Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Section 110(a)(1) 8-Hour Ozone Maintenance Plan and 2002 Base-Year Inventory for the Pike County Area, 42263-42265 [E8-16476]
Download as PDF
Federal Register / Vol. 73, No. 140 / Monday, July 21, 2008 / Rules and Regulations
Issued in Seattle, Washington, on July 9,
2008.
Kevin Nolan,
Acting Manager, Operations Support Group,
Western Service Center.
[FR Doc. E8–16516 Filed 7–18–08; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 71
[Docket No. FAA–2008–0204; Airspace
Docket No. 08–AWP–5]
Revocation of Class E Airspace; Luke
AFB, Phoenix, AZ
Federal Aviation
Administration (FAA), DOT.
ACTION: Final rule.
AGENCY:
SUMMARY: This action will revoke Class
E airspace at Luke AFB, Phoenix, AZ.
The United States Air Force (USAF) is
closing the airport to Instrument Flight
Rules (IFR) operations when the Air
Traffic Control Tower (ATCT) is closed.
DATES: Effective Date: 0901 UTC,
September 25, 2008. The Director of the
Federal Register approves this
incorporation by reference action under
1 CFR part 51, subject to the annual
revision of FAA Order 7400.9 and
publication of conforming amendments.
FOR FURTHER INFORMATION CONTACT:
Eldon Taylor, Federal Aviation
Administration, Operations Support
Group, Western Service Area, 1601 Lind
Avenue, SW., Renton, WA 98057;
telephone (425) 203–4537.
SUPPLEMENTARY INFORMATION:
yshivers on PROD1PC62 with RULES
History
On April 11, 2008, the FAA published
in the Federal Register a notice of
proposed rulemaking to revoke
controlled airspace at Luke AFB,
Phoenix, AZ (73 FR 19777). This action
would remove class E airspace and
restrict IFR aircraft from landing at Luke
AFB when the Air Traffic Control tower
is closed. Interested parties were invited
to participate in this rulemaking effort
by submitting written comments on the
proposal to the FAA. No comments
were received.
Class E airspace designations are
published in paragraph 6005 of FAA
Order 7400.9R signed August 15, 2007,
and effective September 15, 2007, which
is incorporated by reference in 14 CFR
part 71.1. The Class E airspace
designations listed in this document
will be published subsequently in that
Order.
VerDate Aug<31>2005
15:43 Jul 18, 2008
Jkt 214001
The Rule
§ 71.1
This action amends Title 14 Code of
Federal Regulations (14 CFR) part 71 by
revoking the Class E airspace area at
Luke AFB, Phoenix, AZ. The USAF is
restricting IFR aircraft landing at Luke
AFB, Phoenix, AZ, when the ATCT is
closed.
The FAA has determined that this
regulation only involves an established
body of technical regulations for which
frequent and routine amendments are
necessary to keep them operationally
current. Therefore, this regulation: (1) Is
not a ‘‘significant regulatory action’’
under Executive Order 12866; (2) is not
a ‘‘significant rule’’ under DOT
Regulatory Policies and Procedures (44
FR 11034; February 26, 1979); and (3)
does not warrant preparation of a
regulatory evaluation as the anticipated
impact is so minimal. Since this is a
routine matter that will only affect air
traffic procedures and air navigation, it
is certified that this rule, when
promulgated, will not have a significant
economic impact on a substantial
number of small entities under the
criteria of the Regulatory Flexibility Act.
The FAAs authority to issue rules
regarding aviation safety is found in
Title 49 of the U.S. Code. Subtitle 1,
Section 106 discusses the authority of
the FAA Administrator. Subtitle VII,
Aviation Programs, describes in more
detail the scope of the agency’s
authority. This rulemaking is
promulgated under the authority
described in Subtitle VII, Part A,
Subpart I, Section 40103. Under that
section, the FAA is charged with
prescribing regulations to assign the use
of airspace necessary to ensure the
safety of aircraft and the efficient use of
airspace. This regulation is within the
scope of that authority as it revokes
controlled airspace at Luke AFB,
Phoenix, AZ.
42263
I
List of Subjects in 14 CFR Part 71
Airspace, Incorporation by reference,
Navigation (air).
Adoption of the Amendment
In consideration of the foregoing, the
Federal Aviation Administration
amends 14 CFR part 71 as follows:
I
PART 71—DESIGNATION OF CLASS A,
B, C, D, AND E AIRSPACE AREAS; AIR
TRAFFIC SERVICE ROUTES; AND
REPORTING POINTS
1. The authority citation for 14 CFR
part 71 continues to read as follows:
I
Authority: 49 U.S.C. 106(g), 40103, 40113,
40120; E. O. 10854, 24 FR 9565, 3 CFR, 1959–
1963 Comp., p. 389.
PO 00000
Frm 00007
Fmt 4700
Sfmt 4700
[Amended]
2. The incorporation by reference in
14 CFR 71.1 of the Federal Aviation
Administration Order 7400.9R, Airspace
Designations and Reporting Points,
signed August 15, 2007, and effective
September 15, 2007, is amended as
follows:
Paragraph 6002 Class E airspace
Designated as Surface Areas.
*
*
*
AWP AZ E2
[Revoked]
*
*
*
*
Phoenix, Luke AFB, AZ
*
*
*
Issued in Seattle, Washington, on July 9,
2008.
Kevin Nolan,
Acting Manager, Operations Support Group,
Western Service Center.
[FR Doc. E8–16517 Filed 7–18–08; 8:45 am]
BILLING CODE 4910–13–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 52
[EPA–R03–OAR–2008–0187; FRL–8694–7]
Approval and Promulgation of Air
Quality Implementation Plans;
Pennsylvania; Section 110(a)(1) 8-Hour
Ozone Maintenance Plan and 2002
Base-Year Inventory for the Pike
County Area
Environmental Protection
Agency (EPA).
ACTION: Final rule.
AGENCY:
SUMMARY: EPA is approving a State
Implementation Plan (SIP) revision
submitted by the Commonwealth of
Pennsylvania. The Pennsylvania
Department of Environmental Protection
(PADEP) submitted a SIP revision
consisting of a maintenance plan that
provides for continued attainment of the
8-hour ozone national ambient air
quality standard (NAAQS) for at least 10
years after the April 30, 2004,
designations, as well as a 2002 base-year
inventory for the Pike County Area. EPA
is approving the maintenance plan and
the 2002 base-year inventory for the
Pike County Area as revisions to the
Pennsylvania SIP in accordance with
the requirements of the Clean Air Act
(CAA).
Effective Date: This final rule is
effective on August 20, 2008.
ADDRESSES: EPA has established a
docket for this action under Docket ID
Number EPA–R03–OAR–2008–0187. All
documents in the docket are listed in
the www.regulations.gov Web site.
DATES:
E:\FR\FM\21JYR1.SGM
21JYR1
42264
Federal Register / Vol. 73, No. 140 / Monday, July 21, 2008 / Rules and Regulations
Although listed in the electronic docket,
some information is not publicly
available, i.e., confidential business
information (CBI) or other information
whose disclosure is restricted by statute.
Certain other material, such as
copyrighted material, is not placed on
the Internet and will be publicly
available only in hard copy form.
Publicly available docket materials are
available either electronically through
www.regulations.gov or in hard copy for
public inspection during normal
business hours at the Air Protection
Division, U.S. Environmental Protection
Agency, Region III, 1650 Arch Street,
Philadelphia, Pennsylvania 19103.
Copies of the State submittal are
available at the Pennsylvania
Department of Environment Protection,
Bureau of Air Quality Control, P.O. Box
8468, 400 Market Street, Harrisburg,
Pennsylvania 17105.
FOR FURTHER INFORMATION CONTACT:
Melissa Linden, (215) 814–2096, or by
e-mail at linden.melissa@epa.gov.
SUPPLEMENTARY INFORMATION:
I. Background
On May 27, 2008 (73 FR 30350), EPA
published a notice of proposed
rulemaking (NPR) for the
Commonwealth of Pennsylvania. The
NPR proposed approval of
Pennsylvania’s SIP revision that
establishes a maintenance plan for the
Pike County Area that provides for
continued attainment of the 8-hour
ozone NAAQS for at least 10 years after
designation, and a 2002 base-year
emissions inventory. The formal SIP
revisions were submitted by PADEP on
December 17, 2007. Other specific
requirements of Pennsylvania’s SIP
revision and the rationales for EPA’s
proposed actions are explained in the
NPR and will not be restated here. No
public comments were received on the
NPR.
II. Final Action
EPA is approving the maintenance
plan and the 2002 base-year inventory
for the Pike County Area, submitted on
December 17, 2007, as revisions to the
Pennsylvania SIP. EPA is approving the
maintenance plan and 2002 base-year
inventory for the Pike County Area
because it meets the requirements of
section 110(a)(1) of the CAA.
yshivers on PROD1PC62 with RULES
III. Statutory and Executive Order
Reviews
A. General Requirements
Under the Clean Air Act, the
Administrator is required to approve a
SIP submission that complies with the
provisions of the Act and applicable
VerDate Aug<31>2005
15:43 Jul 18, 2008
Jkt 214001
Federal regulations. 42 U.S.C. 7410(k);
40 CFR 52.02(a). Thus, in reviewing SIP
submissions, EPA’s role is to approve
state choices, provided that they meet
the criteria of the Clean Air Act.
Accordingly, this action merely
approves state law as meeting Federal
requirements and does not impose
additional requirements beyond those
imposed by state law. For that reason,
this action:
• Is not a ‘‘significant regulatory
action’’ subject to review by the Office
of Management and Budget under
Executive Order 12866 (58 FR 51735,
October 4, 1993);
• Does not impose an information
collection burden under the provisions
of the Paperwork Reduction Act (44
U.S.C. 3501 et seq.);
• Is certified as not having a
significant economic impact on a
substantial number of small entities
under the Regulatory Flexibility Act (5
U.S.C. 601 et seq.);
• Does not contain any unfunded
mandate or significantly or uniquely
affect small governments, as described
in the Unfunded Mandates Reform Act
of 1995 (Pub. L. 104–4);
• Does not have Federalism
implications as specified in Executive
Order 13132 (64 FR 43255, August 10,
1999);
• Is not an economically significant
regulatory action based on health or
safety risks subject to Executive Order
13045 (62 FR 19885, April 23, 1997);
• Is not a significant regulatory action
subject to Executive Order 13211 (66 FR
28355, May 22, 2001);
• Is not subject to requirements of
Section 12(d) of the National
Technology Transfer and Advancement
Act of 1995 (15 U.S.C. 272 note) because
application of those requirements would
be inconsistent with the Clean Air Act;
and
• Does not provide EPA with the
discretionary authority to address, as
appropriate, disproportionate human
health or environmental effects, using
practicable and legally permissible
methods, under Executive Order 12898
(59 FR 7629, February 16, 1994).
In addition, this rule does not have
tribal implications as specified by
Executive Order 13175 (65 FR 67249,
November 9, 2000), because the SIP is
not approved to apply in Indian country
located in the state, and EPA notes that
it will not impose substantial direct
costs on tribal governments or preempt
tribal law.
B. Submission to Congress and the
Comptroller General
The Congressional Review Act, 5
U.S.C. 801 et seq., as added by the Small
PO 00000
Frm 00008
Fmt 4700
Sfmt 4700
Business Regulatory Enforcement
Fairness Act of 1996, generally provides
that before a rule may take effect, the
agency promulgating the rule must
submit a rule report, which includes a
copy of the rule, to each House of the
Congress and to the Comptroller General
of the United States. EPA will submit a
report containing this action and other
required information to the U.S. Senate,
the U.S. House of Representatives, and
the Comptroller General of the United
States prior to publication of the rule in
the Federal Register. A major rule
cannot take effect until 60 days after it
is published in the Federal Register.
This action is not a ‘‘major rule’’ as
defined by 5 U.S.C. 804(2).
C. Petitions for Judicial Review
Under section 307(b)(1) of the Clean
Air Act, petitions for judicial review of
this action must be filed in the United
States Court of Appeals for the
appropriate circuit by September 19,
2008. Filing a petition for
reconsideration by the Administrator of
this final rule does not affect the finality
of this action for the purposes of judicial
review nor does it extend the time
within which a petition for judicial
review may be filed, and shall not
postpone the effectiveness of such rule
or action.
This action approving the
maintenance plan and the 2002 baseyear inventory for the Pike County Area
may not be challenged later in
proceedings to enforce its requirements.
(See section 307(b)(2).)
List of Subjects in 40 CFR Part 52
Environmental protection, Air
pollution control, Incorporation by
reference, Nitrogen dioxide, Ozone,
Reporting and recordkeeping
requirements, Volatile organic
compounds.
Dated: July 10, 2008.
Donald S. Welsh,
Regional Administrator, Region III.
I
40 CFR part 52 is amended as follows:
PART 52—[AMENDED]
1. The authority citation for part 52
continues to read as follows:
I
Authority: 42 U.S.C. 7401 et seq.
Subpart NN—Pennsylvania
2. In § 52.2020, the table in paragraph
(e)(1) is amended by adding an entry for
the 8-Hour Ozone Maintenance Plan
and 2002 Base-Year Inventory for Pike
County at the end of the table to read
as follows:
I
E:\FR\FM\21JYR1.SGM
21JYR1
42265
Federal Register / Vol. 73, No. 140 / Monday, July 21, 2008 / Rules and Regulations
§ 52.2020
Identification of plan.
*
*
*
*
(e) * * *
(1) * * *
*
Name of non-regulatory SIP revision
Applicable geographic
area
*
*
*
8-Hour Ozone Maintenance Plan and 2002 BaseYear Inventory.
*
Pike County ......................
*
*
*
*
*
[FR Doc. E8–16476 Filed 7–18–08; 8:45 am]
BILLING CODE 6560–50–P
DEPARTMENT OF HOMELAND
SECURITY
Federal Emergency Management
Agency
44 CFR Part 65
[Docket No. FEMA–B–7793]
Changes in Flood Elevation
Determinations
Federal Emergency
Management Agency, DHS.
ACTION: Interim rule.
yshivers on PROD1PC62 with RULES
AGENCY:
SUMMARY: This interim rule lists
communities where modification of the
Base (1% annual-chance) Flood
Elevations (BFEs) is appropriate because
of new scientific or technical data. New
flood insurance premium rates will be
calculated from the modified BFEs for
new buildings and their contents.
DATES: These modified BFEs are
currently in effect on the dates listed in
the table below and revise the Flood
Insurance Rate Maps (FIRMs) in effect
prior to this determination for the listed
communities.
From the date of the second
publication of these changes in a
newspaper of local circulation, any
person has ninety (90) days in which to
request through the community that the
Mitigation Assistant Administrator of
FEMA reconsider the changes. The
modified BFEs may be changed during
the 90-day period.
ADDRESSES: The modified BFEs for each
community are available for inspection
at the office of the Chief Executive
Officer of each community. The
VerDate Aug<31>2005
15:43 Jul 18, 2008
Jkt 214001
State submittal
date
*
12/17/07
respective addresses are listed in the
table below.
FOR FURTHER INFORMATION CONTACT:
William R. Blanton, Jr., Engineering
Management Branch, Mitigation
Directorate, Federal Emergency
Management Agency, 500 C Street, SW.,
Washington, DC 20472, (202) 646–3151.
SUPPLEMENTARY INFORMATION: The
modified BFEs are not listed for each
community in this interim rule.
However, the address of the Chief
Executive Officer of the community
where the modified BFE determinations
are available for inspection is provided.
Any request for reconsideration must
be based on knowledge of changed
conditions or new scientific or technical
data.
The modifications are made pursuant
to section 201 of the Flood Disaster
Protection Act of 1973, 42 U.S.C. 4105,
and are in accordance with the National
Flood Insurance Act of 1968, 42 U.S.C.
4001 et seq., and with 44 CFR part 65.
For rating purposes, the currently
effective community number is shown
and must be used for all new policies
and renewals.
The modified BFEs are the basis for
the floodplain management measures
that the community is required to either
adopt or to show evidence of being
already in effect in order to qualify or
to remain qualified for participation in
the National Flood Insurance Program
(NFIP).
These modified BFEs, together with
the floodplain management criteria
required by 44 CFR 60.3, are the
minimum that are required. They
should not be construed to mean that
the community must change any
existing ordinances that are more
stringent in their floodplain
management requirements. The
community may at any time enact
stricter requirements of its own, or
pursuant to policies established by the
other Federal, State, or regional entities.
PO 00000
Frm 00009
Fmt 4700
Sfmt 4700
EPA approval date
*
07/21/08. [Insert page
number where the document begins].
Additional
explanation
*
The changed BFEs are in accordance
with 44 CFR 65.4.
National Environmental Policy Act.
This interim rule is categorically
excluded from the requirements of 44
CFR part 10, Environmental
Consideration. An environmental
impact assessment has not been
prepared.
Regulatory Flexibility Act. As flood
elevation determinations are not within
the scope of the Regulatory Flexibility
Act, 5 U.S.C. 601–612, a regulatory
flexibility analysis is not required.
Regulatory Classification. This
interim rule is not a significant
regulatory action under the criteria of
section 3(f) of Executive Order 12866 of
September 30, 1993, Regulatory
Planning and Review, 58 FR 51735.
Executive Order 13132, Federalism.
This interim rule involves no policies
that have federalism implications under
Executive Order 13132, Federalism.
Executive Order 12988, Civil Justice
Reform. This interim rule meets the
applicable standards of Executive Order
12988.
List of Subjects in 44 CFR Part 65
Flood insurance, Floodplains,
Reporting and recordkeeping
requirements.
Accordingly, 44 CFR part 65 is
amended to read as follows:
I
PART 65—[AMENDED]
1. The authority citation for part 65
continues to read as follows:
I
Authority: 42 U.S.C. 4001 et seq.;
Reorganization Plan No. 3 of 1978, 3 CFR,
1978 Comp., p. 329; E.O. 12127, 44 FR 19367,
3 CFR, 1979 Comp., p. 376.
§ 65.4
[Amended]
2. The tables published under the
authority of § 65.4 are amended as
follows:
I
E:\FR\FM\21JYR1.SGM
21JYR1
Agencies
[Federal Register Volume 73, Number 140 (Monday, July 21, 2008)]
[Rules and Regulations]
[Pages 42263-42265]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-16476]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R03-OAR-2008-0187; FRL-8694-7]
Approval and Promulgation of Air Quality Implementation Plans;
Pennsylvania; Section 110(a)(1) 8-Hour Ozone Maintenance Plan and 2002
Base-Year Inventory for the Pike County Area
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: EPA is approving a State Implementation Plan (SIP) revision
submitted by the Commonwealth of Pennsylvania. The Pennsylvania
Department of Environmental Protection (PADEP) submitted a SIP revision
consisting of a maintenance plan that provides for continued attainment
of the 8-hour ozone national ambient air quality standard (NAAQS) for
at least 10 years after the April 30, 2004, designations, as well as a
2002 base-year inventory for the Pike County Area. EPA is approving the
maintenance plan and the 2002 base-year inventory for the Pike County
Area as revisions to the Pennsylvania SIP in accordance with the
requirements of the Clean Air Act (CAA).
DATES: Effective Date: This final rule is effective on August 20, 2008.
ADDRESSES: EPA has established a docket for this action under Docket ID
Number EPA-R03-OAR-2008-0187. All documents in the docket are listed in
the www.regulations.gov Web site.
[[Page 42264]]
Although listed in the electronic docket, some information is not
publicly available, i.e., confidential business information (CBI) or
other information whose disclosure is restricted by statute. Certain
other material, such as copyrighted material, is not placed on the
Internet and will be publicly available only in hard copy form.
Publicly available docket materials are available either electronically
through www.regulations.gov or in hard copy for public inspection
during normal business hours at the Air Protection Division, U.S.
Environmental Protection Agency, Region III, 1650 Arch Street,
Philadelphia, Pennsylvania 19103. Copies of the State submittal are
available at the Pennsylvania Department of Environment Protection,
Bureau of Air Quality Control, P.O. Box 8468, 400 Market Street,
Harrisburg, Pennsylvania 17105.
FOR FURTHER INFORMATION CONTACT: Melissa Linden, (215) 814-2096, or by
e-mail at linden.melissa@epa.gov.
SUPPLEMENTARY INFORMATION:
I. Background
On May 27, 2008 (73 FR 30350), EPA published a notice of proposed
rulemaking (NPR) for the Commonwealth of Pennsylvania. The NPR proposed
approval of Pennsylvania's SIP revision that establishes a maintenance
plan for the Pike County Area that provides for continued attainment of
the 8-hour ozone NAAQS for at least 10 years after designation, and a
2002 base-year emissions inventory. The formal SIP revisions were
submitted by PADEP on December 17, 2007. Other specific requirements of
Pennsylvania's SIP revision and the rationales for EPA's proposed
actions are explained in the NPR and will not be restated here. No
public comments were received on the NPR.
II. Final Action
EPA is approving the maintenance plan and the 2002 base-year
inventory for the Pike County Area, submitted on December 17, 2007, as
revisions to the Pennsylvania SIP. EPA is approving the maintenance
plan and 2002 base-year inventory for the Pike County Area because it
meets the requirements of section 110(a)(1) of the CAA.
III. Statutory and Executive Order Reviews
A. General Requirements
Under the Clean Air Act, the Administrator is required to approve a
SIP submission that complies with the provisions of the Act and
applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a).
Thus, in reviewing SIP submissions, EPA's role is to approve state
choices, provided that they meet the criteria of the Clean Air Act.
Accordingly, this action merely approves state law as meeting Federal
requirements and does not impose additional requirements beyond those
imposed by state law. For that reason, this action:
Is not a ``significant regulatory action'' subject to
review by the Office of Management and Budget under Executive Order
12866 (58 FR 51735, October 4, 1993);
Does not impose an information collection burden under the
provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
Is certified as not having a significant economic impact
on a substantial number of small entities under the Regulatory
Flexibility Act (5 U.S.C. 601 et seq.);
Does not contain any unfunded mandate or significantly or
uniquely affect small governments, as described in the Unfunded
Mandates Reform Act of 1995 (Pub. L. 104-4);
Does not have Federalism implications as specified in
Executive Order 13132 (64 FR 43255, August 10, 1999);
Is not an economically significant regulatory action based
on health or safety risks subject to Executive Order 13045 (62 FR
19885, April 23, 1997);
Is not a significant regulatory action subject to
Executive Order 13211 (66 FR 28355, May 22, 2001);
Is not subject to requirements of Section 12(d) of the
National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272
note) because application of those requirements would be inconsistent
with the Clean Air Act; and
Does not provide EPA with the discretionary authority to
address, as appropriate, disproportionate human health or environmental
effects, using practicable and legally permissible methods, under
Executive Order 12898 (59 FR 7629, February 16, 1994).
In addition, this rule does not have tribal implications as
specified by Executive Order 13175 (65 FR 67249, November 9, 2000),
because the SIP is not approved to apply in Indian country located in
the state, and EPA notes that it will not impose substantial direct
costs on tribal governments or preempt tribal law.
B. Submission to Congress and the Comptroller General
The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the
Small Business Regulatory Enforcement Fairness Act of 1996, generally
provides that before a rule may take effect, the agency promulgating
the rule must submit a rule report, which includes a copy of the rule,
to each House of the Congress and to the Comptroller General of the
United States. EPA will submit a report containing this action and
other required information to the U.S. Senate, the U.S. House of
Representatives, and the Comptroller General of the United States prior
to publication of the rule in the Federal Register. A major rule cannot
take effect until 60 days after it is published in the Federal
Register. This action is not a ``major rule'' as defined by 5 U.S.C.
804(2).
C. Petitions for Judicial Review
Under section 307(b)(1) of the Clean Air Act, petitions for
judicial review of this action must be filed in the United States Court
of Appeals for the appropriate circuit by September 19, 2008. Filing a
petition for reconsideration by the Administrator of this final rule
does not affect the finality of this action for the purposes of
judicial review nor does it extend the time within which a petition for
judicial review may be filed, and shall not postpone the effectiveness
of such rule or action.
This action approving the maintenance plan and the 2002 base-year
inventory for the Pike County Area may not be challenged later in
proceedings to enforce its requirements. (See section 307(b)(2).)
List of Subjects in 40 CFR Part 52
Environmental protection, Air pollution control, Incorporation by
reference, Nitrogen dioxide, Ozone, Reporting and recordkeeping
requirements, Volatile organic compounds.
Dated: July 10, 2008.
Donald S. Welsh,
Regional Administrator, Region III.
0
40 CFR part 52 is amended as follows:
PART 52--[AMENDED]
0
1. The authority citation for part 52 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
Subpart NN--Pennsylvania
0
2. In Sec. 52.2020, the table in paragraph (e)(1) is amended by adding
an entry for the 8-Hour Ozone Maintenance Plan and 2002 Base-Year
Inventory for Pike County at the end of the table to read as follows:
[[Page 42265]]
Sec. 52.2020 Identification of plan.
* * * * *
(e) * * *
(1) * * *
----------------------------------------------------------------------------------------------------------------
Name of non-regulatory SIP Applicable State Additional
revision geographic area submittal date EPA approval date explanation
----------------------------------------------------------------------------------------------------------------
* * * * * * *
8-Hour Ozone Maintenance Plan Pike County........ 12/17/07 07/21/08. [Insert ....................
and 2002 Base-Year Inventory. page number where
the document
begins].
----------------------------------------------------------------------------------------------------------------
* * * * *
[FR Doc. E8-16476 Filed 7-18-08; 8:45 am]
BILLING CODE 6560-50-P