Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Section 110(a)(1) 8-Hour Ozone Maintenance Plan and 2002 Base-Year Inventory for the Pike County Area, 42263-42265 [E8-16476]

Download as PDF Federal Register / Vol. 73, No. 140 / Monday, July 21, 2008 / Rules and Regulations Issued in Seattle, Washington, on July 9, 2008. Kevin Nolan, Acting Manager, Operations Support Group, Western Service Center. [FR Doc. E8–16516 Filed 7–18–08; 8:45 am] BILLING CODE 4910–13–P DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 71 [Docket No. FAA–2008–0204; Airspace Docket No. 08–AWP–5] Revocation of Class E Airspace; Luke AFB, Phoenix, AZ Federal Aviation Administration (FAA), DOT. ACTION: Final rule. AGENCY: SUMMARY: This action will revoke Class E airspace at Luke AFB, Phoenix, AZ. The United States Air Force (USAF) is closing the airport to Instrument Flight Rules (IFR) operations when the Air Traffic Control Tower (ATCT) is closed. DATES: Effective Date: 0901 UTC, September 25, 2008. The Director of the Federal Register approves this incorporation by reference action under 1 CFR part 51, subject to the annual revision of FAA Order 7400.9 and publication of conforming amendments. FOR FURTHER INFORMATION CONTACT: Eldon Taylor, Federal Aviation Administration, Operations Support Group, Western Service Area, 1601 Lind Avenue, SW., Renton, WA 98057; telephone (425) 203–4537. SUPPLEMENTARY INFORMATION: yshivers on PROD1PC62 with RULES History On April 11, 2008, the FAA published in the Federal Register a notice of proposed rulemaking to revoke controlled airspace at Luke AFB, Phoenix, AZ (73 FR 19777). This action would remove class E airspace and restrict IFR aircraft from landing at Luke AFB when the Air Traffic Control tower is closed. Interested parties were invited to participate in this rulemaking effort by submitting written comments on the proposal to the FAA. No comments were received. Class E airspace designations are published in paragraph 6005 of FAA Order 7400.9R signed August 15, 2007, and effective September 15, 2007, which is incorporated by reference in 14 CFR part 71.1. The Class E airspace designations listed in this document will be published subsequently in that Order. VerDate Aug<31>2005 15:43 Jul 18, 2008 Jkt 214001 The Rule § 71.1 This action amends Title 14 Code of Federal Regulations (14 CFR) part 71 by revoking the Class E airspace area at Luke AFB, Phoenix, AZ. The USAF is restricting IFR aircraft landing at Luke AFB, Phoenix, AZ, when the ATCT is closed. The FAA has determined that this regulation only involves an established body of technical regulations for which frequent and routine amendments are necessary to keep them operationally current. Therefore, this regulation: (1) Is not a ‘‘significant regulatory action’’ under Executive Order 12866; (2) is not a ‘‘significant rule’’ under DOT Regulatory Policies and Procedures (44 FR 11034; February 26, 1979); and (3) does not warrant preparation of a regulatory evaluation as the anticipated impact is so minimal. Since this is a routine matter that will only affect air traffic procedures and air navigation, it is certified that this rule, when promulgated, will not have a significant economic impact on a substantial number of small entities under the criteria of the Regulatory Flexibility Act. The FAAs authority to issue rules regarding aviation safety is found in Title 49 of the U.S. Code. Subtitle 1, Section 106 discusses the authority of the FAA Administrator. Subtitle VII, Aviation Programs, describes in more detail the scope of the agency’s authority. This rulemaking is promulgated under the authority described in Subtitle VII, Part A, Subpart I, Section 40103. Under that section, the FAA is charged with prescribing regulations to assign the use of airspace necessary to ensure the safety of aircraft and the efficient use of airspace. This regulation is within the scope of that authority as it revokes controlled airspace at Luke AFB, Phoenix, AZ. 42263 I List of Subjects in 14 CFR Part 71 Airspace, Incorporation by reference, Navigation (air). Adoption of the Amendment In consideration of the foregoing, the Federal Aviation Administration amends 14 CFR part 71 as follows: I PART 71—DESIGNATION OF CLASS A, B, C, D, AND E AIRSPACE AREAS; AIR TRAFFIC SERVICE ROUTES; AND REPORTING POINTS 1. The authority citation for 14 CFR part 71 continues to read as follows: I Authority: 49 U.S.C. 106(g), 40103, 40113, 40120; E. O. 10854, 24 FR 9565, 3 CFR, 1959– 1963 Comp., p. 389. PO 00000 Frm 00007 Fmt 4700 Sfmt 4700 [Amended] 2. The incorporation by reference in 14 CFR 71.1 of the Federal Aviation Administration Order 7400.9R, Airspace Designations and Reporting Points, signed August 15, 2007, and effective September 15, 2007, is amended as follows: Paragraph 6002 Class E airspace Designated as Surface Areas. * * * AWP AZ E2 [Revoked] * * * * Phoenix, Luke AFB, AZ * * * Issued in Seattle, Washington, on July 9, 2008. Kevin Nolan, Acting Manager, Operations Support Group, Western Service Center. [FR Doc. E8–16517 Filed 7–18–08; 8:45 am] BILLING CODE 4910–13–P ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA–R03–OAR–2008–0187; FRL–8694–7] Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Section 110(a)(1) 8-Hour Ozone Maintenance Plan and 2002 Base-Year Inventory for the Pike County Area Environmental Protection Agency (EPA). ACTION: Final rule. AGENCY: SUMMARY: EPA is approving a State Implementation Plan (SIP) revision submitted by the Commonwealth of Pennsylvania. The Pennsylvania Department of Environmental Protection (PADEP) submitted a SIP revision consisting of a maintenance plan that provides for continued attainment of the 8-hour ozone national ambient air quality standard (NAAQS) for at least 10 years after the April 30, 2004, designations, as well as a 2002 base-year inventory for the Pike County Area. EPA is approving the maintenance plan and the 2002 base-year inventory for the Pike County Area as revisions to the Pennsylvania SIP in accordance with the requirements of the Clean Air Act (CAA). Effective Date: This final rule is effective on August 20, 2008. ADDRESSES: EPA has established a docket for this action under Docket ID Number EPA–R03–OAR–2008–0187. All documents in the docket are listed in the www.regulations.gov Web site. DATES: E:\FR\FM\21JYR1.SGM 21JYR1 42264 Federal Register / Vol. 73, No. 140 / Monday, July 21, 2008 / Rules and Regulations Although listed in the electronic docket, some information is not publicly available, i.e., confidential business information (CBI) or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically through www.regulations.gov or in hard copy for public inspection during normal business hours at the Air Protection Division, U.S. Environmental Protection Agency, Region III, 1650 Arch Street, Philadelphia, Pennsylvania 19103. Copies of the State submittal are available at the Pennsylvania Department of Environment Protection, Bureau of Air Quality Control, P.O. Box 8468, 400 Market Street, Harrisburg, Pennsylvania 17105. FOR FURTHER INFORMATION CONTACT: Melissa Linden, (215) 814–2096, or by e-mail at linden.melissa@epa.gov. SUPPLEMENTARY INFORMATION: I. Background On May 27, 2008 (73 FR 30350), EPA published a notice of proposed rulemaking (NPR) for the Commonwealth of Pennsylvania. The NPR proposed approval of Pennsylvania’s SIP revision that establishes a maintenance plan for the Pike County Area that provides for continued attainment of the 8-hour ozone NAAQS for at least 10 years after designation, and a 2002 base-year emissions inventory. The formal SIP revisions were submitted by PADEP on December 17, 2007. Other specific requirements of Pennsylvania’s SIP revision and the rationales for EPA’s proposed actions are explained in the NPR and will not be restated here. No public comments were received on the NPR. II. Final Action EPA is approving the maintenance plan and the 2002 base-year inventory for the Pike County Area, submitted on December 17, 2007, as revisions to the Pennsylvania SIP. EPA is approving the maintenance plan and 2002 base-year inventory for the Pike County Area because it meets the requirements of section 110(a)(1) of the CAA. yshivers on PROD1PC62 with RULES III. Statutory and Executive Order Reviews A. General Requirements Under the Clean Air Act, the Administrator is required to approve a SIP submission that complies with the provisions of the Act and applicable VerDate Aug<31>2005 15:43 Jul 18, 2008 Jkt 214001 Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA’s role is to approve state choices, provided that they meet the criteria of the Clean Air Act. Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action: • Is not a ‘‘significant regulatory action’’ subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); • Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.); • Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.); • Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104–4); • Does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999); • Is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997); • Is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001); • Is not subject to requirements of Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the Clean Air Act; and • Does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994). In addition, this rule does not have tribal implications as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), because the SIP is not approved to apply in Indian country located in the state, and EPA notes that it will not impose substantial direct costs on tribal governments or preempt tribal law. B. Submission to Congress and the Comptroller General The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small PO 00000 Frm 00008 Fmt 4700 Sfmt 4700 Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a ‘‘major rule’’ as defined by 5 U.S.C. 804(2). C. Petitions for Judicial Review Under section 307(b)(1) of the Clean Air Act, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by September 19, 2008. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action approving the maintenance plan and the 2002 baseyear inventory for the Pike County Area may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2).) List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference, Nitrogen dioxide, Ozone, Reporting and recordkeeping requirements, Volatile organic compounds. Dated: July 10, 2008. Donald S. Welsh, Regional Administrator, Region III. I 40 CFR part 52 is amended as follows: PART 52—[AMENDED] 1. The authority citation for part 52 continues to read as follows: I Authority: 42 U.S.C. 7401 et seq. Subpart NN—Pennsylvania 2. In § 52.2020, the table in paragraph (e)(1) is amended by adding an entry for the 8-Hour Ozone Maintenance Plan and 2002 Base-Year Inventory for Pike County at the end of the table to read as follows: I E:\FR\FM\21JYR1.SGM 21JYR1 42265 Federal Register / Vol. 73, No. 140 / Monday, July 21, 2008 / Rules and Regulations § 52.2020 Identification of plan. * * * * (e) * * * (1) * * * * Name of non-regulatory SIP revision Applicable geographic area * * * 8-Hour Ozone Maintenance Plan and 2002 BaseYear Inventory. * Pike County ...................... * * * * * [FR Doc. E8–16476 Filed 7–18–08; 8:45 am] BILLING CODE 6560–50–P DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket No. FEMA–B–7793] Changes in Flood Elevation Determinations Federal Emergency Management Agency, DHS. ACTION: Interim rule. yshivers on PROD1PC62 with RULES AGENCY: SUMMARY: This interim rule lists communities where modification of the Base (1% annual-chance) Flood Elevations (BFEs) is appropriate because of new scientific or technical data. New flood insurance premium rates will be calculated from the modified BFEs for new buildings and their contents. DATES: These modified BFEs are currently in effect on the dates listed in the table below and revise the Flood Insurance Rate Maps (FIRMs) in effect prior to this determination for the listed communities. From the date of the second publication of these changes in a newspaper of local circulation, any person has ninety (90) days in which to request through the community that the Mitigation Assistant Administrator of FEMA reconsider the changes. The modified BFEs may be changed during the 90-day period. ADDRESSES: The modified BFEs for each community are available for inspection at the office of the Chief Executive Officer of each community. The VerDate Aug<31>2005 15:43 Jul 18, 2008 Jkt 214001 State submittal date * 12/17/07 respective addresses are listed in the table below. FOR FURTHER INFORMATION CONTACT: William R. Blanton, Jr., Engineering Management Branch, Mitigation Directorate, Federal Emergency Management Agency, 500 C Street, SW., Washington, DC 20472, (202) 646–3151. SUPPLEMENTARY INFORMATION: The modified BFEs are not listed for each community in this interim rule. However, the address of the Chief Executive Officer of the community where the modified BFE determinations are available for inspection is provided. Any request for reconsideration must be based on knowledge of changed conditions or new scientific or technical data. The modifications are made pursuant to section 201 of the Flood Disaster Protection Act of 1973, 42 U.S.C. 4105, and are in accordance with the National Flood Insurance Act of 1968, 42 U.S.C. 4001 et seq., and with 44 CFR part 65. For rating purposes, the currently effective community number is shown and must be used for all new policies and renewals. The modified BFEs are the basis for the floodplain management measures that the community is required to either adopt or to show evidence of being already in effect in order to qualify or to remain qualified for participation in the National Flood Insurance Program (NFIP). These modified BFEs, together with the floodplain management criteria required by 44 CFR 60.3, are the minimum that are required. They should not be construed to mean that the community must change any existing ordinances that are more stringent in their floodplain management requirements. The community may at any time enact stricter requirements of its own, or pursuant to policies established by the other Federal, State, or regional entities. PO 00000 Frm 00009 Fmt 4700 Sfmt 4700 EPA approval date * 07/21/08. [Insert page number where the document begins]. Additional explanation * The changed BFEs are in accordance with 44 CFR 65.4. National Environmental Policy Act. This interim rule is categorically excluded from the requirements of 44 CFR part 10, Environmental Consideration. An environmental impact assessment has not been prepared. Regulatory Flexibility Act. As flood elevation determinations are not within the scope of the Regulatory Flexibility Act, 5 U.S.C. 601–612, a regulatory flexibility analysis is not required. Regulatory Classification. This interim rule is not a significant regulatory action under the criteria of section 3(f) of Executive Order 12866 of September 30, 1993, Regulatory Planning and Review, 58 FR 51735. Executive Order 13132, Federalism. This interim rule involves no policies that have federalism implications under Executive Order 13132, Federalism. Executive Order 12988, Civil Justice Reform. This interim rule meets the applicable standards of Executive Order 12988. List of Subjects in 44 CFR Part 65 Flood insurance, Floodplains, Reporting and recordkeeping requirements. Accordingly, 44 CFR part 65 is amended to read as follows: I PART 65—[AMENDED] 1. The authority citation for part 65 continues to read as follows: I Authority: 42 U.S.C. 4001 et seq.; Reorganization Plan No. 3 of 1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR, 1979 Comp., p. 376. § 65.4 [Amended] 2. The tables published under the authority of § 65.4 are amended as follows: I E:\FR\FM\21JYR1.SGM 21JYR1

Agencies

[Federal Register Volume 73, Number 140 (Monday, July 21, 2008)]
[Rules and Regulations]
[Pages 42263-42265]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-16476]


=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[EPA-R03-OAR-2008-0187; FRL-8694-7]


Approval and Promulgation of Air Quality Implementation Plans; 
Pennsylvania; Section 110(a)(1) 8-Hour Ozone Maintenance Plan and 2002 
Base-Year Inventory for the Pike County Area

AGENCY: Environmental Protection Agency (EPA).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: EPA is approving a State Implementation Plan (SIP) revision 
submitted by the Commonwealth of Pennsylvania. The Pennsylvania 
Department of Environmental Protection (PADEP) submitted a SIP revision 
consisting of a maintenance plan that provides for continued attainment 
of the 8-hour ozone national ambient air quality standard (NAAQS) for 
at least 10 years after the April 30, 2004, designations, as well as a 
2002 base-year inventory for the Pike County Area. EPA is approving the 
maintenance plan and the 2002 base-year inventory for the Pike County 
Area as revisions to the Pennsylvania SIP in accordance with the 
requirements of the Clean Air Act (CAA).

DATES: Effective Date: This final rule is effective on August 20, 2008.

ADDRESSES: EPA has established a docket for this action under Docket ID 
Number EPA-R03-OAR-2008-0187. All documents in the docket are listed in 
the www.regulations.gov Web site.

[[Page 42264]]

Although listed in the electronic docket, some information is not 
publicly available, i.e., confidential business information (CBI) or 
other information whose disclosure is restricted by statute. Certain 
other material, such as copyrighted material, is not placed on the 
Internet and will be publicly available only in hard copy form. 
Publicly available docket materials are available either electronically 
through www.regulations.gov or in hard copy for public inspection 
during normal business hours at the Air Protection Division, U.S. 
Environmental Protection Agency, Region III, 1650 Arch Street, 
Philadelphia, Pennsylvania 19103. Copies of the State submittal are 
available at the Pennsylvania Department of Environment Protection, 
Bureau of Air Quality Control, P.O. Box 8468, 400 Market Street, 
Harrisburg, Pennsylvania 17105.

FOR FURTHER INFORMATION CONTACT: Melissa Linden, (215) 814-2096, or by 
e-mail at linden.melissa@epa.gov.

SUPPLEMENTARY INFORMATION: 

I. Background

    On May 27, 2008 (73 FR 30350), EPA published a notice of proposed 
rulemaking (NPR) for the Commonwealth of Pennsylvania. The NPR proposed 
approval of Pennsylvania's SIP revision that establishes a maintenance 
plan for the Pike County Area that provides for continued attainment of 
the 8-hour ozone NAAQS for at least 10 years after designation, and a 
2002 base-year emissions inventory. The formal SIP revisions were 
submitted by PADEP on December 17, 2007. Other specific requirements of 
Pennsylvania's SIP revision and the rationales for EPA's proposed 
actions are explained in the NPR and will not be restated here. No 
public comments were received on the NPR.

II. Final Action

    EPA is approving the maintenance plan and the 2002 base-year 
inventory for the Pike County Area, submitted on December 17, 2007, as 
revisions to the Pennsylvania SIP. EPA is approving the maintenance 
plan and 2002 base-year inventory for the Pike County Area because it 
meets the requirements of section 110(a)(1) of the CAA.

III. Statutory and Executive Order Reviews

A. General Requirements

    Under the Clean Air Act, the Administrator is required to approve a 
SIP submission that complies with the provisions of the Act and 
applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). 
Thus, in reviewing SIP submissions, EPA's role is to approve state 
choices, provided that they meet the criteria of the Clean Air Act. 
Accordingly, this action merely approves state law as meeting Federal 
requirements and does not impose additional requirements beyond those 
imposed by state law. For that reason, this action:
     Is not a ``significant regulatory action'' subject to 
review by the Office of Management and Budget under Executive Order 
12866 (58 FR 51735, October 4, 1993);
     Does not impose an information collection burden under the 
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
     Is certified as not having a significant economic impact 
on a substantial number of small entities under the Regulatory 
Flexibility Act (5 U.S.C. 601 et seq.);
     Does not contain any unfunded mandate or significantly or 
uniquely affect small governments, as described in the Unfunded 
Mandates Reform Act of 1995 (Pub. L. 104-4);
     Does not have Federalism implications as specified in 
Executive Order 13132 (64 FR 43255, August 10, 1999);
     Is not an economically significant regulatory action based 
on health or safety risks subject to Executive Order 13045 (62 FR 
19885, April 23, 1997);
     Is not a significant regulatory action subject to 
Executive Order 13211 (66 FR 28355, May 22, 2001);
     Is not subject to requirements of Section 12(d) of the 
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 
note) because application of those requirements would be inconsistent 
with the Clean Air Act; and
     Does not provide EPA with the discretionary authority to 
address, as appropriate, disproportionate human health or environmental 
effects, using practicable and legally permissible methods, under 
Executive Order 12898 (59 FR 7629, February 16, 1994).
    In addition, this rule does not have tribal implications as 
specified by Executive Order 13175 (65 FR 67249, November 9, 2000), 
because the SIP is not approved to apply in Indian country located in 
the state, and EPA notes that it will not impose substantial direct 
costs on tribal governments or preempt tribal law.

B. Submission to Congress and the Comptroller General

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the 
Small Business Regulatory Enforcement Fairness Act of 1996, generally 
provides that before a rule may take effect, the agency promulgating 
the rule must submit a rule report, which includes a copy of the rule, 
to each House of the Congress and to the Comptroller General of the 
United States. EPA will submit a report containing this action and 
other required information to the U.S. Senate, the U.S. House of 
Representatives, and the Comptroller General of the United States prior 
to publication of the rule in the Federal Register. A major rule cannot 
take effect until 60 days after it is published in the Federal 
Register. This action is not a ``major rule'' as defined by 5 U.S.C. 
804(2).

C. Petitions for Judicial Review

    Under section 307(b)(1) of the Clean Air Act, petitions for 
judicial review of this action must be filed in the United States Court 
of Appeals for the appropriate circuit by September 19, 2008. Filing a 
petition for reconsideration by the Administrator of this final rule 
does not affect the finality of this action for the purposes of 
judicial review nor does it extend the time within which a petition for 
judicial review may be filed, and shall not postpone the effectiveness 
of such rule or action.
    This action approving the maintenance plan and the 2002 base-year 
inventory for the Pike County Area may not be challenged later in 
proceedings to enforce its requirements. (See section 307(b)(2).)

List of Subjects in 40 CFR Part 52

    Environmental protection, Air pollution control, Incorporation by 
reference, Nitrogen dioxide, Ozone, Reporting and recordkeeping 
requirements, Volatile organic compounds.

    Dated: July 10, 2008.
Donald S. Welsh,
Regional Administrator, Region III.

0
40 CFR part 52 is amended as follows:

PART 52--[AMENDED]

0
1. The authority citation for part 52 continues to read as follows:

    Authority: 42 U.S.C. 7401 et seq.

Subpart NN--Pennsylvania

0
2. In Sec.  52.2020, the table in paragraph (e)(1) is amended by adding 
an entry for the 8-Hour Ozone Maintenance Plan and 2002 Base-Year 
Inventory for Pike County at the end of the table to read as follows:

[[Page 42265]]

Sec.  52.2020  Identification of plan.

* * * * *
    (e) * * *
    (1) * * *

----------------------------------------------------------------------------------------------------------------
   Name of non-regulatory SIP          Applicable           State                                Additional
            revision                geographic area    submittal date   EPA approval date        explanation
----------------------------------------------------------------------------------------------------------------
 
                                                  * * * * * * *
8-Hour Ozone Maintenance Plan     Pike County........        12/17/07  07/21/08. [Insert    ....................
 and 2002 Base-Year Inventory.                                          page number where
                                                                        the document
                                                                        begins].
----------------------------------------------------------------------------------------------------------------

* * * * *
 [FR Doc. E8-16476 Filed 7-18-08; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.