Pacific Gas and Electric Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 41067 [E8-16294]
Download as PDF
Federal Register / Vol. 73, No. 138 / Thursday, July 17, 2008 / Notices
to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Kentucky Lock and Dam 14
Project to be located at river mile 249 on
the Kentucky River at Lock and Dam 14
in Lee County, Kentucky. Existing
facilities are owned by the Kentucky
River Authority.
The proposed project would utilize
the existing Lock and Dam 14 owned by
the Kentucky River Authority and
would consist of: (1) A powerhouse
containing 4 turbine generator units
with a total installed capacity of 2.7
MW; (2) a 2,000 foot transmission line;
and; (3) appurtenant facilities. The
annual production would be 11 GWh
which would be sold to a local utility.
Applicant Contact: Mr. David Brown
Kinloch, 414 S. Wenzel Street,
Louisville, KY 40204, (502) 589–0975.
FERC Contact: Steven Sachs, (202)
502–8666.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13213) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
mstockstill on PROD1PC66 with NOTICES
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16296 Filed 7–16–08; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
21:03 Jul 16, 2008
Jkt 214001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13220–000]
Pacific Gas and Electric Company;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comment, Motions To
Intervene, and Competing Applications
July 10, 2008.
On May 7, 2008, Pacific Gas and
Electric Company filed an application,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Kings River Pumped
Storage Project to be located in Fresno
County, California on private and
federal land managed by the U.S. Forest
Service.
The proposed project would consist of
one of the following two possible
designs: (1) (i) A dam in the Lost
Canyon area 200 ft high and 700 ft long;
(ii) a reservoir with a surface elevation
of 7,720 ft and an estimated storage
capacity of 15,695 acre-feet, (iii) an
8,000 foot long power tunnel including
intake structure, penstock, and tailrace;
(2) (i) A dam in the Lower Short Hair
Creek area with a height of 175 ft high
and length of 1,700 ft; (ii) a reservoir
with full pool elevation of 8,245 ft and
storage capacity of 16,290 acre-feet; (iii)
a 14,000 foot long power tunnel
including intake structure, penstock,
and tailrace; (3) the existing Wishon
reservoir, with a surface area of 1,025
acres, storage capacity of 128,639, and a
normal water surface elevation of 6,550
feet, would act as the lower reservoir for
either proposed plan; (4) a powerhouse
with a total installed capacity from 380–
1140 MW; (5) a transmission line
between 2,000 and 5,000 feet long and
of 230 or 500 kV and; (6) appurtenant
facilities. The proposed project would
have an annual production between 304
and 912 GWh.
Applicant Contact: Mr. Randal S.
Livingston, 245 Market Street, N11E–
1137, San Francisco, CA 94105, (415)
973–6950.
FERC Contact: Steven Sachs, (202)
502–8666.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
41067
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13220) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16294 Filed 7–16–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD08–5–000]
Compliance Workshop; Notice of
Comment Period for Workshop on
Regulatory Compliance
July 10, 2008.
As announced at the Workshop on
Regulatory Compliance held July 8,
2008, the Commission is providing the
opportunity for written comments to be
filed in this proceeding until July 22,
2008.
The Commission encourages
electronic submission in lieu of paper
using the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of comments to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16303 Filed 7–16–08; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\17JYN1.SGM
17JYN1
Agencies
[Federal Register Volume 73, Number 138 (Thursday, July 17, 2008)]
[Notices]
[Page 41067]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-16294]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13220-000]
Pacific Gas and Electric Company; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comment, Motions To
Intervene, and Competing Applications
July 10, 2008.
On May 7, 2008, Pacific Gas and Electric Company filed an
application, pursuant to section 4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the Kings River Pumped Storage
Project to be located in Fresno County, California on private and
federal land managed by the U.S. Forest Service.
The proposed project would consist of one of the following two
possible designs: (1) (i) A dam in the Lost Canyon area 200 ft high and
700 ft long; (ii) a reservoir with a surface elevation of 7,720 ft and
an estimated storage capacity of 15,695 acre-feet, (iii) an 8,000 foot
long power tunnel including intake structure, penstock, and tailrace;
(2) (i) A dam in the Lower Short Hair Creek area with a height of 175
ft high and length of 1,700 ft; (ii) a reservoir with full pool
elevation of 8,245 ft and storage capacity of 16,290 acre-feet; (iii) a
14,000 foot long power tunnel including intake structure, penstock, and
tailrace; (3) the existing Wishon reservoir, with a surface area of
1,025 acres, storage capacity of 128,639, and a normal water surface
elevation of 6,550 feet, would act as the lower reservoir for either
proposed plan; (4) a powerhouse with a total installed capacity from
380-1140 MW; (5) a transmission line between 2,000 and 5,000 feet long
and of 230 or 500 kV and; (6) appurtenant facilities. The proposed
project would have an annual production between 304 and 912 GWh.
Applicant Contact: Mr. Randal S. Livingston, 245 Market Street,
N11E-1137, San Francisco, CA 94105, (415) 973-6950.
FERC Contact: Steven Sachs, (202) 502-8666.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
For more information on how to submit these types of filings please
go to the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of the Commission's Web site at http:/
/www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13220) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-16294 Filed 7-16-08; 8:45 am]