Crane & Company; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene, 41061-41062 [E8-16300]

Download as PDF mstockstill on PROD1PC66 with NOTICES Federal Register / Vol. 73, No. 138 / Thursday, July 17, 2008 / Notices Transmission Tariff, Sixth Revised Volume 1 etc under ER08–569 et al. Filed Date: 07/03/2008. Accession Number: 20080707–0085. Comment Date: 5 p.m. Eastern Time on Thursday, July 24, 2008. Docket Numbers: ER08–808–001. Applicants: Westar Energy, Inc. Description: Westar Energy, Inc submits the Alternate Pro Forma Sheet 30 in compliance with FERC’s 6/6/08 Order under ER08–808. Filed Date: 07/08/2008. Accession Number: 20080710–0100. Comment Date: 5 p.m. Eastern Time on Tuesday, July 29, 2008. Docket Numbers: ER08–951–001. Applicants: PSEG Energy Resources & Trade LLC. Description: PSEG Energy Resources and Trade, LLC submits an amendment to its 5/13/08 filing of a new rate schedule under ER08–951. Filed Date: 07/08/2008. Accession Number: 20080710–0099. Comment Date: 5 p.m. Eastern Time on Tuesday, July 29, 2008. Docket Numbers: ER08–964–001. Applicants: Outback Power Marketing, Inc. Description: Outback Power Marketing, Inc submits an amendment to its 5/16/08 Notice of Cancellation under ER08–964. Filed Date: 07/01/2008. Accession Number: 20080703–0203. Comment Date: 5 p.m. Eastern Time on Tuesday, July 22, 2008. Docket Numbers: ER08–996–001. Applicants: CBA Endeavors, LLC. Description: CBA Endeavors, LLC submits the amendment to 5/20/08 Petition for Acceptance of Initial Tariff, Waivers and Blanket Authority under ER08–996. Filed Date: 07/07/2008. Accession Number: 20080708–0035. Comment Date: 5 p.m. Eastern Time on Monday, July 28, 2008. Docket Numbers: ER08–1193–000. Applicants: Pacific Gas and Electric Company. Description: Pacific Gas and Electric Company submits the revisions to the Generator Special Facilities Agreement and the Generator Interconnection Agreement between PG&E Geysers Power Company, LLC under ER08– 1193. Filed Date: 07/01/2008. Accession Number: 20080708–0274. Comment Date: 5 p.m. Eastern Time on Tuesday, July 22, 2008. Docket Numbers: ER08–1195–000. Applicants: Red Hills Wind Project LLC. Description: Application for Red Hills Wind Project, LLC for order accepting VerDate Aug<31>2005 21:03 Jul 16, 2008 Jkt 214001 market-based rate tariff, granting authorizations and blanket authority, and waiving certain requirements under ER08–1195. Filed Date: 07/02/2008. Accession Number: 20080707–0004. Comment Date: 5 p.m. Eastern Time on Wednesday, July 23, 2008. Docket Numbers: ER08–1200–000. Applicants: MidAmerican Energy Company. Description: MidAmerican Energy Co submits Notices of Cancellation of agreements with Western Area Power Administration. Filed Date: 07/01/2008. Accession Number: 20080703–0150. Comment Date: 5 p.m. Eastern Time on Tuesday, July 22, 2008. Docket Numbers: ER08–1201–000. Applicants: Southwestern Electric Power Company. Description: Southwestern Electric Power Co submits amendments to an agreement with Tex-La Electric Cooperative, Inc. Filed Date: 07/01/2008. Accession Number: 20080703–0141. Comment Date: 5 p.m. Eastern Time on Tuesday, July 22, 2008. Docket Numbers: ER08–1202–000. Applicants: Huntrise Energy Fund LLC. Description: Huntrise Energy Fund LLC Petition for Acceptance of Initial Rate Schedule, Waivers and Blanket Authority. Filed Date: 07/01/2008. Accession Number: 20080703–0151. Comment Date: 5 p.m. Eastern Time on Tuesday, July 22, 2008. Docket Numbers: ER08–1203–000. Applicants: California Independent System Operator Corporation. Description: California Independent System Operator Corp submits an amendment to the Participation Load Agreement with the California Department of Water Resources. Filed Date: 07/01/2008. Accession Number: 20080703–0142. Comment Date: 5 p.m. Eastern Time on Tuesday, July 22, 2008. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 41061 Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E8–16309 Filed 7–16–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI08–12–000] Crane & Company; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene July 10, 2008. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Declaration of Intention. b. Docket No.: DI08–12–000. c. Date Filed: June 30, 2008. E:\FR\FM\17JYN1.SGM 17JYN1 mstockstill on PROD1PC66 with NOTICES 41062 Federal Register / Vol. 73, No. 138 / Thursday, July 17, 2008 / Notices d. Applicant: Crane & Company. e. Name of Project: Byron Weston Hydroelectric Project. f. Location: The proposed Byron Weston Hydroelectric Project will be located on the East Branch Housatonic River, in Dalton, Berkshire County, Massachusetts. g. Filed Pursuant To: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b). h. Applicant Contact: Chad W. Cox, P.E., CZA GeoEnvironmental, Inc., One Edgewater Drive, Norwood, MA 02446; telephone: (781) 278–5787; Fax: (781) 278–5701; e-mail: https:// www.chad.cox@gza.com. i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 502–8768, or e-mail address: henry.ecton@ferc.gov. j. Deadline for filing comments, protests, and/or motions: August 11, 2008. All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and/or interventions may be filed electronically via the Internet in lieu of paper. Any questions, please contact the Secretary’s Office. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https:// www.ferc.gov under the ‘‘e-Filing link. Please include the docket number (DI08–12–000) on any comments, protests, and/or motions filed. k. Description of Project: The proposed run-of-river Byron Weston Hydropower Project will include: (1) An existing 200-foot-long, 23-foot-high stone-and-masonry-gravity dam, (2) a 6foot-diameter penstock, (3) a 176-kW turbine/generator, located within the Byron Weston No. 2 Mill; and (4) appurtenant facilities. Power generated will be used on-site. When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project’s head or generating capacity, or have otherwise significantly VerDate Aug<31>2005 21:03 Jul 16, 2008 Jkt 214001 modified the project’s pre-1935 design or operation. l. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link, select ‘‘Docket#’’ and follow the instructions. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3372, or TTY, contact (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. E8–16300 Filed 7–16–08; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI08–9–000] Gary E. Hall; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene July 10, 2008. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Declaration of Intention. b. Docket No: DI08–9–000. c. Date Filed: June 17, 2008. d. Applicant: Gary E. Hall. e. Name of Project: Potter Creek Hydroelectric Project. f. Location: The proposed Potter Creek Hydroelectric Project will be located on Potter Creek, near Olney, in Flathead County, Montana, affecting T. 32 N, R. 24 W, sec. 23, Montana Meridian. g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b). h. Applicant Contact: Gary E. Hall, P.O. Box 133, Olney, Montana 59927; telephone: (406) 881–2345; e-mail: www.garius@centurytel.net. i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 502–8768, or e-mail address: henry.ecton@ferc.gov. j. Deadline for filing comments, protests, and/or motions: August 11, 2008. All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and/or interventions may be filed electronically via the Internet in lieu of paper. Any questions, please contact the Secretary’s Office. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https:// www.ferc.gov under the ‘‘e-Filing link. Please include the docket number (DI08–9–000) on any comments, protests, and/or motions filed. k. Description of Project: The proposed Potter Creek Hydropower Project will include: (1) An existing 3foot-high, 50-foot-long dam impounding a .07-acre-foot reservoir; (2) A proposed 100-foot-long, 4-inch-diameter plastic penstock; (3) A proposed powerhouse containing a 50-Watt generator, directing power into a battery; and (4) appurtenant facilities. The proposed project will not be connected to an interstate grid. The project will occupy federal lands. E:\FR\FM\17JYN1.SGM 17JYN1

Agencies

[Federal Register Volume 73, Number 138 (Thursday, July 17, 2008)]
[Notices]
[Pages 41061-41062]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-16300]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. DI08-12-000]


Crane & Company; Notice of Declaration of Intention and 
Soliciting Comments, Protests, and/or Motions To Intervene

July 10, 2008.
    Take notice that the following application has been filed with the 
Commission and is available for public inspection:
    a. Application Type: Declaration of Intention.
    b. Docket No.: DI08-12-000.
    c. Date Filed: June 30, 2008.

[[Page 41062]]

    d. Applicant: Crane & Company.
    e. Name of Project: Byron Weston Hydroelectric Project.
    f. Location: The proposed Byron Weston Hydroelectric Project will 
be located on the East Branch Housatonic River, in Dalton, Berkshire 
County, Massachusetts.
    g. Filed Pursuant To: Section 23(b)(1) of the Federal Power Act, 16 
U.S.C. 817(b).
    h. Applicant Contact: Chad W. Cox, P.E., CZA GeoEnvironmental, 
Inc., One Edgewater Drive, Norwood, MA 02446; telephone: (781) 278-
5787; Fax: (781) 278-5701; e-mail: http:www.chad.cox@gza.com">//www.chad.cox@gza.com.
    i. FERC Contact: Any questions on this notice should be addressed 
to Henry Ecton, (202) 502-8768, or e-mail address: 
henry.ecton@ferc.gov.
    j. Deadline for filing comments, protests, and/or motions: August 
11, 2008.
    All documents (original and eight copies) should be filed with: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426. Comments, protests, and/or 
interventions may be filed electronically via the Internet in lieu of 
paper. Any questions, please contact the Secretary's Office. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
at https://www.ferc.gov under the ``e-Filing link.
    Please include the docket number (DI08-12-000) on any comments, 
protests, and/or motions filed.
    k. Description of Project: The proposed run-of-river Byron Weston 
Hydropower Project will include: (1) An existing 200-foot-long, 23-
foot-high stone-and-masonry-gravity dam, (2) a 6-foot-diameter 
penstock, (3) a 176-kW turbine/generator, located within the Byron 
Weston No. 2 Mill; and (4) appurtenant facilities. Power generated will 
be used on-site.
    When a Declaration of Intention is filed with the Federal Energy 
Regulatory Commission, the Federal Power Act requires the Commission to 
investigate and determine if the interests of interstate or foreign 
commerce would be affected by the project. The Commission also 
determines whether or not the project: (1) Would be located on a 
navigable waterway; (2) would occupy or affect public lands or 
reservations of the United States; (3) would utilize surplus water or 
water power from a government dam; or (4) if applicable, has involved 
or would involve any construction subsequent to 1935 that may have 
increased or would increase the project's head or generating capacity, 
or have otherwise significantly modified the project's pre-1935 design 
or operation.
    l. Locations of the Application: Copies of this filing are on file 
with the Commission and are available for public inspection. This 
filing may be viewed on the Web at https://www.ferc.gov using the 
``eLibrary'' link, select ``Docket'' and follow the 
instructions. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3372, or TTY, 
contact (202) 502-8659.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents--Any filings must 
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', AND/
OR ``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of 
the particular application to which the filing refers. A copy of any 
motion to intervene must also be served upon each representative of the 
Applicant specified in the particular application.
    p. Agency Comments--Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.

Kimberly D. Bose,
Secretary.
[FR Doc. E8-16300 Filed 7-16-08; 8:45 am]
BILLING CODE 6717-01-P