Download as PDF Federal Register / Vol. 73, No. 135 / Monday, July 14, 2008 / Notices Underground Outlet (Code 620)— Considerable editing to the standard is being proposed: (a) To add clarity and readability, every section of the standard has been rewritten. However, the underlying design requirements contained in the ‘‘Criteria’’ section have not been significantly modified from the current version of the standard. Water and Sediment Control Basin (Code 638)—Considerable editing to the standard is being proposed: (a) Every section of the standard has been rewritten to add clarity and readability. However, the underlying design requirements contained in the ‘‘Criteria’’ section have not been significantly modified from the current version of the standard. (b) The ‘‘Considerations,’’ ‘‘Plans and Specifications,’’ and ‘‘Operations and Maintenance’’ sections have been significantly expanded. Section 343 of the Federal Agriculture Improvement and Reform Act of 1996 requires NRCS to make available for public review and comment all proposed revisions to conservation practice standards used to carry out the highly erodible land and wetland provisions of the law. For the next 30 days, NRCS will receive comments relative to the proposed changes. Following that period, a determination will be made by NRCS regarding disposition of those comments, and a final determination of changes will be made. Signed in Washington, DC, on July 2, 2008. Arlen L. Lancaster, Chief, Natural Resources Conservation Service. [FR Doc. E8–16024 Filed 7–11–08; 8:45 am] BILLING CODE 3410–16–P DEPARTMENT OF AGRICULTURE Rural Utilities Service Brazos Electric Power Cooperative, Inc.: Notice of Availability of an Environmental Assessment Rural Utilities Service, USDA. Notice of Availability of an Environmental Assessment. AGENCY: pwalker on PROD1PC71 with NOTICES ACTION: SUMMARY: Notice is hereby given that the Rural Utilities Service, an agency delivering the United States Department of Agriculture (USDA) Rural Development Utilities Programs, hereinafter referred to as Rural Development and/or the Agency, is issuing an Environmental Assessment (EA) in connection with possible impacts related to the construction and VerDate Aug<31>2005 17:08 Jul 11, 2008 Jkt 214001 operation of a second 500 megawatt combined-cycle combustion turbine generation unit at Brazos Electric Power Cooperative’s (Brazos) existing Jack County Plant Site, as proposed by Brazos, of Waco, Texas. DATES: Written questions and comments on this notice must be received on or before July 14, 2008. ADDRESSES: To obtain copies of the EA, or for further information, contact: Dennis E. Rankin, Environmental Protection Specialist, USDA Rural Development Utilities Programs, Engineering and Environmental Staff, Stop 1571, 1400 Independence Avenue, SW., Washington, DC 20250–1571, or email: drankin@wdc.usda.gov; Rob Reid, Project Director, PBS&J, 206 Wild Basin Road, Suite 300, Austin, Texas 78746– 8342, telephone: (512) 329–8342 or email: rreid@pbsj.com; or David McDaniel, Brazos, 2404 LaSalle Avenue, Waco, Texas 76702–2585, telephone: (254) 750–6324 or e-mail: dmcdaniel@brazoselectric.com. The EA can be reviewed online at the Agency’s Web site: https://www.usda.gov/rus/ water/ees/ea/htm and at the following locations: USDA, Rural Development Utilities Programs, 1400 Independence Avenue, Room 2244, Washington, DC 20250; Brazos Electric Power Cooperative, 2404 La Salle Avenue, Waco, TX 76702; Wise Electric Cooperative, Corner of Hale & Cowan Streets, Decatur, TX 76234; Gladys Johnson Ritchie Public Library, 620 West College Street, Jacksboro, TX 76458; Bridgeport Public Library, 2159 Tenth Street, Bridgeport TX 76426. SUPPLEMENTARY INFORMATION: Brazos is proposing to construct a second 500 MW gas-fired combined-cycle electric generation unit at its existing Jack County Plant Site on Henderson Ranch Road near the Joplin Community in Jack County, Texas. The project will consist of two combustion turbines and heat recovery steam generators and one steam turbine with a water-cooled steam surface condenser. PBS&J, an environmental consultant, prepared an EA for Rural Development that describes the project and assesses the proposed plant’s environmental impacts. The Agency has conducted an independent evaluation of the EA and believes that it accurately assesses the impacts of the proposed project. No significant impacts are expected as a result of the construction of the project. The EA is available for public review at addresses provided above in the Notice. PO 00000 Frm 00003 Fmt 4703 Sfmt 4703 40285 Any final action by Rural Development related to the proposed project will be subject to, and contingent upon, compliance with all relevant Federal environmental laws and regulations and completion of environmental review procedures as prescribed by the 7 CFR part 1794, Environmental Policies and Procedures. Dated: July 8, 2008. Mark S. Plank, Director, Engineering and Environmental Staff, USDA/Rural Development Utilities Programs. [FR Doc. E8–15915 Filed 7–11–08; 8:45 am] BILLING CODE 3410–15–P DEPARTMENT OF COMMERCE International Trade Administration [A–570–868] Folding Metal Tables and Chairs from the People’s Republic of China: Preliminary Results of Antidumping Duty Administrative Review and Intent to Revoke in Part Import Administration, International Trade Administration, Department of Commerce. SUMMARY: The Department of Commerce (‘‘the Department’’) is conducting an administrative review of the antidumping duty order on folding metal tables and chairs (‘‘FMTCs’’) from the People’s Republic of China (‘‘PRC’’) covering the period June 1, 2006, through May 31, 2007. We have preliminarily determined that Feili Furniture Development Limited Quanzhou City, Feili Furniture Development Co., Ltd., Feili Group (Fujian) Co., Ltd., and Feili (Fujian) Co., Ltd. (collectively ‘‘Feili’’) and Dongguan Shichang Metals Factory Co., Ltd. (‘‘Shichang’’), did not make sales below normal value (‘‘NV’’) during the period of review (‘‘POR’’). If these preliminary results are adopted in our final results of this review, we will instruct U.S. Customs and Border Protection (‘‘CBP’’) to assess antidumping duties on all appropriate entries of subject merchandise during the POR. We invite interested parties to comment on these preliminary results. We intend to issue the final results no later than 120 days from the date of publication of this notice, pursuant to section 751(a)(3)(A) of the Tariff Act of 1930, as amended (‘‘the Act’’). EFFECTIVE DATE: July 14, 2008. FOR FURTHER INFORMATION CONTACT: Lilit Astvatsatrian or Charles Riggle, AD/CVD Operations, Office 8, Import Administration, International Trade AGENCY: E:\FR\FM\14JYN1.SGM 14JYN1

Agencies

[Federal Register Volume 73, Number 135 (Monday, July 14, 2008)]
[Notices]
[Page 40285]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-15915]


-----------------------------------------------------------------------

DEPARTMENT OF AGRICULTURE

Rural Utilities Service


Brazos Electric Power Cooperative, Inc.: Notice of Availability 
of an Environmental Assessment

AGENCY: Rural Utilities Service, USDA.

ACTION: Notice of Availability of an Environmental Assessment.

-----------------------------------------------------------------------

SUMMARY: Notice is hereby given that the Rural Utilities Service, an 
agency delivering the United States Department of Agriculture (USDA) 
Rural Development Utilities Programs, hereinafter referred to as Rural 
Development and/or the Agency, is issuing an Environmental Assessment 
(EA) in connection with possible impacts related to the construction 
and operation of a second 500 megawatt combined-cycle combustion 
turbine generation unit at Brazos Electric Power Cooperative's (Brazos) 
existing Jack County Plant Site, as proposed by Brazos, of Waco, Texas.

DATES: Written questions and comments on this notice must be received 
on or before July 14, 2008.

ADDRESSES: To obtain copies of the EA, or for further information, 
contact: Dennis E. Rankin, Environmental Protection Specialist, USDA 
Rural Development Utilities Programs, Engineering and Environmental 
Staff, Stop 1571, 1400 Independence Avenue, SW., Washington, DC 20250-
1571, or e-mail: drankin@wdc.usda.gov; Rob Reid, Project Director, 
PBS&J, 206 Wild Basin Road, Suite 300, Austin, Texas 78746-8342, 
telephone: (512) 329-8342 or e-mail: rreid@pbsj.com; or David McDaniel, 
Brazos, 2404 LaSalle Avenue, Waco, Texas 76702-2585, telephone: (254) 
750-6324 or e-mail: dmcdaniel@brazoselectric.com. The EA can be 
reviewed online at the Agency's Web site: https://www.usda.gov/rus/
water/ees/ea/htm and at the following locations:

USDA, Rural Development Utilities Programs, 1400 Independence Avenue, 
Room 2244, Washington, DC 20250;
Brazos Electric Power Cooperative, 2404 La Salle Avenue, Waco, TX 
76702;
Wise Electric Cooperative, Corner of Hale & Cowan Streets, Decatur, TX 
76234;
Gladys Johnson Ritchie Public Library, 620 West College Street, 
Jacksboro, TX 76458;
Bridgeport Public Library, 2159 Tenth Street, Bridgeport TX 76426.

SUPPLEMENTARY INFORMATION: Brazos is proposing to construct a second 
500 MW gas-fired combined-cycle electric generation unit at its 
existing Jack County Plant Site on Henderson Ranch Road near the Joplin 
Community in Jack County, Texas. The project will consist of two 
combustion turbines and heat recovery steam generators and one steam 
turbine with a water-cooled steam surface condenser.
    PBS&J, an environmental consultant, prepared an EA for Rural 
Development that describes the project and assesses the proposed 
plant's environmental impacts. The Agency has conducted an independent 
evaluation of the EA and believes that it accurately assesses the 
impacts of the proposed project. No significant impacts are expected as 
a result of the construction of the project. The EA is available for 
public review at addresses provided above in the Notice.
    Any final action by Rural Development related to the proposed 
project will be subject to, and contingent upon, compliance with all 
relevant Federal environmental laws and regulations and completion of 
environmental review procedures as prescribed by the 7 CFR part 1794, 
Environmental Policies and Procedures.

    Dated: July 8, 2008.
Mark S. Plank,
Director, Engineering and Environmental Staff, USDA/Rural Development 
Utilities Programs.
[FR Doc. E8-15915 Filed 7-11-08; 8:45 am]
BILLING CODE 3410-15-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.