FFP Ohio River 3, LLC, FFP Ohio River 4, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 42563-42564 [E8-16691]
Download as PDF
sroberts on PROD1PC70 with NOTICES
Federal Register / Vol. 73, No. 141 / Tuesday, July 22, 2008 / Notices
interconnect with and deliver natural
gas from the storage facility to the
Gulfstream and the FPL lateral
pipelines;
• Interconnection points with the
Gulfstream pipeline at milepost (MP)
4.18 and with the FPL lateral at MP
4.05; and
• A metering and regulating station.
FGS proposes to have the facilities
installed and operational within 36
months of commencing construction;
however, based on market conditions at
the time of construction, the storage
facility construction may be separated
into two phases.
The Final EIS has been placed in the
public files of the FERC and is available
for public inspection at: Federal Energy
Regulatory Commission, Public
Reference Room, 888 First Street NE.,
Room 2A, Washington, DC 20426, (202)
502–8371.
CD–ROM copies of the Final EIS have
been mailed to federal, state, and local
agencies; public interest groups;
individuals and affected landowners
who requested a copy of the Final EIS
or provided comments during scoping;
libraries and newspapers in the Project
area; and parties to this proceeding.
Hard copy versions of the Final EIS
were mailed to those specifically
requesting them. A limited number of
hard copies and CD–ROMs are available
from the Public Reference Room
identified above.
In accordance with the Council on
Environmental Quality’s regulations
implementing NEPA, no agency
decision on a proposed action may be
made until 30 days after the EPA
publishes a notice of availability of a
Final EIS.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC (3372) or on the
FERC Internet Web site (https://
www.ferc.gov). Using the ‘‘eLibrary
link,’’ select ‘‘General Search’’ and enter
the project docket number excluding the
last three digits (i.e., CP08–13) in the
‘‘Docket Number’’ field. Be sure you
have selected an appropriate date range.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or TTY (202)
502–8659. The eLibrary link on the
FERC Internet Web site also provides
access to the texts of formal documents
issued by the Commission, such as
orders, notices, and rule makings.
In addition, the FERC now offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
VerDate Aug<31>2005
19:47 Jul 21, 2008
Jkt 214001
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. To register for this service,
go to https://www.ferc.gov/
esubscribenow.htm.
It is requested that you communicate
the foregoing information concerning
the proposed work to any persons
known by you to be interested and not
being known to this office, who did not
receive a copy of this notice.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16705 Filed 7–21–08; 8:45 am]
42563
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on July 28, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16694 Filed 7–21–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. RM06–22–002]
North American Electric Reliability
Corporation; Notice of Filing
July 11, 2008.
Take notice that on June 27, 2008, the
North American Electric Reliability
Corporation in compliance with
Commission Order No. 706,1 submits
modifications to Violation Risk Factors
for Requirements or Sub-Requirements
in the Critical Infrastructure Protection
Reliability Standards.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
1 Mandatory Reliability Standards for Critical
Infrastructure Protection (Order No. 706), 122 FERC
¶ 61,040 (2008).
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Project No. 13147–000; Project No. 13148–
000]
FFP Ohio River 3, LLC, FFP Ohio River
4, LLC; Notice of Preliminary Permit
Applications Accepted for Filing and
Soliciting Comment, Motions To
Intervene, and Competing Applications
July 15, 2008.
On March 25, 2008, FFP Ohio River
3, LLC and FFP Ohio River 4, LLC each
filed an application, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Ohio River
3 and Ohio River 4 Projects, to be
located on the Ohio River in
Vanderburgh and Warrick Counties,
Indiana and Henderson County,
Kentucky.
The proposed Ohio River 3 Project
consists of: (1) 3,840 proposed 20
kilowatt Free Flow generating units
having a total installed capacity of 76.8
megawatts, (2) a proposed transmission
line, and (3) appurtenant facilities. The
FFP Ohio River 3, LLC, project would
have an average annual generation of
336.38 gigawatt-hours and be sold to a
local utility.
The proposed Ohio River 4 Project
consists of: (1) 1,860 proposed 20
kilowatt Free Flow generating units
having a total installed capacity of 37.2
megawatts, (2) a proposed transmission
line, and (3) appurtenant facilities. The
FFP Ohio River 4, LLC, project would
have an average annual generation of
162.94 gigawatt-hours and be sold to a
local utility.
Applicant Contact: Mr. Dan Irvin, FFP
Ohio River 3, LLC and FFP Ohio River
E:\FR\FM\22JYN1.SGM
22JYN1
42564
Federal Register / Vol. 73, No. 141 / Tuesday, July 22, 2008 / Notices
4, LLC, 69 Bridge Street, Manchester,
MA 01944, phone (978) 232–3536.
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13147 or P–13148) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16691 Filed 7–21–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13151–000; Project No. 13152–
000]
FFP Ohio River 5, LLC; Notice of
Preliminary Permit Applications
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
sroberts on PROD1PC70 with NOTICES
July 15, 2008.
On March 25, 2008, FFP Ohio River
5, LLC and FFP Ohio River 6, LLC each
filed an application, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Ohio River
5 and Ohio River 6 Projects, to be
located on the Ohio River in Spencer
County, Indiana and Daviess County,
Kentucky.
The proposed Ohio River 5 Project
consists of: (1) 3,480 proposed 20
kilowatt Free Flow generating units
having a total installed capacity of 69.6
VerDate Aug<31>2005
19:47 Jul 21, 2008
Jkt 214001
megawatts, (2) a proposed transmission
line, and (3) appurtenant facilities. The
FFP Ohio River 5, LLC, project would
have an average annual generation of
304.85 gigawatt-hours and be sold to a
local utility.
The proposed Ohio River 6 Project
consists of: (1) 2,700 proposed 20
kilowatt Free Flow generating units
having a total installed capacity of 54
megawatts, (2) a proposed transmission
line, and (3) appurtenant facilities. The
FFP Ohio River 6, LLC, project would
have an average annual generation of
236.52 gigawatt-hours and be sold to a
local utility.
Applicant Contact: Mr. Dan Irvin, FFP
Ohio River 5, LLC and FFP Ohio River
6, LLC, 69 Bridge Street, Manchester,
MA 01944, phone (978) 232–3536.
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13147 or P–13148) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16692 Filed 7–21–08; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. QF08–16–000]
Harris Teeter, Wilson, NC; Notice of
Filing of Notice of Self-Certification of
Qualifying Status of a Cogeneration
Facility
July 15, 2008.
Take notice that on October 15, 2007,
Harris Teeter, 701 Crestdale Road,
Matthews, NC 28105, filed with the
Federal Energy Regulatory Commission
a notice of self-certification of a facility
as a qualifying cogeneration facility
pursuant to 18 CFR 292.207(a) of the
Commission’s regulations.
This qualifying cogeneration facility
consists of a 600 kW packaged diesel
engine generator set operating on #2 fuel
oil. The package is set on a concrete
pad. The unit is self-contained,
including all necessary switchgear and
controls. The electricity is generated at
480 V, 3 phase, 60 Hz. The facility is
located at 3401 Raleigh Road Parkway
West, Wilson, NC 27896.
This qualifying facility interconnects
with Wilson Energy’s electric
distribution system. The facility will
provide standby power and occasionally
supplementary power to Harris Teeter.
A notice of self-certification does not
institute a proceeding regarding
qualifying facility status; a notice of selfcertification provides notice that the
entity making filing has determined the
Facility meets the applicable criteria to
be a qualifying facility. Any person
seeking to challenge such qualifying
facility status may do so by filing a
motion pursuant to 18 CFR
292.207(d)(iii).
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16690 Filed 7–21–08; 8:45 am]
BILLING CODE 6717–01–P
Frm 00023
Fmt 4703
Sfmt 4703
E:\FR\FM\22JYN1.SGM
22JYN1
Agencies
[Federal Register Volume 73, Number 141 (Tuesday, July 22, 2008)]
[Notices]
[Pages 42563-42564]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-16691]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13147-000; Project No. 13148-000]
FFP Ohio River 3, LLC, FFP Ohio River 4, LLC; Notice of
Preliminary Permit Applications Accepted for Filing and Soliciting
Comment, Motions To Intervene, and Competing Applications
July 15, 2008.
On March 25, 2008, FFP Ohio River 3, LLC and FFP Ohio River 4, LLC
each filed an application, pursuant to section 4(f) of the Federal
Power Act, proposing to study the feasibility of the Ohio River 3 and
Ohio River 4 Projects, to be located on the Ohio River in Vanderburgh
and Warrick Counties, Indiana and Henderson County, Kentucky.
The proposed Ohio River 3 Project consists of: (1) 3,840 proposed
20 kilowatt Free Flow generating units having a total installed
capacity of 76.8 megawatts, (2) a proposed transmission line, and (3)
appurtenant facilities. The FFP Ohio River 3, LLC, project would have
an average annual generation of 336.38 gigawatt-hours and be sold to a
local utility.
The proposed Ohio River 4 Project consists of: (1) 1,860 proposed
20 kilowatt Free Flow generating units having a total installed
capacity of 37.2 megawatts, (2) a proposed transmission line, and (3)
appurtenant facilities. The FFP Ohio River 4, LLC, project would have
an average annual generation of 162.94 gigawatt-hours and be sold to a
local utility.
Applicant Contact: Mr. Dan Irvin, FFP Ohio River 3, LLC and FFP
Ohio River
[[Page 42564]]
4, LLC, 69 Bridge Street, Manchester, MA 01944, phone (978) 232-3536.
FERC Contact: Robert Bell, (202) 502-6062.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of Commission's Web site at https://
www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13147
or P-13148) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-16691 Filed 7-21-08; 8:45 am]
BILLING CODE 6717-01-P