Public Service Company of Colorado; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 40559-40560 [E8-16049]
Download as PDF
Federal Register / Vol. 73, No. 136 / Tuesday, July 15, 2008 / Notices
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16047 Filed 7–14–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. P–12589–001]
Public Service Company of Colorado;
Notice of Application Tendered for
Filing With the Commission and
Establishing Procedural Schedule for
Licensing and Deadline for
Submission of Final Amendments
July 8, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: P–12589–001.
c. Date Filed: June 25, 2008.
d. Applicant: Public Service Company
of Colorado.
e. Name of Project: Tacoma
Hydroelectric Project.
f. Location: The existing project is
located on Cascade Creek, Little Cascade
Creek and Elbert Creek in La Plata and
San Juan Counties, Colorado. The
Tacoma Project occupies 221 acres of
the San Juan National Forest.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Randy Rhodes,
Public Service Company of Colorado,
4653 Table Mountain Drive, Golden
Colorado 80403; telephone (720) 497–
2123.
i. FERC Contact: David Turner (202)
502–6091 or via e-mail at
david.turner@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. Project Description: The existing
project consists of the following: (1) A
30-foot-long, 10-foot-high concrete
diversion dam on Cascade Creek; (2) a
4,200-foot-long, 10-foot-diameter, semicircular, elevated wooden flume; (3) a
1,400-foot-long, 60-inch-diameter steel
inverted siphon; (4) a 14,500-foot-long,
64-inch-diameter steel pipeline; (5) the
open channel of Little Cascade Creek;
(6) a 0.5-mile-long, 5-foot-deep lake
(Columbine Lake) formed by a small,
partially breached timber dam on Little
Cascade Creek; (7) the open channel of
Little Cascade Creek downstream of
Columbine Lake; (8) the 4-acre Aspaas
Lake; (9) a 274-foot-long, 27-foot-high,
earth-filled Aspaas dam; (10) a 14-footwide, rock-cut open diversion channel
that diverts flow from Aspaas Lake to
Electra Lake; (11) the 800-acre Electra
Lake; (12) a 140-foot-long, 20-foot-high,
rock-filled, timber crib dam (Stagecoach
dam) serving as the spillway for Electra
Lake; (13) a 1,270-foot-long, 62-foothigh, rock-filled dam (Terminal dam),
with an impermeable asphalt membrane
on the upstream face and an asphaltpaved crest; (14) a 429-foot-long, 54inch-diameter steel pipe intake under
the Terminal dam that leads project
flows from Electra Lake to a valve vault;
(15) the valve vault; (16) a 9,590-footlong, 66-inch-diameter welded steel
penstock, with a 12-foot-diameter, 116foot-high surge tank; (17) a bifurcated
penstock structure that diverts flow to a
2,050-foot-long, 30-inch-diameter
welded steel penstock that enters the
powerhouse and a 2,050-foot-long, 54inch diameter welded steel penstock
that branches to a 46-inch diameter pipe
immediately prior to entering the power
house; (18) a 108-foot-long, 64-footwide, steel frame, brick powerhouse
40559
containing three generating units with a
total installed capacity of 8 megawatts
(MW); (19) a 44 kV substation adjacent
to the powerhouse; and (20)
appurtenant facilities. The project is
operated both as a base-load plant and
a peaking plant depending on the time
of the year. The applicant proposes the
following changes to project facilities:
(1) project boundary modifications to
reflect lands needed for project
operations; (2) rehabilitation and
addition of the 6-foot-high Canyon
Creek diversion to supply potable water,
emergency cooling water, and fire
protection; (3) the addition of 4 MW
turbine-generator (Unit 4); and (4)
several recreation and environmental
measures.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202)
502–8659. A copy is also available for
inspection and reproduction at the
address in item (h) above.
m. You may also register online at
https://www.ferc.gov/esubscribenow.htm
to be notified via email of new filings
and issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
n. Procedural Schedule: The
application will be processed according
to the following Hydro Licensing
Schedule. Revisions to the schedule
may be made as appropriate. For
example, issuance of the Ready for
Environmental Analysis Notice is based
on the assumption that there will be no
additional information.
Date
Application Deficiency Determination Letter and Issuance of Additional Information Requests (AIRs) ..........................................
Notice of Acceptance/Notice of Ready for Environmental Analysis ................................................................................................
Filing of Interventions, Recommendations, Terms and Conditions, and Fishway Prescriptions .....................................................
Reply Comments Due ......................................................................................................................................................................
Issuance of Draft EA ........................................................................................................................................................................
Comments on Draft EA Due .............................................................................................................................................................
Filing of Modified Terms and Conditions ..........................................................................................................................................
Issuance of Final EA ........................................................................................................................................................................
mstockstill on PROD1PC66 with NOTICES
Milestone
July 2008.
August 2008.
October 2008.
December 2008.
January 2009.
February 2009.
April 2009.
July 2009.
VerDate Aug<31>2005
15:01 Jul 14, 2008
Jkt 214001
PO 00000
Frm 00081
Fmt 4703
Sfmt 4703
E:\FR\FM\15JYN1.SGM
15JYN1
40560
Federal Register / Vol. 73, No. 136 / Tuesday, July 15, 2008 / Notices
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16049 Filed 7–14–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 459–229]
Union Electric Company, dba
AmerenUE; Notice of Application for
Non-Project Use of Project Lands and
Soliciting Comments, Motions To
Intervene, and Protests
mstockstill on PROD1PC66 with NOTICES
July 9, 2008.
Take notice that Commission
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No: 459–229.
c. Date Filed: June 23, 2008.
d. Applicant: Union Electric
Company, dba AmerenUE.
e. Name of Project: Osage Project.
f. Location: The proposal would be
located at the Bella Sera Condominium
community near mile marker 31.2+0.1
on the Osage Branch of the Lake of the
Ozarks, in Camden County, Missouri.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Jeff Green,
Shoreline Supervisor, Ameren UE, P.O.
Box 993, Lake Ozark, MO 65049, (573)
365–9214.
i. FERC Contact: Any questions on
this notice should be addressed to Isis
Johnson, Telephone (202) 502–6346,
and e-mail: Isis.Johnson@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
August 11, 2008.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Please include the project number (P–
459–229) on any comments or motions
filed. Comments, protests, and
interventions may be filed electronically
via the internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
e-filings.
VerDate Aug<31>2005
15:01 Jul 14, 2008
Jkt 214001
k. Description of Request: Union
Electric Company, dba AmerenUE
(licensee) filed an application seeking
Commission approval to grant
permission to Irongate, LLC dba Bella
Sera Condominiums to install three
multi-slip boat docks on the Osage
Branch of the Lake of the Ozarks. The
three docks would include a total of 35
boat slips to serve the residents of the
Bella Sera Condominium community.
The applicant also proposes to provide
electrical power to the slips. The
proposed facilities would be floated into
place and no dredging, fuel-dispensing,
or sewage pumping facilities are
proposed.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3372 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
PO 00000
Frm 00082
Fmt 4703
Sfmt 4703
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the
‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–16210 Filed 7–14–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13228–000]
Wellesley Rosewood Maynard Mills LP;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comment, Motions To
Intervene, and Competing Applications
July 9, 2008.
On May 19, 2008, Wellesley
Rosewood Maynard Mills LP filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Clock Tower
Place Hydroelectric Project, to be
located on the Assabet River in the
Maynard area of Middlesex County,
Massachusetts.
The proposed project would consist
of: (1) Two existing dams, the larger
constructed of dry-laid, cut granite
blocks, 9.5-foot-high and 170-foot-long
and the smaller a masonry-faced
embankment structure, respectively, for
the upper and lower reservoirs which
would have water surface elevations of
177 and 176 feet, MSL, a (2) proposed
powerhouse containing one generating
unit having a total installed capacity of
290 kilowatts, a (3) proposed 49-footlong penstock and twin 300-foot-long
tailrace tunnels, a (4) 1,600-foot-long
power canal leading to the gatehouse,
(5) incorporation of an existing
transformer to interconnect equipment
with Clock Tower Place at 208y/120
volts, and (5) appurtenant facilities. The
project would have an annual energy
generation of 1,241,000 kWh per year.
Applicant Contact: Mr. Robert
Buonato, President, Wellesley
Rosewood Maynard Mills LLC, 12 Clock
Tower Place, Suite 200, Maynard, MA
01754; phone: 978–823–8224. FERC
Contact: Alyssa Dorval, 202–502–6735.
E:\FR\FM\15JYN1.SGM
15JYN1
Agencies
[Federal Register Volume 73, Number 136 (Tuesday, July 15, 2008)]
[Notices]
[Pages 40559-40560]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-16049]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. P-12589-001]
Public Service Company of Colorado; Notice of Application
Tendered for Filing With the Commission and Establishing Procedural
Schedule for Licensing and Deadline for Submission of Final Amendments
July 8, 2008.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: P-12589-001.
c. Date Filed: June 25, 2008.
d. Applicant: Public Service Company of Colorado.
e. Name of Project: Tacoma Hydroelectric Project.
f. Location: The existing project is located on Cascade Creek,
Little Cascade Creek and Elbert Creek in La Plata and San Juan
Counties, Colorado. The Tacoma Project occupies 221 acres of the San
Juan National Forest.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Randy Rhodes, Public Service Company of
Colorado, 4653 Table Mountain Drive, Golden Colorado 80403; telephone
(720) 497-2123.
i. FERC Contact: David Turner (202) 502-6091 or via e-mail at
david.turner@ferc.gov.
j. This application is not ready for environmental analysis at this
time.
k. Project Description: The existing project consists of the
following: (1) A 30-foot-long, 10-foot-high concrete diversion dam on
Cascade Creek; (2) a 4,200-foot-long, 10-foot-diameter, semi-circular,
elevated wooden flume; (3) a 1,400-foot-long, 60-inch-diameter steel
inverted siphon; (4) a 14,500-foot-long, 64-inch-diameter steel
pipeline; (5) the open channel of Little Cascade Creek; (6) a 0.5-mile-
long, 5-foot-deep lake (Columbine Lake) formed by a small, partially
breached timber dam on Little Cascade Creek; (7) the open channel of
Little Cascade Creek downstream of Columbine Lake; (8) the 4-acre
Aspaas Lake; (9) a 274-foot-long, 27-foot-high, earth-filled Aspaas
dam; (10) a 14-foot-wide, rock-cut open diversion channel that diverts
flow from Aspaas Lake to Electra Lake; (11) the 800-acre Electra Lake;
(12) a 140-foot-long, 20-foot-high, rock-filled, timber crib dam
(Stagecoach dam) serving as the spillway for Electra Lake; (13) a
1,270-foot-long, 62-foot-high, rock-filled dam (Terminal dam), with an
impermeable asphalt membrane on the upstream face and an asphalt-paved
crest; (14) a 429-foot-long, 54-inch-diameter steel pipe intake under
the Terminal dam that leads project flows from Electra Lake to a valve
vault; (15) the valve vault; (16) a 9,590-foot-long, 66-inch-diameter
welded steel penstock, with a 12-foot-diameter, 116-foot-high surge
tank; (17) a bifurcated penstock structure that diverts flow to a
2,050-foot-long, 30-inch-diameter welded steel penstock that enters the
powerhouse and a 2,050-foot-long, 54-inch diameter welded steel
penstock that branches to a 46-inch diameter pipe immediately prior to
entering the power house; (18) a 108-foot-long, 64-foot-wide, steel
frame, brick powerhouse containing three generating units with a total
installed capacity of 8 megawatts (MW); (19) a 44 kV substation
adjacent to the powerhouse; and (20) appurtenant facilities. The
project is operated both as a base-load plant and a peaking plant
depending on the time of the year. The applicant proposes the following
changes to project facilities: (1) project boundary modifications to
reflect lands needed for project operations; (2) rehabilitation and
addition of the 6-foot-high Canyon Creek diversion to supply potable
water, emergency cooling water, and fire protection; (3) the addition
of 4 MW turbine-generator (Unit 4); and (4) several recreation and
environmental measures.
l. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or toll-free at (866) 208-3676, or for TTY, (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. You may also register online at https://www.ferc.gov/
esubscribenow.htm to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural Schedule: The application will be processed according
to the following Hydro Licensing Schedule. Revisions to the schedule
may be made as appropriate. For example, issuance of the Ready for
Environmental Analysis Notice is based on the assumption that there
will be no additional information.
------------------------------------------------------------------------
Milestone Date
------------------------------------------------------------------------
Application Deficiency Determination Letter July 2008.
and Issuance of Additional Information
Requests (AIRs).
Notice of Acceptance/Notice of Ready for August 2008.
Environmental Analysis.
Filing of Interventions, Recommendations, October 2008.
Terms and Conditions, and Fishway
Prescriptions.
Reply Comments Due........................... December 2008.
Issuance of Draft EA......................... January 2009.
Comments on Draft EA Due..................... February 2009.
Filing of Modified Terms and Conditions...... April 2009.
Issuance of Final EA......................... July 2009.
------------------------------------------------------------------------
[[Page 40560]]
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-16049 Filed 7-14-08; 8:45 am]
BILLING CODE 6717-01-P