Whitman River Dam, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 43737-43738 [E8-17156]
Download as PDF
Federal Register / Vol. 73, No. 145 / Monday, July 28, 2008 / Notices
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13134) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–17149 Filed 7–25–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–437–000]
City of Toccoa, GA; Notice of
Application
jlentini on PROD1PC65 with NOTICES
July 21, 2008.
Take notice that on July 11, 2008, the
City of Toccoa, Georgia (Toccoa), 203
North Alexander Street, P.O. Box 579,
Toccoa, Georgia 30577, filed an
abbreviated application pursuant to
section 7(f) of the Natural Gas Act
(NGA) for a service area determination,
a finding that Toccoa qualifies as a local
distribution company for purposes of
section 311 of the Natural Gas Policy
Act (NGPA) and for waiver of the
Commission’s regulatory requirements,
including reporting and accounting
requirements ordinarily applicable to
natural gas companies under the NGA
and NGPA, all as more fully set forth in
the application which is on file with the
Commission and open to public
inspection. This filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
VerDate Aug<31>2005
18:35 Jul 25, 2008
Jkt 214001
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
Any initial questions regarding
Toccoa’s proposal in this application
should be directed to Joshua L. Menter,
Miller, Balis & O’Neil, P.C., 1140 19th
Street, NW., Washington, DC 20036;
telephone: (202) 296–2960 or
jmenter@mbolaw.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant. On
or before the comment date, it is not
necessary to serve motions to intervene
or protests on persons other than the
Applicant.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
43737
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit the original and 14
copies of the protest or intervention to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
Comment Date: August 11, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–17145 Filed 7–25–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13244–000]
Whitman River Dam, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
July 21, 2008.
On June 13, 2008, Whitman River
Dam, Inc. filed an application, pursuant
to section 4(f) of the Federal Power Act,
E:\FR\FM\28JYN1.SGM
28JYN1
43738
Federal Register / Vol. 73, No. 145 / Monday, July 28, 2008 / Notices
proposing to develop the hydroelectric
potential on Wampanoag Lake located
on the Whitman River in the Town of
Ashburnham, Worcester County,
Massachusetts.
The proposed project would consist
of: (1) An earthen dam, 22-foot-high and
660-foot-long, (2) a head pond with
storage of 1420.0 acre-feet, (3) one
existing 24-inch diameter discharge
pipe, and (4) a new powerhouse located
in the vicinity of the discharge pipe
containing one generating unit having a
capacity of 10 kilowatts. The project
would have an annual generation of
53,000 kilowatt hours and it is likely
that generation will interface with the
electric local distribution circuit.
Applicant Contact: Mr. Robert
Francis, President, Whitman River Dam,
Inc., P.O. Box 145, 10 Tommy Francis
Road, Westminster, MA 01473. FERC
Contact: Shameek Patel, 202–502–6736.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13244) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–17156 Filed 7–25–08; 8:45 am]
jlentini on PROD1PC65 with NOTICES
BILLING CODE 6717–01–P
VerDate Aug<31>2005
18:35 Jul 25, 2008
Jkt 214001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
July 18, 2008.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC08–111–000.
Applicants: Franklin Resources, Inc.
Description: Request for Blanket
Authorizations to Acquire Securities
Under section 203(a)(2) of the Federal
Power Act for Franklin Resources, Inc.
Filed Date: 07/16/2008.
Accession Number: 20080716–5009.
Comment Date: 5 p.m. Eastern Time
on Wednesday, August 6, 2008.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG08–79–000.
Applicants: NaturEner Glacier Wind
Energy 1, LLC.
Description: Self Certification Notice
of Naturener Glacier Wind Energy 1,
LLC.
Filed Date: 07/15/2008.
Accession Number: 20080715–5099.
Comment Date: 5 p.m. Eastern Time
on Tuesday, August 5, 2008.
Docket Numbers: EG08–80–000.
Applicants: Naturener Montana Wind
Energy, LLC.
Description: Self Certification Notice
of Naturener Montana Wind Energy,
LLC.
Filed Date: 07/15/2008.
Accession Number: 20080715–5100.
Comment Date: 5 p.m. Eastern Time
on Tuesday, August 5, 2008.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER01–2508–004.
Applicants: ENMAX Energy
Marketing, Inc.
Description: ENMAX Energy
Marketing, Inc. reports changes in status
that reflect a departure from the facts
relied upon in the grant of market-based
rate authority.
Filed Date: 07/16/2008.
Accession Number: 20080718–0199.
Comment Date: 5 p.m. Eastern Time
on Wednesday, August 6, 2008.
Docket Numbers: ER08–884–001;
ER08–913–001.
Applicants: Midwest Independent
Transmission System, Inc.; Independent
Transmission System Operator.
Description: Midwest Independent
Transmission System Operator, Inc. et
al. submits proposed Appendix H of the
Congestion Management Process of their
PO 00000
Frm 00064
Fmt 4703
Sfmt 4703
Joint Operating Agreements in
compliance with FERC’s July 1 Order.
Filed Date: 07/16/2008.
Accession Number: 20080718–0196.
Comment Date: 5 p.m. Eastern Time
on Wednesday, August 6, 2008.
Docket Numbers: ER07–59–004.
Applicants: Fortis Energy Marketing &
Trading GP.
Description: Fortis Energy Marketing
& Trading GP submits a supplement to
its 6/17/08 filing to include an
Appendix b (the Asset Matrix).
Filed Date: 07/03/2008.
Accession Number: 20080708–0006.
Comment Date: 5 p.m. Eastern Time
on Thursday, July 24, 2008.
Docket Numbers: ER08–370–002.
Applicants: Midwest Independent
Transmission System.
Description: Missouri River Energy
Services requests that FERC approve its
Attachment O Variance Filing and
Petition for Declaratory Order.
Filed Date: 07/16/2008.
Accession Number: 20080718–0223.
Comment Date: 5 p.m. Eastern Time
on Wednesday, August 6, 2008.
Docket Numbers: ER08–847–001.
Applicants: Union Electric Company.
Description: Entergy Arkansas, Inc.
submits the revised Interchange
Agreement between Union Electric
Company and EAI, designated as EAI
First Revised Rate Schedule 129 in
conformance with Order 614.
Filed Date: 07/15/2008.
Accession Number: 20080715–0144.
Comment Date: 5 p.m. Eastern Time
on Tuesday, August 5, 2008.
Docket Numbers: ER08–857–001.
Applicants: Southwestern Public
Service Company.
Description: Southwestern Public
Service Company submits SPS’s
proposed Electric Coordination Service
Tariff under ER08–857.
Filed Date: 07/16/2008.
Accession Number: 20080718–0198.
Comment Date: 5 p.m. Eastern Time
on Wednesday, August 6, 2008.
Docket Numbers: ER08–899–000;
ER08–899–001.
Applicants: Ohio Power Company.
Description: Ohio Power Company
withdraws the ‘‘Cost-Based Formula
Rate Agreement for Full Requirements
Electric Service’’, dated 4/30/08 with
Wheeling Power Company etc.
Filed Date: 07/15/2008.
Accession Number: 20080718–0181.
Comment Date: 5 p.m. Eastern Time
on Tuesday, August 5, 2008.
Docket Numbers: ER08–933–002;
ER08–934–003.
Applicants: Lempster Wind, LLC;
Locust Ridge II, LLC.
E:\FR\FM\28JYN1.SGM
28JYN1
Agencies
[Federal Register Volume 73, Number 145 (Monday, July 28, 2008)]
[Notices]
[Pages 43737-43738]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-17156]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13244-000]
Whitman River Dam, Inc.; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comment, Motions To Intervene, and
Competing Applications
July 21, 2008.
On June 13, 2008, Whitman River Dam, Inc. filed an application,
pursuant to section 4(f) of the Federal Power Act,
[[Page 43738]]
proposing to develop the hydroelectric potential on Wampanoag Lake
located on the Whitman River in the Town of Ashburnham, Worcester
County, Massachusetts.
The proposed project would consist of: (1) An earthen dam, 22-foot-
high and 660-foot-long, (2) a head pond with storage of 1420.0 acre-
feet, (3) one existing 24-inch diameter discharge pipe, and (4) a new
powerhouse located in the vicinity of the discharge pipe containing one
generating unit having a capacity of 10 kilowatts. The project would
have an annual generation of 53,000 kilowatt hours and it is likely
that generation will interface with the electric local distribution
circuit.
Applicant Contact: Mr. Robert Francis, President, Whitman River
Dam, Inc., P.O. Box 145, 10 Tommy Francis Road, Westminster, MA 01473.
FERC Contact: Shameek Patel, 202-502-6736.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of Commission's Web site at https://
www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13244) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-17156 Filed 7-25-08; 8:45 am]
BILLING CODE 6717-01-P