Download as PDF 42564 Federal Register / Vol. 73, No. 141 / Tuesday, July 22, 2008 / Notices 4, LLC, 69 Bridge Street, Manchester, MA 01944, phone (978) 232–3536. FERC Contact: Robert Bell, (202) 502– 6062. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (P–13147 or P–13148) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E8–16691 Filed 7–21–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13151–000; Project No. 13152– 000] FFP Ohio River 5, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications sroberts on PROD1PC70 with NOTICES July 15, 2008. On March 25, 2008, FFP Ohio River 5, LLC and FFP Ohio River 6, LLC each filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Ohio River 5 and Ohio River 6 Projects, to be located on the Ohio River in Spencer County, Indiana and Daviess County, Kentucky. The proposed Ohio River 5 Project consists of: (1) 3,480 proposed 20 kilowatt Free Flow generating units having a total installed capacity of 69.6 VerDate Aug<31>2005 19:47 Jul 21, 2008 Jkt 214001 megawatts, (2) a proposed transmission line, and (3) appurtenant facilities. The FFP Ohio River 5, LLC, project would have an average annual generation of 304.85 gigawatt-hours and be sold to a local utility. The proposed Ohio River 6 Project consists of: (1) 2,700 proposed 20 kilowatt Free Flow generating units having a total installed capacity of 54 megawatts, (2) a proposed transmission line, and (3) appurtenant facilities. The FFP Ohio River 6, LLC, project would have an average annual generation of 236.52 gigawatt-hours and be sold to a local utility. Applicant Contact: Mr. Dan Irvin, FFP Ohio River 5, LLC and FFP Ohio River 6, LLC, 69 Bridge Street, Manchester, MA 01944, phone (978) 232–3536. FERC Contact: Robert Bell, (202) 502– 6062. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (P–13147 or P–13148) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E8–16692 Filed 7–21–08; 8:45 am] BILLING CODE 6717–01–P PO 00000 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. QF08–16–000] Harris Teeter, Wilson, NC; Notice of Filing of Notice of Self-Certification of Qualifying Status of a Cogeneration Facility July 15, 2008. Take notice that on October 15, 2007, Harris Teeter, 701 Crestdale Road, Matthews, NC 28105, filed with the Federal Energy Regulatory Commission a notice of self-certification of a facility as a qualifying cogeneration facility pursuant to 18 CFR 292.207(a) of the Commission’s regulations. This qualifying cogeneration facility consists of a 600 kW packaged diesel engine generator set operating on #2 fuel oil. The package is set on a concrete pad. The unit is self-contained, including all necessary switchgear and controls. The electricity is generated at 480 V, 3 phase, 60 Hz. The facility is located at 3401 Raleigh Road Parkway West, Wilson, NC 27896. This qualifying facility interconnects with Wilson Energy’s electric distribution system. The facility will provide standby power and occasionally supplementary power to Harris Teeter. A notice of self-certification does not institute a proceeding regarding qualifying facility status; a notice of selfcertification provides notice that the entity making filing has determined the Facility meets the applicable criteria to be a qualifying facility. Any person seeking to challenge such qualifying facility status may do so by filing a motion pursuant to 18 CFR 292.207(d)(iii). This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Kimberly D. Bose, Secretary. [FR Doc. E8–16690 Filed 7–21–08; 8:45 am] BILLING CODE 6717–01–P Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\22JYN1.SGM 22JYN1

Agencies

[Federal Register Volume 73, Number 141 (Tuesday, July 22, 2008)]
[Notices]
[Page 42564]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-16692]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13151-000; Project No. 13152-000]


FFP Ohio River 5, LLC; Notice of Preliminary Permit Applications 
Accepted for Filing and Soliciting Comment, Motions To Intervene, and 
Competing Applications

July 15, 2008.
    On March 25, 2008, FFP Ohio River 5, LLC and FFP Ohio River 6, LLC 
each filed an application, pursuant to section 4(f) of the Federal 
Power Act, proposing to study the feasibility of the Ohio River 5 and 
Ohio River 6 Projects, to be located on the Ohio River in Spencer 
County, Indiana and Daviess County, Kentucky.
    The proposed Ohio River 5 Project consists of: (1) 3,480 proposed 
20 kilowatt Free Flow generating units having a total installed 
capacity of 69.6 megawatts, (2) a proposed transmission line, and (3) 
appurtenant facilities. The FFP Ohio River 5, LLC, project would have 
an average annual generation of 304.85 gigawatt-hours and be sold to a 
local utility.
    The proposed Ohio River 6 Project consists of: (1) 2,700 proposed 
20 kilowatt Free Flow generating units having a total installed 
capacity of 54 megawatts, (2) a proposed transmission line, and (3) 
appurtenant facilities. The FFP Ohio River 6, LLC, project would have 
an average annual generation of 236.52 gigawatt-hours and be sold to a 
local utility.
    Applicant Contact: Mr. Dan Irvin, FFP Ohio River 5, LLC and FFP 
Ohio River 6, LLC, 69 Bridge Street, Manchester, MA 01944, phone (978) 
232-3536.
    FERC Contact: Robert Bell, (202) 502-6062.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or 
printed on the ``eLibrary'' link of Commission's Web site at https://
www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13147 
or P-13148) in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
[FR Doc. E8-16692 Filed 7-21-08; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.