Hydro Green Energy, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications, 40863 [E8-16202]
Download as PDF
mstockstill on PROD1PC66 with NOTICES
Federal Register / Vol. 73, No. 137 / Wednesday, July 16, 2008 / Notices
j. Deadline for filing comments,
motions to intervene, and protest:
August 11, 2008.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: The City
Holyoke Gas and Electric (City) is
requesting approval to amend the
project boundary to add 17.37 acres of
land in the Bachelor Brook natural area
and to remove 4.62 acres of project
lands owned by Mount Holyoke College
(College), giving a net increase of 12.75
acres of project lands. Additionally, the
City is seeking Commission approval to
issue a permit to the College to
construct a seasonal gangway and
floating dock on project property. No
fill, excavation or other ground
disturbing activities are proposed. The
proposed facilities would serve the
students and members of the College.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE, Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call (866) 208–3372 or email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
VerDate Aug<31>2005
17:00 Jul 15, 2008
Jkt 214001
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16208 Filed 7–15–08; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Project No. 12879–000]
DEPARTMENT OF ENERGY
Hydro Green Energy, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
July 9, 2008.
On July 24, 2007, Hydro Green
Energy, LLC filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the ‘‘Alaska 31’’ Project,
located in the Kuskokwim River, in
Bethel Borough, Alaska.
Frm 00034
Fmt 4703
Sfmt 4703
The proposed project would consist
of: (1) 5 arrays, each consisting of ten
100 kilowatt hydrokinetic turbine units,
for a total installed capacity of 5
megawatts, (2) a proposed 2000-footlong, 13.6-kilovolt transmission line,
and (3) appurtenant facilities. The
project is estimated to have an annual
generation of 32.872 gigawatthours,
which would be sold to a local utility.
Applicant Contact: Wayne Krouse,
Hydro Green Energy LLC, 5090
Richmond Avenue #390, Houston, TX
77056; phone: 877–556–6566.
FERC Contact: Kelly Houff, 202–502–
6393.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–12879) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16202 Filed 7–15–08; 8:45 am]
DEPARTMENT OF ENERGY
PO 00000
40863
Federal Energy Regulatory
Commission
[Project No. 13161–000]
Hydrodynamics, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comment, Motions To Intervene, and
Competing Applications
July 9, 2008.
On April 1, 2008, Hydrodynamics,
Inc. filed an application, pursuant to
E:\FR\FM\16JYN1.SGM
16JYN1
Agencies
[Federal Register Volume 73, Number 137 (Wednesday, July 16, 2008)]
[Notices]
[Page 40863]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-16202]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12879-000]
Hydro Green Energy, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comment, Motions To Intervene, and
Competing Applications
July 9, 2008.
On July 24, 2007, Hydro Green Energy, LLC filed an application,
pursuant to section 4(f) of the Federal Power Act, proposing to study
the feasibility of the ``Alaska 31'' Project, located in the Kuskokwim
River, in Bethel Borough, Alaska.
The proposed project would consist of: (1) 5 arrays, each
consisting of ten 100 kilowatt hydrokinetic turbine units, for a total
installed capacity of 5 megawatts, (2) a proposed 2000-foot-long, 13.6-
kilovolt transmission line, and (3) appurtenant facilities. The project
is estimated to have an annual generation of 32.872 gigawatthours,
which would be sold to a local utility.
Applicant Contact: Wayne Krouse, Hydro Green Energy LLC, 5090
Richmond Avenue 390, Houston, TX 77056; phone: 877-556-6566.
FERC Contact: Kelly Houff, 202-502-6393.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-
comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of Commission's Web site at https://
www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
12879) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-16202 Filed 7-15-08; 8:45 am]
BILLING CODE 6717-01-P