Montana: Filing of Plat of Survey, 45052 [E8-17613]
Download as PDF
45052
Federal Register / Vol. 73, No. 149 / Friday, August 1, 2008 / Notices
26. Permits required for groups larger than 25 vehicles or if monitoring indicates long-term damage.
27. VRM Class I.
28. Permitted activities would be confined to main roads within crucial bighorn lambing habitat from April 1 through June 15. This restriction
would not apply to filming if the filming meets the minimum impact criteria.
Comments on the Moab Field Office
DRMP/DEIS received from the public
and internal BLM review were
considered and incorporated as
appropriate into the PRMP/FEIS. Public
comments resulted in the addition of
clarifying text, but did not significantly
change proposed land use plan
decisions.
Instructions for filing a protest with
the Director of the BLM regarding the
PRMP/FEIS may be found in the Dear
Reader Letter of the PRMP/FEIS and at
43 CFR 1610.5–2. E-mail and faxed
protests will not be accepted as valid
protests unless the protesting party also
provides the original letter by either
regular or overnight mail postmarked by
the close of the protest period. Under
these conditions, the BLM will consider
the e-mail or faxed protest as an
advance copy and it will receive full
consideration. If you wish to provide
the BLM with such advance
notification, please direct faxed protests
to the attention of the BLM protest
coordinator at 202–452–5112, and emails to Brenda_HudgensWilliams@blm.gov. All protests,
including the follow-up letter (if emailing or faxing) must be in writing
and mailed to the appropriate address,
as set forth in the ADDRESSES section
above.
Before including your phone number,
e-mail address, or other personal
identifying information in your protest,
you should be aware that your entire
protest—including your personal
identifying information—may be made
publicly available at any time. While
you can ask us in your protest to
withhold your personal identifying
information from public review, we
cannot guarantee that we will be able to
do so.
Selma Sierra,
Utah State Director.
Authority: 40 CFR 1506.6, 43 CFR 1610.2,
43 CFR 1610.5–1.
[FR Doc. E8–17554 Filed 7–31–08; 8:45 am]
BILLING CODE 4310–DQ–P
mstockstill on PROD1PC66 with NOTICES
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[MT–926–1910–BJ–5RSD]
Montana: Filing of Plat of Survey
Bureau of Land Management,
Montana State Office, Interior.
AGENCY:
VerDate Aug<31>2005
19:39 Jul 31, 2008
Jkt 214001
ACTION:
Notice of filing of plat of survey.
SUMMARY: The Bureau of Land
Management (BLM) will file the plat of
survey of the lands described below in
the BLM Montana State Office, Billings,
Montana, (30) days from the date of
publication in the Federal Register.
FOR FURTHER INFORMATION CONTACT:
Marvin Montoya, Cadastral Surveyor,
Branch of Cadastral Survey, Bureau of
Land Management, 5001 Southgate
Drive, Billings, Montana 59101–4669,
telephone (406) 896–5124 or (406) 896–
5009.
SUPPLEMENTARY INFORMATION: This
survey was executed at the request of
the Fort Peck Agency, through the
Rocky Mountain Regional Director,
Bureau of Indian Affairs, and was
necessary to determine Trust and Tribal
land.
The lands we surveyed are:
Principal Meridian, Montana
T. 3 S., R. 33 E.
The plat, in 2 sheets, representing the
dependent resurvey of a portion of the
Buffalo Creek Guide Meridian, through
Township 3 South, a portion of the
subdivisional lines, a portion of the
subdivision of section 18, the adjusted
original meanders of the former right
and left banks of the Big Horn River,
downstream, through section 18, and
the subdivision of section 18, and the
survey of a portion of the meanders of
the present right bank of the Big Horn
River, downstream, through section 18,
the meanders of the former right and left
banks of two relicted channels of the Big
Horn River, downstream, through
section 18, the limits of erosion, through
section 18, the medial line of two
relicted channels of the Big Horn River,
through section 18, and certain division
of accretion and partition lines
Township 3 South, Range 33 East,
Principal Meridian, Montana, was
accepted July 18, 2008.
We will place a copy of the plat, in
2 sheets, and related field notes we
described in the open files. They will be
available to the public as a matter of
information.
If BLM receives a protest against this
survey, as shown on this plat, in two
sheets, prior to the date of the official
filing, we will stay the filing pending
our consideration of the protest.
We will not officially file this plat, in
two sheets, until the day after we have
accepted or dismissed all protests and
PO 00000
Frm 00096
Fmt 4703
Sfmt 4703
they have become final, including
decisions or appeals.
Dated: July 24, 2008.
Michael T. Birtles,
Chief Cadastral Surveyor, Division of
Resources.
[FR Doc. E8–17613 Filed 7–31–08; 8:45 am]
BILLING CODE 4310–$$–P
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[ID 100 1150 MR 241A: DBG081010]
Notice of Public Meeting: Off-Highway
Vehicle and Recreation Transportation
Management Sub-Group of the
Resource Advisory Council to the
Boise District, Bureau of Land
Management, U.S. Department of the
Interior
Bureau of Land Management,
U.S. Department of the Interior.
ACTION: Notice of public meeting.
AGENCY:
SUMMARY: In accordance with the
Federal Land Policy and Management
Act (FLPMA) and the Federal Advisory
Committee Act of 1972 (FACA), the U.S.
Department of the Interior, Bureau of
Land Management (BLM) Boise District,
Off-Highway Vehicle (OHV) and
Recreation Transportation Management
Sub-group of the Resource Advisory
Council, will hold meetings as indicated
below.
DATES: The first meeting will be held
August 11, 2008, beginning at 7 p.m.
and adjourning at 9 p.m. The meeting
will be held in a meeting room at the
Owyhee County Historical Museum in
Murphy Idaho. A public comment
period will be held before the
conclusion of the meeting.
FOR FURTHER INFORMATION CONTACT: MJ
Byrne, Public Affairs Officer and RAC
Coordinator, BLM Boise District, 3948
Development Ave., Boise, ID 83705,
Telephone (208) 384–3393.
SUPPLEMENTARY INFORMATION: The fivemember Sub-group provides advice to
the 15-member Council in the form of
recommendations that relate to public
concerns regarding Off-Highway Vehicle
(OHV) and Recreation Transportation
Management actions and issues related
to the BLM-managed public lands
located in the Boise District. This advice
is then forwarded to the Secretary of the
Interior, through the BLM, in the form
of recommendations. Items on the
E:\FR\FM\01AUN1.SGM
01AUN1
Agencies
[Federal Register Volume 73, Number 149 (Friday, August 1, 2008)]
[Notices]
[Page 45052]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-17613]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[MT-926-1910-BJ-5RSD]
Montana: Filing of Plat of Survey
AGENCY: Bureau of Land Management, Montana State Office, Interior.
ACTION: Notice of filing of plat of survey.
-----------------------------------------------------------------------
SUMMARY: The Bureau of Land Management (BLM) will file the plat of
survey of the lands described below in the BLM Montana State Office,
Billings, Montana, (30) days from the date of publication in the
Federal Register.
FOR FURTHER INFORMATION CONTACT: Marvin Montoya, Cadastral Surveyor,
Branch of Cadastral Survey, Bureau of Land Management, 5001 Southgate
Drive, Billings, Montana 59101-4669, telephone (406) 896-5124 or (406)
896-5009.
SUPPLEMENTARY INFORMATION: This survey was executed at the request of
the Fort Peck Agency, through the Rocky Mountain Regional Director,
Bureau of Indian Affairs, and was necessary to determine Trust and
Tribal land.
The lands we surveyed are:
Principal Meridian, Montana
T. 3 S., R. 33 E.
The plat, in 2 sheets, representing the dependent resurvey of a
portion of the Buffalo Creek Guide Meridian, through Township 3 South,
a portion of the subdivisional lines, a portion of the subdivision of
section 18, the adjusted original meanders of the former right and left
banks of the Big Horn River, downstream, through section 18, and the
subdivision of section 18, and the survey of a portion of the meanders
of the present right bank of the Big Horn River, downstream, through
section 18, the meanders of the former right and left banks of two
relicted channels of the Big Horn River, downstream, through section
18, the limits of erosion, through section 18, the medial line of two
relicted channels of the Big Horn River, through section 18, and
certain division of accretion and partition lines Township 3 South,
Range 33 East, Principal Meridian, Montana, was accepted July 18, 2008.
We will place a copy of the plat, in 2 sheets, and related field
notes we described in the open files. They will be available to the
public as a matter of information.
If BLM receives a protest against this survey, as shown on this
plat, in two sheets, prior to the date of the official filing, we will
stay the filing pending our consideration of the protest.
We will not officially file this plat, in two sheets, until the day
after we have accepted or dismissed all protests and they have become
final, including decisions or appeals.
Dated: July 24, 2008.
Michael T. Birtles,
Chief Cadastral Surveyor, Division of Resources.
[FR Doc. E8-17613 Filed 7-31-08; 8:45 am]
BILLING CODE 4310-$$-P