wait Period Ends: 09/08/2008, Contact: Bradley Hubbard 916–978–5204. EIS No. 20080300, Final EIS, BLM, AZ, Agua Fria National Monument and Bradshaw-Harquahala, Proposed Resource Management Plan, Implementation, Yavapai County, AZ, Wait Period Ends: 09/08/2008, Contact: Connie Stone 623–580–5500. EIS No. 20080301, Final EIS, BLM, UT, Richfield Field Office Resource Management Plan, Implementation, Future Management of the Public Lands and Resource, Glen Canyon National Recreation Area, Capitol Reef and Canyonlands National Parks, Sanpete, Sevier, Piute, Wayne and Garfield Counties, UT , Wait Period Ends: 09/08/2008, Contact: John Russell 435–896–1500. EIS No. 20080302, Third Draft Supplement, UAF, FL, Eglin Air Force Base (AFB) and Hurlburt Field, Proposes To Implement the Military Housing Privatization Initiative (MHPI), FL, Comment Period Ends: 09/22/2008, Contact: Shari Kilbourne 973–656–2926. EIS No. 20080303, Draft Supplement, USN, 00, Developing Home Port Facilities for Three NIMITZ-Class Aircraft Carriers in Support of the U.S. Pacific Fleet, New Circumstances and Information to Supplements (the 1999 FEIS) Coronado, CA, Comment Period Ends: 09/22/2008, Contact: Robert Montana 619–556–8509. EIS No. 20080304, Draft EIS, NOA, 00, Reef Fish Amendment 30B: Gag-End Overfishing and Set Management PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 46269 Thresholds and Targets; Red Grouper—Set Optimum Yield, Total Allowable Catch (TAC), and Management Measures: Area Closures: and Federal Regulatory Compliance, Implementation, Gulf of Mexico, Comment Period Ends: 09/ 22/2008, Contact: Roy E. Crabtree 727–824–5701. EIS No. 20080305, Final EIS, CGD, AL, Bienville Offshore Energy Terminal (BOET) Deepwater Port License Application (Docket # USCG–2006– 24644), Proposes To Construct and Operate a Liquefied Natural Gas Receiving and Regasification Facility, Outer Continental Shelf of the Gulf of Mexico, South of Fort Morgan, AL, Wait Period Ends: 09/08/2008, Contact: Lt. Hannah Kim 202–372– 1438. Amended Notices EIS No. 20080281, Draft EIS, NRC, 00, GENERIC—In-Situ Leach Uranium Milling Facilities (NUREG–1910), Construction, Operation, Aquifer Restoration and Decommissioning, Potentially Location in Portions of WY, NE, SD and NM, Comment Period Ends: 10/07/2008, Contact: James Park 301–415–6935. Revision to FR Notice Published: Extending Comment Period from 09/26/2008 to 10/07/2008. Dated: August 5, 2008. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E8–18318 Filed 8–7–08; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–8702–3] Farm, Ranch, and Rural Communities Committee Environmental Protection Agency (EPA). ACTION: Notice of meeting. AGENCY: SUMMARY: Under the Federal Advisory Committee Act, Pub. L. 92–463, EPA gives notice of a meeting of the Farm, Ranch, and Rural Communities Committee (FRRCC). The purpose of the FRRCC is to provide advice to the Administrator of EPA on environmental issues and programs that impact, or are of concern to, farms, ranches, and rural communities. The FRRCC is a part of EPA’s efforts to expand cooperative working relationships with the agriculture industry and others who are interested in agricultural issues and to E:\FR\FM\08AUN1.SGM 08AUN1

Agencies

[Federal Register Volume 73, Number 154 (Friday, August 8, 2008)]
[Notices]
[Page 46269]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-18318]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8584-4]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements

Filed 07/28/2008 through 08/01/2008

Pursuant to 40 CFR 1506.9.

EIS No. 20080295, Final EIS, FHW, NY, NYS Route 17 at Exit 122 
Interchange Project, To Improve the Safety and Operation, Right-of-Way 
Acquisition, Town of Wallkill, Orange County, NY, Wait Period Ends: 09/
08/2008, Contact: Jeffery W. Kolb 518-431-4127.
EIS No. 20080296, Final EIS, FHW, TX, Grand Parkway (State Highway 99) 
Selected the Preferred Alternative Alignment, Segment F-2 from SH 249 
to IH 45, Right-of-Way Permit and U.S. Army COE Section 404 Permit, 
Harris County, TX, Wait Period Ends: 09/17/2008, Contact: Justin Ham 
512-536-5963.
EIS No. 20080297, Draft EIS, IBR, CA, Lake Casitas Resource Management 
Plan (RMP), Implementation, Cities of Los Angeles and Ventura, Western 
Ventura County, CA, Comment Period Ends: 09/22/2008, Contact: Sharon 
McHale 916-989-7172.
EIS No. 20080298, Final EIS, BLM, ID, Cottonwood Resource Management 
Plan, Implementation, Latah, Clearwater, Nez Perce, Lewis, Idaho and 
Adams Counties, ID, Wait Period Ends: 09/08/2008, Contact: Dean 
Huibregtse 208-962-3784.
EIS No. 20080299, Final EIS, IBR, CA, American Basin Fish Screen and 
Habitat Improvement Project, Construction and Operation of one or two 
Positive-Barrier Fish Screen Diversion Facilities, Funding and U.S. 
Army COE Section 10 and 404 Permits, Natomas Mutual, Sacramento and 
Sutter Counties, CA, Wait Period Ends: 09/08/2008, Contact: Bradley 
Hubbard 916-978-5204.
EIS No. 20080300, Final EIS, BLM, AZ, Agua Fria National Monument and 
Bradshaw-Harquahala, Proposed Resource Management Plan, Implementation, 
Yavapai County, AZ, Wait Period Ends: 09/08/2008, Contact: Connie Stone 
623-580-5500.
EIS No. 20080301, Final EIS, BLM, UT, Richfield Field Office Resource 
Management Plan, Implementation, Future Management of the Public Lands 
and Resource, Glen Canyon National Recreation Area, Capitol Reef and 
Canyonlands National Parks, Sanpete, Sevier, Piute, Wayne and Garfield 
Counties, UT , Wait Period Ends: 09/08/2008, Contact: John Russell 435-
896-1500.
EIS No. 20080302, Third Draft Supplement, UAF, FL, Eglin Air Force Base 
(AFB) and Hurlburt Field, Proposes To Implement the Military Housing 
Privatization Initiative (MHPI), FL, Comment Period Ends: 09/22/2008, 
Contact: Shari Kilbourne 973-656-2926.
EIS No. 20080303, Draft Supplement, USN, 00, Developing Home Port 
Facilities for Three NIMITZ-Class Aircraft Carriers in Support of the 
U.S. Pacific Fleet, New Circumstances and Information to Supplements 
(the 1999 FEIS) Coronado, CA, Comment Period Ends: 09/22/2008, Contact: 
Robert Montana 619-556-8509.
EIS No. 20080304, Draft EIS, NOA, 00, Reef Fish Amendment 30B: Gag-End 
Overfishing and Set Management Thresholds and Targets; Red Grouper--Set 
Optimum Yield, Total Allowable Catch (TAC), and Management Measures: 
Area Closures: and Federal Regulatory Compliance, Implementation, Gulf 
of Mexico, Comment Period Ends: 09/22/2008, Contact: Roy E. Crabtree 
727-824-5701.
EIS No. 20080305, Final EIS, CGD, AL, Bienville Offshore Energy 
Terminal (BOET) Deepwater Port License Application (Docket  
USCG-2006-24644), Proposes To Construct and Operate a Liquefied Natural 
Gas Receiving and Regasification Facility, Outer Continental Shelf of 
the Gulf of Mexico, South of Fort Morgan, AL, Wait Period Ends: 09/08/
2008, Contact: Lt. Hannah Kim 202-372-1438.

Amended Notices

EIS No. 20080281, Draft EIS, NRC, 00, GENERIC--In-Situ Leach Uranium 
Milling Facilities (NUREG-1910), Construction, Operation, Aquifer 
Restoration and Decommissioning, Potentially Location in Portions of 
WY, NE, SD and NM, Comment Period Ends: 10/07/2008, Contact: James Park 
301-415-6935. Revision to FR Notice Published: Extending Comment Period 
from 09/26/2008 to 10/07/2008.

    Dated: August 5, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E8-18318 Filed 8-7-08; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.