Gary E. Hall; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene, 41062-41063 [E8-16299]
Download as PDF
mstockstill on PROD1PC66 with NOTICES
41062
Federal Register / Vol. 73, No. 138 / Thursday, July 17, 2008 / Notices
d. Applicant: Crane & Company.
e. Name of Project: Byron Weston
Hydroelectric Project.
f. Location: The proposed Byron
Weston Hydroelectric Project will be
located on the East Branch Housatonic
River, in Dalton, Berkshire County,
Massachusetts.
g. Filed Pursuant To: Section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b).
h. Applicant Contact: Chad W. Cox,
P.E., CZA GeoEnvironmental, Inc., One
Edgewater Drive, Norwood, MA 02446;
telephone: (781) 278–5787; Fax: (781)
278–5701; e-mail: https://
www.chad.cox@gza.com.
i. FERC Contact: Any questions on
this notice should be addressed to
Henry Ecton, (202) 502–8768, or e-mail
address: henry.ecton@ferc.gov.
j. Deadline for filing comments,
protests, and/or motions: August 11,
2008.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and/or
interventions may be filed electronically
via the Internet in lieu of paper. Any
questions, please contact the Secretary’s
Office. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site at https://
www.ferc.gov under the ‘‘e-Filing link.
Please include the docket number
(DI08–12–000) on any comments,
protests, and/or motions filed.
k. Description of Project: The
proposed run-of-river Byron Weston
Hydropower Project will include: (1) An
existing 200-foot-long, 23-foot-high
stone-and-masonry-gravity dam, (2) a 6foot-diameter penstock, (3) a 176-kW
turbine/generator, located within the
Byron Weston No. 2 Mill; and (4)
appurtenant facilities. Power generated
will be used on-site.
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the interests of
interstate or foreign commerce would be
affected by the project. The Commission
also determines whether or not the
project: (1) Would be located on a
navigable waterway; (2) would occupy
or affect public lands or reservations of
the United States; (3) would utilize
surplus water or water power from a
government dam; or (4) if applicable,
has involved or would involve any
construction subsequent to 1935 that
may have increased or would increase
the project’s head or generating
capacity, or have otherwise significantly
VerDate Aug<31>2005
21:03 Jul 16, 2008
Jkt 214001
modified the project’s pre-1935 design
or operation.
l. Locations of the Application: Copies
of this filing are on file with the
Commission and are available for public
inspection. This filing may be viewed
on the Web at https://www.ferc.gov using
the ‘‘eLibrary’’ link, select ‘‘Docket#’’
and follow the instructions. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3372, or TTY, contact
(202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR
‘‘MOTIONS TO INTERVENE’’, as
applicable, and the Docket Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16300 Filed 7–16–08; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI08–9–000]
Gary E. Hall; Notice of Declaration of
Intention and Soliciting Comments,
Protests, and/or Motions To Intervene
July 10, 2008.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
b. Docket No: DI08–9–000.
c. Date Filed: June 17, 2008.
d. Applicant: Gary E. Hall.
e. Name of Project: Potter Creek
Hydroelectric Project.
f. Location: The proposed Potter Creek
Hydroelectric Project will be located on
Potter Creek, near Olney, in Flathead
County, Montana, affecting T. 32 N, R.
24 W, sec. 23, Montana Meridian.
g. Filed Pursuant to: Section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b).
h. Applicant Contact: Gary E. Hall,
P.O. Box 133, Olney, Montana 59927;
telephone: (406) 881–2345; e-mail:
www.garius@centurytel.net.
i. FERC Contact: Any questions on
this notice should be addressed to
Henry Ecton, (202) 502–8768, or e-mail
address: henry.ecton@ferc.gov.
j. Deadline for filing comments,
protests, and/or motions: August 11,
2008.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and/or
interventions may be filed electronically
via the Internet in lieu of paper. Any
questions, please contact the Secretary’s
Office. See, 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site at https://
www.ferc.gov under the ‘‘e-Filing link.
Please include the docket number
(DI08–9–000) on any comments,
protests, and/or motions filed.
k. Description of Project: The
proposed Potter Creek Hydropower
Project will include: (1) An existing 3foot-high, 50-foot-long dam impounding
a .07-acre-foot reservoir; (2) A proposed
100-foot-long, 4-inch-diameter plastic
penstock; (3) A proposed powerhouse
containing a 50-Watt generator,
directing power into a battery; and (4)
appurtenant facilities. The proposed
project will not be connected to an
interstate grid. The project will occupy
federal lands.
E:\FR\FM\17JYN1.SGM
17JYN1
mstockstill on PROD1PC66 with NOTICES
Federal Register / Vol. 73, No. 138 / Thursday, July 17, 2008 / Notices
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the interests of
interstate or foreign commerce would be
affected by the project. The Commission
also determines whether or not the
project: (1) Would be located on a
navigable waterway; (2) would occupy
or affect public lands or reservations of
the United States; (3) would utilize
surplus water or water power from a
government dam; or (4) if applicable,
has involved or would involve any
construction subsequent to 1935 that
may have increased or would increase
the project’s head or generating
capacity, or have otherwise significantly
modified the project’s pre-1935 design
or operation.
l. Locations of the Application: Copies
of this filing are on file with the
Commission and are available for public
inspection. This filing may be viewed
on the Web at https://www.ferc.gov using
the ‘‘eLibrary’’ link, select ‘‘Docket#’’
and follow the instructions. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3372, or TTY, contact
(202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR
‘‘MOTIONS TO INTERVENE’’, as
applicable, and the Docket Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
VerDate Aug<31>2005
21:03 Jul 16, 2008
Jkt 214001
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16299 Filed 7–16–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI08–11–000]
HPML LLC; Notice of Declaration of
Intention and Soliciting Comments,
Protests, and/or Motions To Intervene
July 10, 2008.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
b. Docket No.: DI08–11–000.
c. Date Filed: June 23, 2008.
d. Applicant: HPML LLC.
e. Name of Project: Delia Creek
Hydroelectric Project.
f. Location: The proposed Delia Creek
Hydroelectric Project will be located on
Delia Creek, near the towns of Palmer
and Wasilla, Matanuska-Susitna
Borough, Alaska, affecting T. 20 N, R. 1
E, sec. 36, Seward Meridian.
g. Filed Pursuant to: Section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b).
h. Applicant Contact: Jill Reese, P.O.
Box 91187, Anchorage, AK 99509;
telephone: (907) 232–9648; Fax: (907)
745–6004; e-mail:
www.jilreese@gmail.com.
i. FERC Contact: Any questions on
this notice should be addressed to
Henry Ecton, (202) 502–8768, or e-mail
address: henry.ecton@ferc.gov.
j. Deadline for filing comments,
protests, and/or motions: August 11,
2008.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and/or
interventions may be filed electronically
via the Internet in lieu of paper. Any
questions, please contact the Secretary’s
Office. See, 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site at https://
www.ferc.gov under the ‘‘e-Filing’’ link.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
41063
Please include the docket number
(DI08–11–000) on any comments,
protests, and/or motions filed.
k. Description of Project: The
proposed Delia Creek Hydropower
Project will include: (1) A proposed 3foot-high, 12-foot-wide diversion
structure; (2) a buried 10-inch-deep
desander box, directing water into a
2600-foot-long HDPE penstock; (3) a 15foot-long by 15-foot-wide powerhouse
containing a 50-kW turbine and
generator; (4) a tailrace emptying into
the Little Susitna River; and (5)
appurtenant facilities. The proposed
project will not be connected to an
interstate grid, and will not occupy any
tribal or federal lands.
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the interests of
interstate or foreign commerce would be
affected by the project. The Commission
also determines whether or not the
project: (1) Would be located on a
navigable waterway; (2) would occupy
or affect public lands or reservations of
the United States; (3) would utilize
surplus water or water power from a
government dam; or (4) if applicable,
has involved or would involve any
construction subsequent to 1935 that
may have increased or would increase
the project’s head or generating
capacity, or have otherwise significantly
modified the project’s pre-1935 design
or operation.
l. Locations of the Application: Copies
of this filing are on file with the
Commission and are available for public
inspection. This filing may be viewed
on the Web at https://www.ferc.gov using
the ‘‘eLibrary’’ link, select ‘‘Docket#’’
and follow the instructions. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3372, or TTY, contact
(202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
E:\FR\FM\17JYN1.SGM
17JYN1
Agencies
[Federal Register Volume 73, Number 138 (Thursday, July 17, 2008)]
[Notices]
[Pages 41062-41063]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-16299]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. DI08-9-000]
Gary E. Hall; Notice of Declaration of Intention and Soliciting
Comments, Protests, and/or Motions To Intervene
July 10, 2008.
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Declaration of Intention.
b. Docket No: DI08-9-000.
c. Date Filed: June 17, 2008.
d. Applicant: Gary E. Hall.
e. Name of Project: Potter Creek Hydroelectric Project.
f. Location: The proposed Potter Creek Hydroelectric Project will
be located on Potter Creek, near Olney, in Flathead County, Montana,
affecting T. 32 N, R. 24 W, sec. 23, Montana Meridian.
g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16
U.S.C. 817(b).
h. Applicant Contact: Gary E. Hall, P.O. Box 133, Olney, Montana
59927; telephone: (406) 881-2345; e-mail: www.garius@centurytel.net">www.garius@centurytel.net.
i. FERC Contact: Any questions on this notice should be addressed
to Henry Ecton, (202) 502-8768, or e-mail address:
henry.ecton@ferc.gov.
j. Deadline for filing comments, protests, and/or motions: August
11, 2008.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, protests, and/or
interventions may be filed electronically via the Internet in lieu of
paper. Any questions, please contact the Secretary's Office. See, 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov under the ``e-Filing link.
Please include the docket number (DI08-9-000) on any comments,
protests, and/or motions filed.
k. Description of Project: The proposed Potter Creek Hydropower
Project will include: (1) An existing 3-foot-high, 50-foot-long dam
impounding a .07-acre-foot reservoir; (2) A proposed 100-foot-long, 4-
inch-diameter plastic penstock; (3) A proposed powerhouse containing a
50-Watt generator, directing power into a battery; and (4) appurtenant
facilities. The proposed project will not be connected to an interstate
grid. The project will occupy federal lands.
[[Page 41063]]
When a Declaration of Intention is filed with the Federal Energy
Regulatory Commission, the Federal Power Act requires the Commission to
investigate and determine if the interests of interstate or foreign
commerce would be affected by the project. The Commission also
determines whether or not the project: (1) Would be located on a
navigable waterway; (2) would occupy or affect public lands or
reservations of the United States; (3) would utilize surplus water or
water power from a government dam; or (4) if applicable, has involved
or would involve any construction subsequent to 1935 that may have
increased or would increase the project's head or generating capacity,
or have otherwise significantly modified the project's pre-1935 design
or operation.
l. Locations of the Application: Copies of this filing are on file
with the Commission and are available for public inspection. This
filing may be viewed on the Web at https://www.ferc.gov using the
``eLibrary'' link, select ``Docket'' and follow the
instructions. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3372, or TTY,
contact (202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', AND/
OR ``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of
the particular application to which the filing refers. A copy of any
motion to intervene must also be served upon each representative of the
Applicant specified in the particular application.
p. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-16299 Filed 7-16-08; 8:45 am]
BILLING CODE 6717-01-P