Harris Teeter, Wilson, NC; Notice of Filing of Notice of Self-Certification of Qualifying Status of a Cogeneration Facility, 42564 [E8-16690]
Download as PDF
42564
Federal Register / Vol. 73, No. 141 / Tuesday, July 22, 2008 / Notices
4, LLC, 69 Bridge Street, Manchester,
MA 01944, phone (978) 232–3536.
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13147 or P–13148) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16691 Filed 7–21–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13151–000; Project No. 13152–
000]
FFP Ohio River 5, LLC; Notice of
Preliminary Permit Applications
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
sroberts on PROD1PC70 with NOTICES
July 15, 2008.
On March 25, 2008, FFP Ohio River
5, LLC and FFP Ohio River 6, LLC each
filed an application, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Ohio River
5 and Ohio River 6 Projects, to be
located on the Ohio River in Spencer
County, Indiana and Daviess County,
Kentucky.
The proposed Ohio River 5 Project
consists of: (1) 3,480 proposed 20
kilowatt Free Flow generating units
having a total installed capacity of 69.6
VerDate Aug<31>2005
19:47 Jul 21, 2008
Jkt 214001
megawatts, (2) a proposed transmission
line, and (3) appurtenant facilities. The
FFP Ohio River 5, LLC, project would
have an average annual generation of
304.85 gigawatt-hours and be sold to a
local utility.
The proposed Ohio River 6 Project
consists of: (1) 2,700 proposed 20
kilowatt Free Flow generating units
having a total installed capacity of 54
megawatts, (2) a proposed transmission
line, and (3) appurtenant facilities. The
FFP Ohio River 6, LLC, project would
have an average annual generation of
236.52 gigawatt-hours and be sold to a
local utility.
Applicant Contact: Mr. Dan Irvin, FFP
Ohio River 5, LLC and FFP Ohio River
6, LLC, 69 Bridge Street, Manchester,
MA 01944, phone (978) 232–3536.
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13147 or P–13148) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16692 Filed 7–21–08; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. QF08–16–000]
Harris Teeter, Wilson, NC; Notice of
Filing of Notice of Self-Certification of
Qualifying Status of a Cogeneration
Facility
July 15, 2008.
Take notice that on October 15, 2007,
Harris Teeter, 701 Crestdale Road,
Matthews, NC 28105, filed with the
Federal Energy Regulatory Commission
a notice of self-certification of a facility
as a qualifying cogeneration facility
pursuant to 18 CFR 292.207(a) of the
Commission’s regulations.
This qualifying cogeneration facility
consists of a 600 kW packaged diesel
engine generator set operating on #2 fuel
oil. The package is set on a concrete
pad. The unit is self-contained,
including all necessary switchgear and
controls. The electricity is generated at
480 V, 3 phase, 60 Hz. The facility is
located at 3401 Raleigh Road Parkway
West, Wilson, NC 27896.
This qualifying facility interconnects
with Wilson Energy’s electric
distribution system. The facility will
provide standby power and occasionally
supplementary power to Harris Teeter.
A notice of self-certification does not
institute a proceeding regarding
qualifying facility status; a notice of selfcertification provides notice that the
entity making filing has determined the
Facility meets the applicable criteria to
be a qualifying facility. Any person
seeking to challenge such qualifying
facility status may do so by filing a
motion pursuant to 18 CFR
292.207(d)(iii).
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16690 Filed 7–21–08; 8:45 am]
BILLING CODE 6717–01–P
Frm 00023
Fmt 4703
Sfmt 4703
E:\FR\FM\22JYN1.SGM
22JYN1
Agencies
[Federal Register Volume 73, Number 141 (Tuesday, July 22, 2008)]
[Notices]
[Page 42564]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-16690]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. QF08-16-000]
Harris Teeter, Wilson, NC; Notice of Filing of Notice of Self-
Certification of Qualifying Status of a Cogeneration Facility
July 15, 2008.
Take notice that on October 15, 2007, Harris Teeter, 701 Crestdale
Road, Matthews, NC 28105, filed with the Federal Energy Regulatory
Commission a notice of self-certification of a facility as a qualifying
cogeneration facility pursuant to 18 CFR 292.207(a) of the Commission's
regulations.
This qualifying cogeneration facility consists of a 600 kW packaged
diesel engine generator set operating on 2 fuel oil. The
package is set on a concrete pad. The unit is self-contained, including
all necessary switchgear and controls. The electricity is generated at
480 V, 3 phase, 60 Hz. The facility is located at 3401 Raleigh Road
Parkway West, Wilson, NC 27896.
This qualifying facility interconnects with Wilson Energy's
electric distribution system. The facility will provide standby power
and occasionally supplementary power to Harris Teeter.
A notice of self-certification does not institute a proceeding
regarding qualifying facility status; a notice of self-certification
provides notice that the entity making filing has determined the
Facility meets the applicable criteria to be a qualifying facility. Any
person seeking to challenge such qualifying facility status may do so
by filing a motion pursuant to 18 CFR 292.207(d)(iii).
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-16690 Filed 7-21-08; 8:45 am]
BILLING CODE 6717-01-P