In the Matter of Entergy Nuclear Operations, Inc.; Entergy Nuclear Palisades, LLC (Palisades Nuclear Plant); Order Approving Indirect Transfer of Facility Operating License, 45252-45253 [E8-17778]

Download as PDF 45252 Federal Register / Vol. 73, No. 150 / Monday, August 4, 2008 / Notices Members of the public desiring to provide oral statements and/or written comments should notify the Designated Federal Officer, Mr. Sam Duraiswamy (telephone: 301–415–7364) between 7:30 a.m. and 4 p.m. (ET) five days prior to the meeting, if possible, so that appropriate arrangements can be made. Electronic recordings will be permitted only during those portions of the meeting that are open to the public. Detailed procedures for the conduct of and participation in ACRS meetings were published in the Federal Register on September 26, 2007 (72 FR 54695). Further information regarding this meeting can be obtained by contacting the Designated Federal Officer between 7:30 a.m. and 4 p.m. (ET). Persons planning to attend this meeting are urged to contact the above named individual at least two working days prior to the meeting to be advised of any potential changes in the agenda. Dated: July 28, 2008. Cayetano Santos, Branch Chief, ACRS. [FR Doc. E8–17794 Filed 8–1–08; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket Nos. 50–255 and 72–7] In the Matter of Entergy Nuclear Operations, Inc.; Entergy Nuclear Palisades, LLC (Palisades Nuclear Plant); Order Approving Indirect Transfer of Facility Operating License I Entergy Nuclear Operations, Inc. (ENO) and Entergy Nuclear Palisades, LLC (EN-Palisades) are co-holders of the Renewed Facility Operating License, No. DPR–20, which authorizes the possession, use, and operation of the Palisades Nuclear Plant (Palisades). Palisades is a pressurized water nuclear reactor that is owned by EN-Palisades and operated by ENO. The facility is located in Van Buren County, Michigan. pwalker on PROD1PC71 with NOTICES II By application dated July 30, 2007, as supplemented by letters dated October 31, and December 5, 2007, and January 24, March 17, April 22, and May 2, 2008, ENO, acting on behalf of itself and EN-Palisades, requested that the U.S. Nuclear Regulatory Commission (NRC, the Commission), pursuant to Section 50.80 of Title 10 of the Code of Federal Regulations (10 CFR), consent to the proposed indirect transfer of control of the Palisades license, including the VerDate Aug<31>2005 16:50 Aug 01, 2008 Jkt 214001 general license for the independent spent fuel storage installation. EN-Palisades is currently a direct wholly-owned subsidiary of Entergy Nuclear Midwest Investment Company, LLC which, in turn, is a direct whollyowned subsidiary of Entergy Nuclear Holding Company which, in turn, is a direct wholly-owned subsidiary of Entergy Corporation. Therefore, under the current corporate structure, Entergy Corporation is the indirect owner of 100 percent of EN-Palisades. Under the proposed corporate restructuring, a new holding company, Enexus Energy Corporation (Enexus), will be created. Initially, the shareholders of Entergy Corporation will separately own the shares of Enexus and, as such, Enexus will be owned by the public. Entergy Nuclear Holding Company will become a direct wholly-owned subsidiary of Enexus. Accordingly, following the corporate restructuring, Enexus will acquire indirect control of 100 percent of ENPalisades. ENO, the operator of the Palisades facility, is currently a direct whollyowned subsidiary of Entergy Nuclear Holding Company #2 which, in turn, is a direct wholly-owned subsidiary of Entergy Corporation. Therefore, Entergy Corporation is currently the indirect owner of 100 percent of ENO. Under the proposed corporate restructuring, Entergy Nuclear Holding Company #2 will be eliminated and ENO will become a direct subsidiary of a new parent company called EquaGen LLC. EquaGen LLC will be owned in equal shares by two new intermediate holding companies as follows. Entergy EquaGen, Inc. is being created as a direct subsidiary of Entergy Corporation and will own 50 percent of EquaGen LLC. Similarly, Enexus EquaGen, LLC is being created as a direct subsidiary of Enexus and will also own 50 percent of EquaGen LLC. Accordingly, following the corporate restructuring, Entergy Corporation and Enexus will each have indirect control of 50 percent of ENO. Finally, ENO will be converted from a corporation to a limited liability company and its name will be changed from Entergy Nuclear Operations, Inc. to EquaGen Nuclear LLC. Under Delaware law, EquaGen Nuclear LLC will assume all of the rights and responsibilities of ENO, and it will be the same company (legal entity) both before and after the conversion and name change. Also, ENPalisades will undergo a name change to become Enexus Nuclear Palisades, LLC. The staff understands that ENO will request an administrative license amendment to conform the Palisades license in the near future. PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 Notice of the request for approval and an opportunity for a hearing was published in the Federal Register on January 16, 2008 (73 FR 2948). By petition dated February 5, 2008, Locals 369 and 590, Utility Workers Union of America (UWUA), American Federation of Labor-Congress of Industrial Organization, representing plant workers at the Pilgrim Nuclear Power Station located in Plymouth, Massachusetts, responded to the Federal Register notice and requested a hearing and leave to intervene as a party in the Palisades proceeding. On June 12, 2008, Local 369 filed a notice of withdrawal of its petition to intervene. The notice of withdrawal did not apply to Local 590. The request for a hearing is currently pending before the Commission. Pursuant to 10 CFR 2.1316, during the pendency of a hearing, the staff is expected to promptly proceed with the approval or denial of license transfer requests consistent with the staff’s findings in its safety evaluation. Notice of the staff’s action shall be promptly transmitted to the presiding officer and parties to the proceeding. Commission action on the pending hearing requests is being handled independently of this action. Pursuant to 10 CFR 50.80(a), no license, or any right thereunder, shall be transferred, directly or indirectly, through transfer of control of the license, unless the Commission shall give its consent in writing. Upon review of the information in the application as supplemented and other information before the Commission, and relying upon the representations and agreements in the application as supplemented, the NRC staff concludes that the proposed indirect transfer of control of the license held by ENPalisades to Enexus, as described herein, will not affect the qualifications of EN-Palisades as holder of the Palisades license. The indirect transfer of control of the license is otherwise consistent with applicable provisions of law, regulations, and orders issued by the NRC. Furthermore, the NRC staff concludes that the proposed corporate restructuring involving new intermediate and ultimate parent companies over ENO, as described herein, will not affect the qualifications of ENO as holder of the Palisades license. The indirect transfer of control of the license as held by ENO, to the extent affected by the proposed restructuring, is otherwise consistent with applicable provisions of law, regulations, and orders issued by the Commission. E:\FR\FM\04AUN1.SGM 04AUN1 Federal Register / Vol. 73, No. 150 / Monday, August 4, 2008 / Notices pwalker on PROD1PC71 with NOTICES The NRC staff concludes that the conversion of Entergy Nuclear Operations, Inc. to EquaGen Nuclear LLC would not constitute a direct transfer of the licenses to the extent held by ENO. Therefore, no consent to the proposed conversion is necessary. The findings set forth above are supported by the NRC’s safety evaluation dated July 28, 2008. III. Accordingly, pursuant to Sections 161b, 161i, 161o, and 184 of the Atomic Energy Act of 1954, as amended, 42 U.S.C. 2201(b), 2201(i), 2201(o), and 2234; and 10 CFR 50.80, it is hereby ordered that the application regarding the indirect license transfer discussed above related to the proposed corporate restructuring and establishment of Enexus is approved, subject to the following conditions: 1. EN-Palisades shall enter into the $700 million Support Agreement with Enexus Energy Corporation as described in the application, no later than the time the proposed transactions and indirect license transfer occurs. EN-Palisades shall take no action to cause Enexus Energy Corporation, or its successors and assigns, to void, cancel, or modify the Support Agreement or cause it to fail to perform, or impair its performance under the Support Agreement, without prior written consent of the NRC. The Support Agreement may not be amended or modified without 30 days prior written notice to the Director of the Office of Nuclear Reactor Regulation or his designee. An executed copy of the Support Agreement shall be submitted to the NRC no later than 30 days after the completion of the proposed transactions and the indirect license transfer. EN-Palisades shall inform the NRC in writing anytime it draws upon the Support Agreement. 2. The ten separate support guarantees from various Entergy subsidiaries, which total $315 million, including the support guarantee relating to Palisades, may be revoked when, and conditioned upon, implementation of the new $700 million Support Agreement at the time the proposed restructuring and indirect license transfer are completed. 3. Should the proposed corporate restructuring and establishment of Enexus not be completed within one year from the date of this Order, this Order shall become null and void, provided, however, upon written application and good cause shown, such date may be extended by Order. This Order is effective upon issuance. For further details with respect to this Order, see the application dated July 30, 2007, as supplemented by letters dated VerDate Aug<31>2005 16:50 Aug 01, 2008 Jkt 214001 October 31, and December 5, 2007, and January 24, March 17, April 22, and May 2, 2008, and the NRC’s safety evaluation dated July 28, 2008, which are available for public inspection at the Commission’s Public Document Room (PDR), located at One White Flint North, Public File Area 01 F21, 11555 Rockville Pike (first floor), Rockville, Maryland and accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, https://www.nrc.gov/reading-rm/ adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1–800– 397–4209, 301–415–4737, or by e-mail to pdr@nrc.gov. Dated at Rockville, Maryland this 28th day of July 2008. For the Nuclear Regulatory Commission. Timothy J. McGinty, Acting Director, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. E8–17778 Filed 8–1–08; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket Nos. 50–247 and 72–51; Docket No. 50–286] In the Matter of Entergy Nuclear Operations, Inc.; Entergy Nuclear Indian Point 2, LLC (Indian Point Nuclear Generating Unit No. 2); Entergy Nuclear Indian Point 3, LLC (Indian Point Nuclear Generating Unit No. 3); Order Approving Indirect Transfer of Facility Operating Licenses I Entergy Nuclear Operations, Inc. (ENO) and Entergy Nuclear Indian Point 2, LLC (ENIP2) are co-holders of the Facility Operating License, No. DPR–26, which authorizes the possession, use, and operation of the Indian Point Nuclear Generating Unit No. 2 (IP2). ENO and Entergy Nuclear Indian Point 3, LLC (ENIP3) are co-holders of the Facility Operating License, No. DPR–64, which authorizes the possession, use, and operation of the Indian Point Nuclear Generating Unit No. 3 (IP3). IP2 and IP3 are both pressurized water nuclear reactors that are owned by ENIP2 and ENIP3, respectively, and operated by ENO. The facilities are located in Westchester County, New York. PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 45253 II By application dated July 30, 2007, as supplemented by letters dated October 31, and December 5, 2007, and January 24, March 17, April 22, and May 2, 2008, ENO, acting on behalf of itself, ENIP2, and ENIP3, requested that the U.S. Nuclear Regulatory Commission (NRC, the Commission), pursuant to Section 50.80 of Title 10 of the Code of Federal Regulations (10 CFR), consent to the proposed indirect transfer of control of the IP2 and IP3 licenses, including the general license for the independent spent fuel storage installation. ENIP2 is currently a direct wholly owned subsidiary of Entergy Nuclear Holding Company #3, LLC. Entergy Nuclear Holding Company #3, LLC is a direct wholly owned subsidiary of Entergy Nuclear Holding Company which, in turn, is a direct wholly owned subsidiary of Entergy Corporation. Therefore, under the current corporate structure, Entergy Corporation is the indirect owner of 100 percent of ENIP2. Under the proposed corporate restructuring, a new holding company, Enexus Energy Corporation (Enexus), will be created. Initially, the public shareholders of Entergy Corporation will separately own the shares of Enexus and, as such, Enexus will be owned by the public. Entergy Nuclear Holding Company, an indirect parent company of ENIP2, will become a direct wholly owned subsidiary of Enexus. Accordingly, following the corporate restructuring, Enexus will acquire indirect control of 100 percent of ENIP2. ENIP3 is currently a direct wholly owned subsidiary of Entergy Nuclear New York Investment Company 1 which, in turn, is a direct wholly owned subsidiary of Entergy Nuclear Holding Company #1. Seventy-five percent of Entergy Nuclear Holding Company #1 is directly owned by Entergy Corporation while the remaining 25 percent is directly owned by Entergy Global, LLC. Entergy Global, LLC is a direct wholly owned subsidiary of Entergy International Holdings LTD which, in turn, is a direct wholly owned subsidiary of Entergy Corporation. Therefore, under the current corporate structure, Entergy Corporation is the indirect owner of 100 percent of ENIP3. Under the proposed restructuring, Entergy Nuclear Holding Company #1 will become a direct wholly owned subsidiary of Enexus. Entergy Global, LLC, Entergy International Holdings LTD, and Entergy Nuclear New York Investment Company 1 will be eliminated. Accordingly, following the corporate restructuring, Enexus will E:\FR\FM\04AUN1.SGM 04AUN1

Agencies

[Federal Register Volume 73, Number 150 (Monday, August 4, 2008)]
[Notices]
[Pages 45252-45253]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-17778]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-255 and 72-7]


In the Matter of Entergy Nuclear Operations, Inc.; Entergy 
Nuclear Palisades, LLC (Palisades Nuclear Plant); Order Approving 
Indirect Transfer of Facility Operating License

I

    Entergy Nuclear Operations, Inc. (ENO) and Entergy Nuclear 
Palisades, LLC (EN-Palisades) are co-holders of the Renewed Facility 
Operating License, No. DPR-20, which authorizes the possession, use, 
and operation of the Palisades Nuclear Plant (Palisades). Palisades is 
a pressurized water nuclear reactor that is owned by EN-Palisades and 
operated by ENO. The facility is located in Van Buren County, Michigan.

II

    By application dated July 30, 2007, as supplemented by letters 
dated October 31, and December 5, 2007, and January 24, March 17, April 
22, and May 2, 2008, ENO, acting on behalf of itself and EN-Palisades, 
requested that the U.S. Nuclear Regulatory Commission (NRC, the 
Commission), pursuant to Section 50.80 of Title 10 of the Code of 
Federal Regulations (10 CFR), consent to the proposed indirect transfer 
of control of the Palisades license, including the general license for 
the independent spent fuel storage installation.
    EN-Palisades is currently a direct wholly-owned subsidiary of 
Entergy Nuclear Midwest Investment Company, LLC which, in turn, is a 
direct wholly-owned subsidiary of Entergy Nuclear Holding Company 
which, in turn, is a direct wholly-owned subsidiary of Entergy 
Corporation. Therefore, under the current corporate structure, Entergy 
Corporation is the indirect owner of 100 percent of EN-Palisades.
    Under the proposed corporate restructuring, a new holding company, 
Enexus Energy Corporation (Enexus), will be created. Initially, the 
shareholders of Entergy Corporation will separately own the shares of 
Enexus and, as such, Enexus will be owned by the public. Entergy 
Nuclear Holding Company will become a direct wholly-owned subsidiary of 
Enexus. Accordingly, following the corporate restructuring, Enexus will 
acquire indirect control of 100 percent of EN-Palisades.
    ENO, the operator of the Palisades facility, is currently a direct 
wholly-owned subsidiary of Entergy Nuclear Holding Company 2 
which, in turn, is a direct wholly-owned subsidiary of Entergy 
Corporation. Therefore, Entergy Corporation is currently the indirect 
owner of 100 percent of ENO.
    Under the proposed corporate restructuring, Entergy Nuclear Holding 
Company 2 will be eliminated and ENO will become a direct 
subsidiary of a new parent company called EquaGen LLC. EquaGen LLC will 
be owned in equal shares by two new intermediate holding companies as 
follows. Entergy EquaGen, Inc. is being created as a direct subsidiary 
of Entergy Corporation and will own 50 percent of EquaGen LLC. 
Similarly, Enexus EquaGen, LLC is being created as a direct subsidiary 
of Enexus and will also own 50 percent of EquaGen LLC. Accordingly, 
following the corporate restructuring, Entergy Corporation and Enexus 
will each have indirect control of 50 percent of ENO.
    Finally, ENO will be converted from a corporation to a limited 
liability company and its name will be changed from Entergy Nuclear 
Operations, Inc. to EquaGen Nuclear LLC. Under Delaware law, EquaGen 
Nuclear LLC will assume all of the rights and responsibilities of ENO, 
and it will be the same company (legal entity) both before and after 
the conversion and name change. Also, EN-Palisades will undergo a name 
change to become Enexus Nuclear Palisades, LLC. The staff understands 
that ENO will request an administrative license amendment to conform 
the Palisades license in the near future.
    Notice of the request for approval and an opportunity for a hearing 
was published in the Federal Register on January 16, 2008 (73 FR 2948). 
By petition dated February 5, 2008, Locals 369 and 590, Utility Workers 
Union of America (UWUA), American Federation of Labor-Congress of 
Industrial Organization, representing plant workers at the Pilgrim 
Nuclear Power Station located in Plymouth, Massachusetts, responded to 
the Federal Register notice and requested a hearing and leave to 
intervene as a party in the Palisades proceeding. On June 12, 2008, 
Local 369 filed a notice of withdrawal of its petition to intervene. 
The notice of withdrawal did not apply to Local 590.
    The request for a hearing is currently pending before the 
Commission. Pursuant to 10 CFR 2.1316, during the pendency of a 
hearing, the staff is expected to promptly proceed with the approval or 
denial of license transfer requests consistent with the staff's 
findings in its safety evaluation. Notice of the staff's action shall 
be promptly transmitted to the presiding officer and parties to the 
proceeding. Commission action on the pending hearing requests is being 
handled independently of this action.
    Pursuant to 10 CFR 50.80(a), no license, or any right thereunder, 
shall be transferred, directly or indirectly, through transfer of 
control of the license, unless the Commission shall give its consent in 
writing. Upon review of the information in the application as 
supplemented and other information before the Commission, and relying 
upon the representations and agreements in the application as 
supplemented, the NRC staff concludes that the proposed indirect 
transfer of control of the license held by EN-Palisades to Enexus, as 
described herein, will not affect the qualifications of EN-Palisades as 
holder of the Palisades license. The indirect transfer of control of 
the license is otherwise consistent with applicable provisions of law, 
regulations, and orders issued by the NRC. Furthermore, the NRC staff 
concludes that the proposed corporate restructuring involving new 
intermediate and ultimate parent companies over ENO, as described 
herein, will not affect the qualifications of ENO as holder of the 
Palisades license. The indirect transfer of control of the license as 
held by ENO, to the extent affected by the proposed restructuring, is 
otherwise consistent with applicable provisions of law, regulations, 
and orders issued by the Commission.

[[Page 45253]]

    The NRC staff concludes that the conversion of Entergy Nuclear 
Operations, Inc. to EquaGen Nuclear LLC would not constitute a direct 
transfer of the licenses to the extent held by ENO. Therefore, no 
consent to the proposed conversion is necessary.
    The findings set forth above are supported by the NRC's safety 
evaluation dated July 28, 2008.

III.

    Accordingly, pursuant to Sections 161b, 161i, 161o, and 184 of the 
Atomic Energy Act of 1954, as amended, 42 U.S.C. 2201(b), 2201(i), 
2201(o), and 2234; and 10 CFR 50.80, it is hereby ordered that the 
application regarding the indirect license transfer discussed above 
related to the proposed corporate restructuring and establishment of 
Enexus is approved, subject to the following conditions:
    1. EN-Palisades shall enter into the $700 million Support Agreement 
with Enexus Energy Corporation as described in the application, no 
later than the time the proposed transactions and indirect license 
transfer occurs. EN-Palisades shall take no action to cause Enexus 
Energy Corporation, or its successors and assigns, to void, cancel, or 
modify the Support Agreement or cause it to fail to perform, or impair 
its performance under the Support Agreement, without prior written 
consent of the NRC. The Support Agreement may not be amended or 
modified without 30 days prior written notice to the Director of the 
Office of Nuclear Reactor Regulation or his designee. An executed copy 
of the Support Agreement shall be submitted to the NRC no later than 30 
days after the completion of the proposed transactions and the indirect 
license transfer. EN-Palisades shall inform the NRC in writing anytime 
it draws upon the Support Agreement.
    2. The ten separate support guarantees from various Entergy 
subsidiaries, which total $315 million, including the support guarantee 
relating to Palisades, may be revoked when, and conditioned upon, 
implementation of the new $700 million Support Agreement at the time 
the proposed restructuring and indirect license transfer are completed.
    3. Should the proposed corporate restructuring and establishment of 
Enexus not be completed within one year from the date of this Order, 
this Order shall become null and void, provided, however, upon written 
application and good cause shown, such date may be extended by Order.
    This Order is effective upon issuance.
    For further details with respect to this Order, see the application 
dated July 30, 2007, as supplemented by letters dated October 31, and 
December 5, 2007, and January 24, March 17, April 22, and May 2, 2008, 
and the NRC's safety evaluation dated July 28, 2008, which are 
available for public inspection at the Commission's Public Document 
Room (PDR), located at One White Flint North, Public File Area 01 F21, 
11555 Rockville Pike (first floor), Rockville, Maryland and accessible 
electronically from the Agencywide Documents Access and Management 
System (ADAMS) Public Electronic Reading Room on the Internet at the 
NRC Web site, https://www.nrc.gov/reading-rm/adams.html.
    Persons who do not have access to ADAMS or who encounter problems 
in accessing the documents located in ADAMS, should contact the NRC PDR 
Reference staff by telephone at 1-800-397-4209, 301-415-4737, or by e-
mail to pdr@nrc.gov.

    Dated at Rockville, Maryland this 28th day of July 2008.

    For the Nuclear Regulatory Commission.
Timothy J. McGinty,
Acting Director, Division of Operating Reactor Licensing, Office of 
Nuclear Reactor Regulation.
[FR Doc. E8-17778 Filed 8-1-08; 8:45 am]