Dominion Cove Point LNG, LP; Notice of Intent To Prepare an Environmental Assessment for the Proposed Pier Reinforcement Project and Request for Comments on Environmental Issues, 43218-43221 [E8-16928]
Download as PDF
43218
Federal Register / Vol. 73, No. 143 / Thursday, July 24, 2008 / Notices
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8–16925 Filed 7–23–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PF08–20–000]
Dominion Cove Point LNG, LP; Notice
of Intent To Prepare an Environmental
Assessment for the Proposed Pier
Reinforcement Project and Request for
Comments on Environmental Issues
ebenthall on PRODPC60 with NOTICES
July 16, 2008.
The Federal Energy Regulatory
Commission (FERC or Commission), the
U.S. Department of Homeland Security,
U.S. Coast Guard (Coast Guard), and the
U.S. Army Corps of Engineers (Corps)
are evaluating the Pier Reinforcement
Project proposed by Dominion Cove
Point LNG, LP (DCP). The Pier
VerDate Aug<31>2005
15:14 Jul 23, 2008
Jkt 214001
Reinforcement Project would involve
modifications to the existing offshore
pier in the Chesapeake Bay at the Cove
Point Liquefied Natural Gas (LNG)
import terminal in Calvert County,
Maryland. The proposed project would
allow DCP to accommodate larger-sized
LNG vessels carrying cargoes of up to
267,000 cubic meters of LNG. Currently,
LNG vessels with a capacity of no
greater than 148,000 cubic meters are
authorized.
The FERC will be the lead federal
agency in the preparation of an
environmental assessment (EA) to
address the environmental impacts of
the proposed project, including the
effects of proposed LNG vessel traffic on
the waterway, and to satisfy the
requirements of the National
Environmental Policy Act of 1969
(NEPA). We have requested the formal
cooperation of other federal and state
resource agencies with jurisdiction or
special expertise with respect to
environmental issues. To date, the
Corps and the Coast Guard have agreed
to serve as cooperating agencies during
preparation of the EA. The Commission
will use the EA in its decision-making
process to determine whether or not to
authorize the project under section 3 of
the Natural Gas Act. The Corps will use
the EA to fulfill the requirements of its
regulations and the Clean Water Act
Section 404(b)(1) Guidelines. The Coast
Guard will review the EA as part of its
decision-making process to determine
the suitability of the waterway for LNG
marine traffic. The determination of
suitability will be made in a Letter of
Recommendation pursuant to Title 33 of
the Code of Federal Regulations (CFR),
Section 127.009.
This Notice of Intent to Prepare an
Environmental Assessment for the
Proposed Pier Reinforcement Project
(NOI) explains the scoping process we 1
will use to gather environmental input
from the public and interested agencies,
and summarizes the project review
process for the FERC and our
cooperating agencies. Details on how to
submit comments are provided in the
Public Participation section of this
notice. Please note that the comment
period will close on August 15, 2008.
We have prepared this NOI with the
cooperation of the Corps and Coast
Guard staff. The NOI is being sent to
federal, state, and local government
agencies; elected officials;
environmental and public interest
groups; Native American groups; other
interested parties; and local libraries
1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the FERC’s Office of Energy
Projects.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
and newspapers. We encourage
government representatives to notify
their constituents of this planned
project and encourage them to comment
on their areas of concern. Your input
will help the Commission determine the
issues that need to be evaluated in the
EA.
In accordance with Department of the
Army (DA) permit procedures, the
Corps is soliciting comments from the
public; federal, state, and local agencies
and officials; Indian tribes; and other
interested parties in order to consider
and evaluate the impacts of the
proposed project to waters of the United
States, including jurisdictional
wetlands. The Corps project number is
NAB–2008–01241–M05 (200861276
T61277) (DOMINION COVE POINT
LNG/PIER REINFORCEMENT
PROJECT). Any comments received will
be considered by the Corps to determine
whether to issue, modify, condition or
deny a permit for the proposal.
The Coast Guard is also soliciting
comments from the public; federal,
state, and local agencies and officials;
Indian tribes; and other interested
parties in order to consider and evaluate
the environmental impacts of its final
suitability determination for the
waterway for LNG marine traffic. This
determination will be contained in its
Letter of Recommendation (LOR). To
make this determination, the Coast
Guard will use comments received to
assess environmental impacts on the
entire waterway, including impacts on
endangered species, historic properties,
water quality, general environmental
effects, and the other public interest
factors, described in more detail below.
Summary of the Proposed Project
DCP is planning the Pier
Reinforcement Project to upgrade its
existing pier located approximately 1.1
miles offshore of the Cove Point LNG
Terminal. The project would enable the
safe docking, discharge, and departure
of larger vessels than currently
authorized. The larger vessels would
carry cargoes of up to 267,000 cubic
meters of LNG. To the extent that larger
vessels are utilized, comparable
quantities of LNG could be delivered
using fewer vessels. Therefore, the
proposed project may modify the size
and frequency of LNG marine traffic
transiting the waterway from the
territorial sea to the Cove Point LNG
Terminal. The terminal would remain
capable of receiving the types of vessels
that are in use today. The general
location of the proposed facilities and a
depiction of the waterway for LNG
E:\FR\FM\24JYN1.SGM
24JYN1
Federal Register / Vol. 73, No. 143 / Thursday, July 24, 2008 / Notices
ebenthall on PRODPC60 with NOTICES
marine traffic are shown in the figures
included as Appendix 1.2
The existing pier consists of two
berths, referred to as the North Berth
and South Berth. Proposed construction
includes the addition of four new
mooring dolphins and two new
breasting dolphins 3 at both the North
Berth and the South Berth; new
walkways to connect the mooring
dolphins to the existing pier; service
platform modifications; replacement of
the existing gangway system with an
automated gangway; upgrading the
docking control system; and relocating
some security systems. The proposed
construction would increase the overall
length of the pier by 300 feet. The
modified pier would be able to
accommodate vessels approximately
1,150 feet long and 187 feet wide, with
a maximum draft of 39.4 feet.
To accommodate deeper-draft vessels,
DCP would dredge approximately
150,000 cubic yards of sediment directly
around the pier to achieve a final water
depth of approximately 45 feet below
mean lower low water. Depending on
the chemical and physical properties of
the dredged material, DCP may use the
dredged material for beneficial use, but
is also identifying a confined disposal
facility in the case that beneficial use is
not feasible.
Dredging and constructing the
mooring and breasting dolphins would
permanently impact approximately 25
acres of Chesapeake Bay bottom and
would increase the footprint of the pier
by 1.03 acres. All offshore construction
activities would occur from the existing
pier structure and temporary barges.
Onshore impacts would be limited to a
staging area for construction equipment
and materials. DCP is currently
identifying likely staging areas in the
project vicinity.
DCP proposes to file a formal
application with the Commission in
December 2008. Pending Commission
approval and receipt of applicable
permits, DCP would begin construction
in the third quarter of 2009. Work
would extend approximately 18 months,
and would be phased to allow
2 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of all
appendices are available on the Commission’s Web
site at the ‘‘eLibrary’’ link or from the Commission’s
Public Reference Room, 888 First Street, NE.,
Washington, DC 20426, or call (202) 502–8371. For
instructions on connecting to eLibrary refer to the
Public Participation section of this notice. Copies of
the appendices were sent to all those receiving this
notice in the mail.
3 Dolphins are marine structures mounted on
piles, against which a moored ship rests (breasting
dolphin) and is secured to the pier (mooring
dolphin).
VerDate Aug<31>2005
15:14 Jul 23, 2008
Jkt 214001
construction on one berth while the
other berth remains operational.
The EA Process
NEPA requires the Commission to
take into account the environmental
impacts that could result from an action
when it considers whether or not an
LNG import terminal should be
approved. The FERC and our
cooperating agencies will use the EA to
consider the environmental impact that
could result if the project is authorized.
NEPA also requires us to discover and
address the public’s concerns about
proposals that require federal
authorizations. This process is referred
to as ‘‘scoping.’’ The main goal of the
scoping process is to focus the analysis
in the EA on the important
environmental issues. With this NOI, we
are requesting public comments on the
scope of the issues to be addressed in
the EA. All comments received will be
considered during preparation of the
EA.
Although no formal application has
been filed with the Commission, the
FERC staff has initiated its review of the
project under its NEPA Pre-filing
Process to encourage the early
involvement of stakeholders and to
identify and resolve issues before an
application is filed. As part of our PreFiling Process, we have begun to contact
federal and state agencies to discuss
their involvement in the scoping
process and the preparation of the EA.
In addition, the Coast Guard has
received a Letter of Intent from DCP
dated May 5, 2008, requesting that the
Coast Guard approve the suitability of
the planned Cove Point construction.
The Coast Guard must determine the
suitability of the waterway for LNG
marine traffic pursuant to 33 CFR
127.009. Representatives from the FERC
and the Coast Guard participated in a
public open house sponsored by DCP in
Solomons, Maryland on June 16, 2008,
during which they discussed the
agencies’ regulatory responsibilities and
explained the environmental review
process to interested stakeholders.
By this notice, we are formally
announcing our preparation of the EA
and requesting additional agency and
public comments to help focus our
analysis on potentially significant
environmental issues related to the
proposed actions. The EA will discuss
impacts that could occur as a result of
the construction and operation of the
proposed project, and the associated
LNG marine traffic in the waterway,
under the general headings of geology
and soils; land use; water resources,
fisheries, and wetlands; cultural
resources; vegetation and wildlife;
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
43219
threatened and endangered species; air
quality and noise; safety and reliability;
and cumulative impacts. The EA will
also evaluate reasonable alternatives to
the proposed project, alternatives for
agency actions, and make
recommendations on how to lessen or
avoid impacts on affected resources.
The Corps is responsible for
evaluating DCP’s application for a DA
Individual permit pursuant to Section
404 of the Clean Water Act (33 U.S.C.
1344) and Section 10 of the Rivers and
Harbors Act of 1899 (33 U.S.C. 403) for
proposed structures in and under
navigable waters, dredging and the
discharge of dredged, excavated, and/or
fill material into waters of the United
States, including wetlands. The Corps
staff has initiated its review of the
project under pre-application
coordination although no formal
application has been filed. The EA will
serve as the DA permit application for
this proposed project.
The Corps decision whether to issue
the permits will be based on an
evaluation of the probable impacts,
including cumulative impacts, of the
proposed project on the public interest.
The evaluation of the impact on the
public interest will include application,
by the Corps, of the guidelines [Section
404(b)(1)] promulgated by the
Administrator, U.S. Environmental
Protection Agency, under authority of
Section 404 of the Clean Water Act.
The Corps’ decision will reflect the
national concern for the protection and
utilization of important resources. The
benefits, which would be reasonably
expected to accrue from the proposed
project, must be balanced against its
reasonably foreseeable detriments. All
factors which may be relevant to the
proposed work will be considered,
including the cumulative effects thereof;
among those are conservation,
economics, aesthetics, general
environmental concerns, wetlands,
cultural values, fish and wildlife values,
flood hazards, floodplain values, land
use, navigation, shore erosion and
accretion, recreation, water supply, and
conservation, water quality, energy
needs, safety, food and fiber production,
consideration of property ownership,
and in general, the needs and welfare of
the people.
If applicable, the applicant is required
to obtain a Water Quality Certification
in accordance with Section 401 of the
Clean Water Act from the Maryland
Department of the Environment (MDE).
The Section 401 certifying agency has a
statutory limit of one year in which to
make their decision. Additionally, for
Corps permitting purposes, the
applicant is required to obtain Coastal
E:\FR\FM\24JYN1.SGM
24JYN1
43220
Federal Register / Vol. 73, No. 143 / Thursday, July 24, 2008 / Notices
ebenthall on PRODPC60 with NOTICES
Zone Management Consistency
concurrence from the MDE, as well. It
should be noted that the MDE has a
statutory limit of six months in which
to make its consistency determination.
The Coast Guard Letter of
Recommendation Process
The Coast Guard’s proposed action
will be the issuance of a Letter of
Recommendation (LOR), as required by
regulation, as to the suitability of the
waterway for the proposed LNG marine
traffic associated with the project.
The Coast Guard is responsible for
matters related to navigation safety,
vessel engineering and safety standards,
and all matters pertaining to the safety
of facilities or equipment located in or
adjacent to navigable waters up to the
last valve of an LNG facility
immediately before the receiving tanks.
The Coast Guard also has authority for
LNG facility security plan review,
approval, and compliance verification
pursuant to Title 33 CFR Part 105, and
recommendations for siting as it
pertains to the management of vessel
traffic in and around the LNG facility.
More specifically, the Coast Guard is
required to issue a LOR, as to the
suitability of the waterway for LNG
vessel traffic pursuant to 33 CFR
127.009. DCP submitted a Letter of
Intent (which initiates the LOR process),
on May 5, 2008 to the Coast Guard
Captains of the Port Baltimore and
Hampton Roads, proposing to modify
the Cove Point LNG Terminal pier and
requesting an LOR regarding the
suitability of the waterway for LNG
marine traffic. Upon receipt of a Letter
of Intent, the Coast Guard Captains of
the Port request that the applicant
conduct an analysis of the suitability of
the waterway for LNG vessel traffic i.e.,
a Waterway Suitability Assessment
(WSA). This will address the suitability
of the waterway relating to the proposed
changes to LNG vessel traffic. The WSA
will be submitted to the Coast Guard to
assist it in making its preliminary
determination as to whether the
waterway is suitable for proposed
changes to LNG vessel traffic associated
with the project. This preliminary
determination will be contained in a
Waterway Suitability Report (WSR)
issued by the Coast Guard to the
applicant.
The following factors, along with
comments received during the public
comment period, and the EA (and any
other appropriate NEPA
documentation), will be evaluated by
the Coast Guard prior to its final
determination as to the suitability of the
waterway for the proposed LNG marine
traffic to be contained in a LOR:
VerDate Aug<31>2005
15:14 Jul 23, 2008
Jkt 214001
• The physical location and
description of the facility;
• The layout of the facility and its
berthing and mooring arrangements;
• The LNG vessels’ characteristics
and frequency of facility shipments;
• Charts showing waterway channels
and identifying commercial, industrial,
environmentally sensitive, and
residential areas in and adjacent to the
waterway used by the LNG vessels en
route to the facility within 15.5 miles of
the facility;
• Density and character of the marine
traffic on the waterway;
• Locks, bridges, or other man-made
obstructions in the waterway; and
• The following factors adjacent to
the facility:
• Depth of water;
• Tidal range;
• Protection from high seas;
• Natural hazards, including reefs,
rocks, and sandbars;
• Underwater pipelines and cables;
and
• Distance of berthed LNG vessels
from the channel, and the width of the
channel.
A LOR will be issued to the owner or
operator of the LNG facility, DCP, and
to the state and local governments
having jurisdiction over the facility.
Currently Identified Environmental
Issues
We have already identified issues that
we think deserve attention based on
preliminary agency consultations and
information filed with the Commission.
This preliminary list of issues,
presented below, may be revised based
on your comments and our continuing
analyses.
• Potential impacts to the marine
environment from construction
activities and dredging including
habitats, water quality, and aquatic life;
• Potential impacts to the public and
environment from operation of larger
LNG vessels along the entire waterway,
including but not limited to, habitats,
water quality, and aquatic life;
• Alternative dredge material
disposal sites;
• Potential impacts on Essential Fish
Habitat and state and/or federally-listed
threatened and endangered species and
marine mammals, both in the project
area and along the entire waterway;
• Potential impacts to public use
resulting from any modification of the
safety and security zone, including the
zone around the pier;
• Potential impacts to the coastal
zone;
• Potential cumulative effects upon
the entire waterway; and
• Potential noise impacts due to pile
driving.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
The Magnuson-Stevens Fishery
Conservation and Management Act, as
amended by the Sustainable Fisheries
Act of 1996 (Pub. L. 04–267), requires
all federal agencies to consult with the
National Marine Fisheries Service
(NMFS) on all actions, or proposed
actions, permitted, funded, or
undertaken by the agency that may
adversely effect Essential Fish Habitat
(EFH). The project site lies in or
adjacent to EFH for the Scopthalmus
aquosos (windowpane flounder)
juvenile and adult; Pomatomus saltatrix
(bluefish) juvenile and adult; Peprilus
triacanthos (Atlantic butterfish) eggs,
larvae, juvenile, and adult; Paralicthys
dentatus (summer flounder) larvae,
juvenile, and adult; Centropristus striata
(black sea bass) juvenile and adult, and
the eggs, larvae, juvenile, and adult
stages of Sciaenops ocellatus (red
drum), Scomberomorus cavalla (king
mackerel), Scomberomorus maculatus
(spanish mackerel), and Rachycentron
canadum (cobia). The project has the
potential to adversely affect EFH or the
species of concern by loss of spawning,
nursery, forage, and/or shelter habitat.
The project area is not a Habitat Area of
Particular Concern and is not colonized
by submerged aquatic vegetation
species. The Corps Baltimore District
has preliminarily determined that the
adverse effects of this project would be
more than minimal, although not
substantial, and an abbreviated
consultation will be conducted with
NMFS. NMFS will also be consulted
regarding potential effects on EFH
resulting from LNG vessel traffic along
the waterway.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the Pier
Reinforcement Project, and proposed
larger LNG vessels transiting along the
entire waterway. Your comments should
focus on the potential environmental
effects, including impacts to people,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
All filed comments will be posted to the
FERC’s public record. To ensure timely
and proper recording, please send in
your comments so that they will be
received in Washington, DC on or before
August 15, 2008.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. In all
instances please reference the FERC’s
project docket number PF08–20–000
with your submission. The Commission
encourages electronic filing of
comments and has dedicated eFiling
E:\FR\FM\24JYN1.SGM
24JYN1
ebenthall on PRODPC60 with NOTICES
Federal Register / Vol. 73, No. 143 / Thursday, July 24, 2008 / Notices
staff available to assist you at 202–502–
8258 or efiling@ferc.gov.
(1) You may file your comments
electronically by using the Quick
Comment feature, which is located on
the Commission’s internet Web site at
https://www.ferc.gov under the link to
Documents and Filings. A Quick
Comment is an easy method for
interested persons to submit text-only
comments on a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s internet Web site at
https://www.ferc.gov under the link to
Documents and Filings. eFiling involves
preparing your submission in the same
manner as you would if filing on paper,
and then saving the file on your
computer’s hard drive. You will attach
that file as your submission. New
eFiling users must first create an
account by clicking on ‘‘Sign up’’ or
‘‘eRegister.’’ You will be asked to select
the type of filing you are making. A
comment on a particular project is
considered a ‘‘Comment on a Filing;’’ or
(3) You may file your comments via
mail to the Commission by sending an
original and two copies of your letter to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First St., NE., Room 1A, Washington, DC
20426.
Label one copy of the comments for
the attention of Gas Branch 3, PJ11.3.
You may also submit comments
directly to the Corps. All comments
received by the Corps will become part
of the Corps’ administrative record and
will be considered by the Corps in
evaluating the DA permit application.
The Corps project number is NAB–
2008–01241–M05 (200861276 T61277)
(DOMINION COVE POINT LNG/PIER
REINFORCEMENT PROJECT). Copies of
any written statements expressing
concern for aquatic resources may be
submitted to: Mrs. Kathy Anderson,
Corps of Engineers, CENAB–OP–RMS,
P.O. Box 1715, Baltimore, Maryland
21203–1715.
In addition, you may submit
comments directly to the Coast Guard.
All comments received will become part
of the Coast Guard’s administrative
record and will be considered by the
Coast Guard in preparing the LOR
regarding the suitability of the waterway
for LNG vessel traffic. Comments may
be submitted by mail to the below
address: U.S. Coast Guard Sector
Baltimore, 2401 Hawkins Point Road,
Attn: Waterways Management Div
(BLDG 70), Baltimore, MD 21226–1791;
or e-mail at Amy.M.Beach@uscg.mil.
Once DCP formally files its
application with the FERC, you may
VerDate Aug<31>2005
15:14 Jul 23, 2008
Jkt 214001
want to become an ‘‘intervenor,’’ which
is an official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in a
Commission proceeding by filing a
request to intervene. Instructions for
becoming an intervenor are included in
the User’s Guide under the ‘‘e-filing’’
link on the Commission’s web site.
Please note that you may not request
intervenor status at this time. You must
wait until a formal application is filed
with the Commission.
Environmental Mailing List
We may mail the EA for comment. If
you are interested in receiving the EA
for review and/or comment, please
return the Mailing List Retention Form
(Appendix 2). If you do not return the
Mailing List Retention Form, you will
be taken off the mailing list. All
individuals who provide written
comments will remain on our
environmental mailing list for this
project.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC (3372) or on the
FERC Internet Web site (https://
www.ferc.gov) using the ‘‘eLibrary link.’’
Click on the eLibrary link, select
‘‘General Search’’ and enter the project
docket number excluding the last three
digits in the ‘‘Docket Number’’ field (i.e.,
PF08–20). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or TTY, contact
(202) 502–8659. The eLibrary link on
the FERC Internet Web site also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
In addition, the FERC offers a free
service called eSubscription that allows
you to keep track of all formal issuances
and submittals in specific dockets. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. To register for this service,
go to https://www.ferc.gov/
esubscribenow.htm.
Fact sheets prepared by the FERC are
also available for viewing on the FERC
Internet Web site (https://www.ferc.gov),
using the ‘‘For Citizens’’ link. These fact
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
43221
sheets, including ‘‘A Guide to LNG—
What All Citizens Should Know’’ and
‘‘Guide to Electronic Information at
FERC,’’ address a number of typically
asked questions about LNG and provide
instructions on how to participate in the
Commission’s proceedings.
Finally, DCP has established an
Internet Web site at https://
www.dom.com/about/gas-transmission/
covepoint/pier_reinforcement/pdf/
cove_point_pier_reinforcement.pdf to
provide the public with information
about the Pier Reinforcement Project.
DCP’s Web site will be updated as the
project review progresses. You may also
use DCP’s toll free telephone number,
1–888–330–2092.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16928 Filed 7–23–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL03–56–001]
American Municipal Power-Ohio, Inc.
v. the Dayton Power & Light Company
and PJM Interconnection, L.L.C.;
Notice of Filing
July 16, 2008.
Take notice that on July 3, 2008,
Dayton Power & Light Company filed an
amendment to the stipulation and
agreement of settlement.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
E:\FR\FM\24JYN1.SGM
24JYN1
Agencies
[Federal Register Volume 73, Number 143 (Thursday, July 24, 2008)]
[Notices]
[Pages 43218-43221]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-16928]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. PF08-20-000]
Dominion Cove Point LNG, LP; Notice of Intent To Prepare an
Environmental Assessment for the Proposed Pier Reinforcement Project
and Request for Comments on Environmental Issues
July 16, 2008.
The Federal Energy Regulatory Commission (FERC or Commission), the
U.S. Department of Homeland Security, U.S. Coast Guard (Coast Guard),
and the U.S. Army Corps of Engineers (Corps) are evaluating the Pier
Reinforcement Project proposed by Dominion Cove Point LNG, LP (DCP).
The Pier Reinforcement Project would involve modifications to the
existing offshore pier in the Chesapeake Bay at the Cove Point
Liquefied Natural Gas (LNG) import terminal in Calvert County,
Maryland. The proposed project would allow DCP to accommodate larger-
sized LNG vessels carrying cargoes of up to 267,000 cubic meters of
LNG. Currently, LNG vessels with a capacity of no greater than 148,000
cubic meters are authorized.
The FERC will be the lead federal agency in the preparation of an
environmental assessment (EA) to address the environmental impacts of
the proposed project, including the effects of proposed LNG vessel
traffic on the waterway, and to satisfy the requirements of the
National Environmental Policy Act of 1969 (NEPA). We have requested the
formal cooperation of other federal and state resource agencies with
jurisdiction or special expertise with respect to environmental issues.
To date, the Corps and the Coast Guard have agreed to serve as
cooperating agencies during preparation of the EA. The Commission will
use the EA in its decision-making process to determine whether or not
to authorize the project under section 3 of the Natural Gas Act. The
Corps will use the EA to fulfill the requirements of its regulations
and the Clean Water Act Section 404(b)(1) Guidelines. The Coast Guard
will review the EA as part of its decision-making process to determine
the suitability of the waterway for LNG marine traffic. The
determination of suitability will be made in a Letter of Recommendation
pursuant to Title 33 of the Code of Federal Regulations (CFR), Section
127.009.
This Notice of Intent to Prepare an Environmental Assessment for
the Proposed Pier Reinforcement Project (NOI) explains the scoping
process we \1\ will use to gather environmental input from the public
and interested agencies, and summarizes the project review process for
the FERC and our cooperating agencies. Details on how to submit
comments are provided in the Public Participation section of this
notice. Please note that the comment period will close on August 15,
2008.
---------------------------------------------------------------------------
\1\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the FERC's Office of Energy Projects.
---------------------------------------------------------------------------
We have prepared this NOI with the cooperation of the Corps and
Coast Guard staff. The NOI is being sent to federal, state, and local
government agencies; elected officials; environmental and public
interest groups; Native American groups; other interested parties; and
local libraries and newspapers. We encourage government representatives
to notify their constituents of this planned project and encourage them
to comment on their areas of concern. Your input will help the
Commission determine the issues that need to be evaluated in the EA.
In accordance with Department of the Army (DA) permit procedures,
the Corps is soliciting comments from the public; federal, state, and
local agencies and officials; Indian tribes; and other interested
parties in order to consider and evaluate the impacts of the proposed
project to waters of the United States, including jurisdictional
wetlands. The Corps project number is NAB-2008-01241-M05 (200861276
T61277) (DOMINION COVE POINT LNG/PIER REINFORCEMENT PROJECT). Any
comments received will be considered by the Corps to determine whether
to issue, modify, condition or deny a permit for the proposal.
The Coast Guard is also soliciting comments from the public;
federal, state, and local agencies and officials; Indian tribes; and
other interested parties in order to consider and evaluate the
environmental impacts of its final suitability determination for the
waterway for LNG marine traffic. This determination will be contained
in its Letter of Recommendation (LOR). To make this determination, the
Coast Guard will use comments received to assess environmental impacts
on the entire waterway, including impacts on endangered species,
historic properties, water quality, general environmental effects, and
the other public interest factors, described in more detail below.
Summary of the Proposed Project
DCP is planning the Pier Reinforcement Project to upgrade its
existing pier located approximately 1.1 miles offshore of the Cove
Point LNG Terminal. The project would enable the safe docking,
discharge, and departure of larger vessels than currently authorized.
The larger vessels would carry cargoes of up to 267,000 cubic meters of
LNG. To the extent that larger vessels are utilized, comparable
quantities of LNG could be delivered using fewer vessels. Therefore,
the proposed project may modify the size and frequency of LNG marine
traffic transiting the waterway from the territorial sea to the Cove
Point LNG Terminal. The terminal would remain capable of receiving the
types of vessels that are in use today. The general location of the
proposed facilities and a depiction of the waterway for LNG
[[Page 43219]]
marine traffic are shown in the figures included as Appendix 1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of all appendices are
available on the Commission's Web site at the ``eLibrary'' link or
from the Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary refer to the Public Participation section of
this notice. Copies of the appendices were sent to all those
receiving this notice in the mail.
---------------------------------------------------------------------------
The existing pier consists of two berths, referred to as the North
Berth and South Berth. Proposed construction includes the addition of
four new mooring dolphins and two new breasting dolphins \3\ at both
the North Berth and the South Berth; new walkways to connect the
mooring dolphins to the existing pier; service platform modifications;
replacement of the existing gangway system with an automated gangway;
upgrading the docking control system; and relocating some security
systems. The proposed construction would increase the overall length of
the pier by 300 feet. The modified pier would be able to accommodate
vessels approximately 1,150 feet long and 187 feet wide, with a maximum
draft of 39.4 feet.
---------------------------------------------------------------------------
\3\ Dolphins are marine structures mounted on piles, against
which a moored ship rests (breasting dolphin) and is secured to the
pier (mooring dolphin).
---------------------------------------------------------------------------
To accommodate deeper-draft vessels, DCP would dredge approximately
150,000 cubic yards of sediment directly around the pier to achieve a
final water depth of approximately 45 feet below mean lower low water.
Depending on the chemical and physical properties of the dredged
material, DCP may use the dredged material for beneficial use, but is
also identifying a confined disposal facility in the case that
beneficial use is not feasible.
Dredging and constructing the mooring and breasting dolphins would
permanently impact approximately 25 acres of Chesapeake Bay bottom and
would increase the footprint of the pier by 1.03 acres. All offshore
construction activities would occur from the existing pier structure
and temporary barges. Onshore impacts would be limited to a staging
area for construction equipment and materials. DCP is currently
identifying likely staging areas in the project vicinity.
DCP proposes to file a formal application with the Commission in
December 2008. Pending Commission approval and receipt of applicable
permits, DCP would begin construction in the third quarter of 2009.
Work would extend approximately 18 months, and would be phased to allow
construction on one berth while the other berth remains operational.
The EA Process
NEPA requires the Commission to take into account the environmental
impacts that could result from an action when it considers whether or
not an LNG import terminal should be approved. The FERC and our
cooperating agencies will use the EA to consider the environmental
impact that could result if the project is authorized. NEPA also
requires us to discover and address the public's concerns about
proposals that require federal authorizations. This process is referred
to as ``scoping.'' The main goal of the scoping process is to focus the
analysis in the EA on the important environmental issues. With this
NOI, we are requesting public comments on the scope of the issues to be
addressed in the EA. All comments received will be considered during
preparation of the EA.
Although no formal application has been filed with the Commission,
the FERC staff has initiated its review of the project under its NEPA
Pre-filing Process to encourage the early involvement of stakeholders
and to identify and resolve issues before an application is filed. As
part of our Pre-Filing Process, we have begun to contact federal and
state agencies to discuss their involvement in the scoping process and
the preparation of the EA. In addition, the Coast Guard has received a
Letter of Intent from DCP dated May 5, 2008, requesting that the Coast
Guard approve the suitability of the planned Cove Point construction.
The Coast Guard must determine the suitability of the waterway for LNG
marine traffic pursuant to 33 CFR 127.009. Representatives from the
FERC and the Coast Guard participated in a public open house sponsored
by DCP in Solomons, Maryland on June 16, 2008, during which they
discussed the agencies' regulatory responsibilities and explained the
environmental review process to interested stakeholders.
By this notice, we are formally announcing our preparation of the
EA and requesting additional agency and public comments to help focus
our analysis on potentially significant environmental issues related to
the proposed actions. The EA will discuss impacts that could occur as a
result of the construction and operation of the proposed project, and
the associated LNG marine traffic in the waterway, under the general
headings of geology and soils; land use; water resources, fisheries,
and wetlands; cultural resources; vegetation and wildlife; threatened
and endangered species; air quality and noise; safety and reliability;
and cumulative impacts. The EA will also evaluate reasonable
alternatives to the proposed project, alternatives for agency actions,
and make recommendations on how to lessen or avoid impacts on affected
resources.
The Corps is responsible for evaluating DCP's application for a DA
Individual permit pursuant to Section 404 of the Clean Water Act (33
U.S.C. 1344) and Section 10 of the Rivers and Harbors Act of 1899 (33
U.S.C. 403) for proposed structures in and under navigable waters,
dredging and the discharge of dredged, excavated, and/or fill material
into waters of the United States, including wetlands. The Corps staff
has initiated its review of the project under pre-application
coordination although no formal application has been filed. The EA will
serve as the DA permit application for this proposed project.
The Corps decision whether to issue the permits will be based on an
evaluation of the probable impacts, including cumulative impacts, of
the proposed project on the public interest. The evaluation of the
impact on the public interest will include application, by the Corps,
of the guidelines [Section 404(b)(1)] promulgated by the Administrator,
U.S. Environmental Protection Agency, under authority of Section 404 of
the Clean Water Act.
The Corps' decision will reflect the national concern for the
protection and utilization of important resources. The benefits, which
would be reasonably expected to accrue from the proposed project, must
be balanced against its reasonably foreseeable detriments. All factors
which may be relevant to the proposed work will be considered,
including the cumulative effects thereof; among those are conservation,
economics, aesthetics, general environmental concerns, wetlands,
cultural values, fish and wildlife values, flood hazards, floodplain
values, land use, navigation, shore erosion and accretion, recreation,
water supply, and conservation, water quality, energy needs, safety,
food and fiber production, consideration of property ownership, and in
general, the needs and welfare of the people.
If applicable, the applicant is required to obtain a Water Quality
Certification in accordance with Section 401 of the Clean Water Act
from the Maryland Department of the Environment (MDE). The Section 401
certifying agency has a statutory limit of one year in which to make
their decision. Additionally, for Corps permitting purposes, the
applicant is required to obtain Coastal
[[Page 43220]]
Zone Management Consistency concurrence from the MDE, as well. It
should be noted that the MDE has a statutory limit of six months in
which to make its consistency determination.
The Coast Guard Letter of Recommendation Process
The Coast Guard's proposed action will be the issuance of a Letter
of Recommendation (LOR), as required by regulation, as to the
suitability of the waterway for the proposed LNG marine traffic
associated with the project.
The Coast Guard is responsible for matters related to navigation
safety, vessel engineering and safety standards, and all matters
pertaining to the safety of facilities or equipment located in or
adjacent to navigable waters up to the last valve of an LNG facility
immediately before the receiving tanks. The Coast Guard also has
authority for LNG facility security plan review, approval, and
compliance verification pursuant to Title 33 CFR Part 105, and
recommendations for siting as it pertains to the management of vessel
traffic in and around the LNG facility.
More specifically, the Coast Guard is required to issue a LOR, as
to the suitability of the waterway for LNG vessel traffic pursuant to
33 CFR 127.009. DCP submitted a Letter of Intent (which initiates the
LOR process), on May 5, 2008 to the Coast Guard Captains of the Port
Baltimore and Hampton Roads, proposing to modify the Cove Point LNG
Terminal pier and requesting an LOR regarding the suitability of the
waterway for LNG marine traffic. Upon receipt of a Letter of Intent,
the Coast Guard Captains of the Port request that the applicant conduct
an analysis of the suitability of the waterway for LNG vessel traffic
i.e., a Waterway Suitability Assessment (WSA). This will address the
suitability of the waterway relating to the proposed changes to LNG
vessel traffic. The WSA will be submitted to the Coast Guard to assist
it in making its preliminary determination as to whether the waterway
is suitable for proposed changes to LNG vessel traffic associated with
the project. This preliminary determination will be contained in a
Waterway Suitability Report (WSR) issued by the Coast Guard to the
applicant.
The following factors, along with comments received during the
public comment period, and the EA (and any other appropriate NEPA
documentation), will be evaluated by the Coast Guard prior to its final
determination as to the suitability of the waterway for the proposed
LNG marine traffic to be contained in a LOR:
The physical location and description of the facility;
The layout of the facility and its berthing and mooring
arrangements;
The LNG vessels' characteristics and frequency of facility
shipments;
Charts showing waterway channels and identifying
commercial, industrial, environmentally sensitive, and residential
areas in and adjacent to the waterway used by the LNG vessels en route
to the facility within 15.5 miles of the facility;
Density and character of the marine traffic on the
waterway;
Locks, bridges, or other man-made obstructions in the
waterway; and
The following factors adjacent to the facility:
Depth of water;
Tidal range;
Protection from high seas;
Natural hazards, including reefs, rocks, and sandbars;
Underwater pipelines and cables; and
Distance of berthed LNG vessels from the channel, and the
width of the channel.
A LOR will be issued to the owner or operator of the LNG facility,
DCP, and to the state and local governments having jurisdiction over
the facility.
Currently Identified Environmental Issues
We have already identified issues that we think deserve attention
based on preliminary agency consultations and information filed with
the Commission. This preliminary list of issues, presented below, may
be revised based on your comments and our continuing analyses.
Potential impacts to the marine environment from
construction activities and dredging including habitats, water quality,
and aquatic life;
Potential impacts to the public and environment from
operation of larger LNG vessels along the entire waterway, including
but not limited to, habitats, water quality, and aquatic life;
Alternative dredge material disposal sites;
Potential impacts on Essential Fish Habitat and state and/
or federally-listed threatened and endangered species and marine
mammals, both in the project area and along the entire waterway;
Potential impacts to public use resulting from any
modification of the safety and security zone, including the zone around
the pier;
Potential impacts to the coastal zone;
Potential cumulative effects upon the entire waterway; and
Potential noise impacts due to pile driving.
The Magnuson-Stevens Fishery Conservation and Management Act, as
amended by the Sustainable Fisheries Act of 1996 (Pub. L. 04-267),
requires all federal agencies to consult with the National Marine
Fisheries Service (NMFS) on all actions, or proposed actions,
permitted, funded, or undertaken by the agency that may adversely
effect Essential Fish Habitat (EFH). The project site lies in or
adjacent to EFH for the Scopthalmus aquosos (windowpane flounder)
juvenile and adult; Pomatomus saltatrix (bluefish) juvenile and adult;
Peprilus triacanthos (Atlantic butterfish) eggs, larvae, juvenile, and
adult; Paralicthys dentatus (summer flounder) larvae, juvenile, and
adult; Centropristus striata (black sea bass) juvenile and adult, and
the eggs, larvae, juvenile, and adult stages of Sciaenops ocellatus
(red drum), Scomberomorus cavalla (king mackerel), Scomberomorus
maculatus (spanish mackerel), and Rachycentron canadum (cobia). The
project has the potential to adversely affect EFH or the species of
concern by loss of spawning, nursery, forage, and/or shelter habitat.
The project area is not a Habitat Area of Particular Concern and is not
colonized by submerged aquatic vegetation species. The Corps Baltimore
District has preliminarily determined that the adverse effects of this
project would be more than minimal, although not substantial, and an
abbreviated consultation will be conducted with NMFS. NMFS will also be
consulted regarding potential effects on EFH resulting from LNG vessel
traffic along the waterway.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the Pier Reinforcement Project, and proposed
larger LNG vessels transiting along the entire waterway. Your comments
should focus on the potential environmental effects, including impacts
to people, reasonable alternatives, and measures to avoid or lessen
environmental impacts. All filed comments will be posted to the FERC's
public record. To ensure timely and proper recording, please send in
your comments so that they will be received in Washington, DC on or
before August 15, 2008.
For your convenience, there are three methods you can use to submit
your comments to the Commission. In all instances please reference the
FERC's project docket number PF08-20-000 with your submission. The
Commission encourages electronic filing of comments and has dedicated
eFiling
[[Page 43221]]
staff available to assist you at 202-502-8258 or efiling@ferc.gov.
(1) You may file your comments electronically by using the Quick
Comment feature, which is located on the Commission's internet Web site
at https://www.ferc.gov under the link to Documents and Filings. A Quick
Comment is an easy method for interested persons to submit text-only
comments on a project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's internet Web site at
https://www.ferc.gov under the link to Documents and Filings. eFiling
involves preparing your submission in the same manner as you would if
filing on paper, and then saving the file on your computer's hard
drive. You will attach that file as your submission. New eFiling users
must first create an account by clicking on ``Sign up'' or
``eRegister.'' You will be asked to select the type of filing you are
making. A comment on a particular project is considered a ``Comment on
a Filing;'' or
(3) You may file your comments via mail to the Commission by
sending an original and two copies of your letter to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First St., NE.,
Room 1A, Washington, DC 20426.
Label one copy of the comments for the attention of Gas Branch 3,
PJ11.3.
You may also submit comments directly to the Corps. All comments
received by the Corps will become part of the Corps' administrative
record and will be considered by the Corps in evaluating the DA permit
application. The Corps project number is NAB-2008-01241-M05 (200861276
T61277) (DOMINION COVE POINT LNG/PIER REINFORCEMENT PROJECT). Copies of
any written statements expressing concern for aquatic resources may be
submitted to: Mrs. Kathy Anderson, Corps of Engineers, CENAB-OP-RMS,
P.O. Box 1715, Baltimore, Maryland 21203-1715.
In addition, you may submit comments directly to the Coast Guard.
All comments received will become part of the Coast Guard's
administrative record and will be considered by the Coast Guard in
preparing the LOR regarding the suitability of the waterway for LNG
vessel traffic. Comments may be submitted by mail to the below address:
U.S. Coast Guard Sector Baltimore, 2401 Hawkins Point Road, Attn:
Waterways Management Div (BLDG 70), Baltimore, MD 21226-1791; or e-mail
at Amy.M.Beach@uscg.mil.
Once DCP formally files its application with the FERC, you may want
to become an ``intervenor,'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in a Commission proceeding by
filing a request to intervene. Instructions for becoming an intervenor
are included in the User's Guide under the ``e-filing'' link on the
Commission's web site. Please note that you may not request intervenor
status at this time. You must wait until a formal application is filed
with the Commission.
Environmental Mailing List
We may mail the EA for comment. If you are interested in receiving
the EA for review and/or comment, please return the Mailing List
Retention Form (Appendix 2). If you do not return the Mailing List
Retention Form, you will be taken off the mailing list. All individuals
who provide written comments will remain on our environmental mailing
list for this project.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC (3372) or on
the FERC Internet Web site (https://www.ferc.gov) using the ``eLibrary
link.'' Click on the eLibrary link, select ``General Search'' and enter
the project docket number excluding the last three digits in the
``Docket Number'' field (i.e., PF08-20). Be sure you have selected an
appropriate date range. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or TTY, contact (202) 502-8659. The eLibrary link on the FERC Internet
Web site also provides access to the texts of formal documents issued
by the Commission, such as orders, notices, and rule makings.
In addition, the FERC offers a free service called eSubscription
that allows you to keep track of all formal issuances and submittals in
specific dockets. This can reduce the amount of time you spend
researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. To register for this service, go to https://www.ferc.gov/
esubscribenow.htm.
Fact sheets prepared by the FERC are also available for viewing on
the FERC Internet Web site (https://www.ferc.gov), using the ``For
Citizens'' link. These fact sheets, including ``A Guide to LNG--What
All Citizens Should Know'' and ``Guide to Electronic Information at
FERC,'' address a number of typically asked questions about LNG and
provide instructions on how to participate in the Commission's
proceedings.
Finally, DCP has established an Internet Web site at https://
www.dom.com/about/gas-transmission/covepoint/pier_reinforcement/pdf/
cove_point_pier_reinforcement.pdf to provide the public with
information about the Pier Reinforcement Project. DCP's Web site will
be updated as the project review progresses. You may also use DCP's
toll free telephone number, 1-888-330-2092.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-16928 Filed 7-23-08; 8:45 am]
BILLING CODE 6717-01-P