Federal Acquisition Regulation; Information Collection; Material and Workmanship, 39284 [E8-15505]
Download as PDF
jlentini on PROD1PC65 with NOTICES
39284
Federal Register / Vol. 73, No. 132 / Wednesday, July 9, 2008 / Notices
Council address: Gulf of Mexico
Fishery Management Council, 2203
North Lois Avenue, Suite 1100, Tampa,
FL 33607.
FOR FURTHER INFORMATION CONTACT:
Steven Atran, Population Dynamics
Statistician; Gulf of Mexico Fishery
Management Council; telephone: (813)
348–1630.
SUPPLEMENTARY INFORMATION: The Reef
Fish AP will review and comment on
two draft amendments to the Reef Fish
Fishery Management Plan. Amendment
29 proposes to rationalize effort and
reduce overcapacity in the commercial
grouper and tilefish fisheries in order to
achieve and maintain optimum yield
(OY). Effort management approaches
considered in this amendment include:
• Permit endorsements
• Implementation of an Individual
Fishing Quota (IFQ) Program
Amendment 30B contains alternatives
that propose to:
• Set management thresholds and
targets for gag
• Set total allowable catch (TAC) for
gag and red grouper
• Set commercial and recreational
allocations for gag and red grouper
• Establish accountability measures
for gag and red grouper
• Adjust commercial quotas for gag
red grouper and the shallow-water
grouper aggregate
• Adjust recreational management
measures for groupers, which includes:
a. bag limits
b. size limits
c. closed seasons
• Address bycatch and bycatch
mortality of groupers
• Create new area closures and/or
extend the duration of existing closed
areas
• Address regulatory compliance of
federally permitted reef fish vessels
when fishing in state waters
Copies of the agendas and other
related materials can be obtained by
calling (813) 348–1630.
Although other non-emergency issues
not on the agendas may come before the
AP for discussion, in accordance with
the Magnuson-Stevens Fishery
Conservation and Management Act
(Magnuson-Stevens Act), those issues
may not be the subject of formal action
during these meetings. Actions of the
SSC will be restricted to those issues
specifically identified in the agendas
and any issues arising after publication
of this notice that require emergency
action under Section 305(c) of the
Magnuson-Stevens Act, provided the
public has been notified of the Council’s
intent to take action to address the
emergency.
VerDate Aug<31>2005
16:15 Jul 08, 2008
Jkt 214001
Special Accommodations
These meetings are physically
accessible to people with disabilities.
Requests for sign language
interpretation or other auxiliary aids
should be directed to Tina O’Hern at the
Council (see ADDRESSES) at least 5
working days prior to the meeting.
ADDRESSES:
Dated: July 3, 2008.
Tracey L. Thompson,
Acting Director, Office of Sustainable
Fisheries, National Marine Fisheries Service.
[FR Doc. E8–15589 Filed 7–8–08; 8:45 am]
FOR FURTHER INFORMATION CONTACT:
Cecelia Davis, Contract Policy Division,
GSA (202) 219–0202.
BILLING CODE 3510–22–S
A. Purpose
DEPARTMENT OF DEFENSE
GENERAL SERVICES
ADMINISTRATION
NATIONAL AERONAUTICS AND
SPACE ADMINISTRATION
[OMB Control No. 9000–0062]
Federal Acquisition Regulation;
Information Collection; Material and
Workmanship
AGENCIES: Department of Defense (DOD),
General Services Administration (GSA),
and National Aeronautics and Space
Administration (NASA).
ACTION: Notice of request for public
comments regarding an extension to an
existing OMB clearance.
Under the provisions of the
Paperwork Reduction Act of 1995 (44
U.S.C. Chapter 35), the Federal
Acquisition Regulation (FAR)
Secretariat will be submitting to the
Office of Management and Budget
(OMB) a request to review and approve
an extension of a currently approved
information collection requirement
concerning material and workmanship.
The clearance currently expires on
August 31, 2008.
Public comments are particularly
invited on: Whether this collection of
information is necessary for the proper
performance of functions of the FAR,
and whether it will have practical
utility; whether our estimate of the
public burden of this collection of
information is accurate, and based on
valid assumptions and methodology;
ways to enhance the quality, utility, and
clarity of the information to be
collected; and ways in which we can
minimize the burden of the collection of
information on those who are to
respond, through the use of appropriate
technological collection techniques or
other forms of information technology.
DATES: Submit comments on or before
September 8, 2008.
SUMMARY:
PO 00000
Frm 00007
Fmt 4703
Sfmt 4703
Submit comments regarding
this burden estimate or any other aspect
of this collection of information,
including suggestions for reducing this
burden to the General Services
Administration, FAR Secretariat (VPR),
1800 F Street, NW., Room 4041,
Washington, DC 20405.
SUPPLEMENTARY INFORMATION:
Under Federal contracts requiring that
equipment (e.g., pumps, fans,
generators, chillers, etc.) be installed in
a project, the Government must
determine that the equipment meets the
contract requirements. Therefore, the
contractor must submit sufficient data
on the particular equipment to allow the
Government to analyze the item.
The Government uses the submitted
data to determine whether or not the
equipment meets the contract
requirements in the categories of
performance, construction, and
durability. This data is placed in the
contract file and used during the
inspection of the equipment when it
arrives on the project and when it is
made operable.
B. Annual Reporting Burden
Respondents: 3,160.
Responses Per Respondent: 1.5.
Annual Responses: 4,740.
Hours Per Response: .25.
Total Burden Hours: 1,185.
OBTAINING COPIES OF
PROPOSALS: Requesters may obtain a
copy of the information collection
documents from the General Services
Administration, FAR Secretariat (VPR),
Room 4041, 1800 F Street, NW.,
Washington, DC 20405, telephone (202)
501–4755. Please cite OMB Control No.
9000–0062, Material and Workmanship,
in all correspondence.
Dated: July, 1, 2008.
Al Matera,
Director, Office of Acquisition Policy.
[FR Doc. E8–15505 Filed 7–8–08; 8:45 am]
BILLING CODE 6820–EP–S
E:\FR\FM\09JYN1.SGM
09JYN1
Agencies
[Federal Register Volume 73, Number 132 (Wednesday, July 9, 2008)]
[Notices]
[Page 39284]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-15505]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
GENERAL SERVICES ADMINISTRATION
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
[OMB Control No. 9000-0062]
Federal Acquisition Regulation; Information Collection; Material
and Workmanship
AGENCIES: Department of Defense (DOD), General Services Administration
(GSA), and National Aeronautics and Space Administration (NASA).
ACTION: Notice of request for public comments regarding an extension to
an existing OMB clearance.
-----------------------------------------------------------------------
SUMMARY: Under the provisions of the Paperwork Reduction Act of 1995
(44 U.S.C. Chapter 35), the Federal Acquisition Regulation (FAR)
Secretariat will be submitting to the Office of Management and Budget
(OMB) a request to review and approve an extension of a currently
approved information collection requirement concerning material and
workmanship. The clearance currently expires on August 31, 2008.
Public comments are particularly invited on: Whether this
collection of information is necessary for the proper performance of
functions of the FAR, and whether it will have practical utility;
whether our estimate of the public burden of this collection of
information is accurate, and based on valid assumptions and
methodology; ways to enhance the quality, utility, and clarity of the
information to be collected; and ways in which we can minimize the
burden of the collection of information on those who are to respond,
through the use of appropriate technological collection techniques or
other forms of information technology.
DATES: Submit comments on or before September 8, 2008.
ADDRESSES: Submit comments regarding this burden estimate or any other
aspect of this collection of information, including suggestions for
reducing this burden to the General Services Administration, FAR
Secretariat (VPR), 1800 F Street, NW., Room 4041, Washington, DC 20405.
FOR FURTHER INFORMATION CONTACT: Cecelia Davis, Contract Policy
Division, GSA (202) 219-0202.
SUPPLEMENTARY INFORMATION:
A. Purpose
Under Federal contracts requiring that equipment (e.g., pumps,
fans, generators, chillers, etc.) be installed in a project, the
Government must determine that the equipment meets the contract
requirements. Therefore, the contractor must submit sufficient data on
the particular equipment to allow the Government to analyze the item.
The Government uses the submitted data to determine whether or not
the equipment meets the contract requirements in the categories of
performance, construction, and durability. This data is placed in the
contract file and used during the inspection of the equipment when it
arrives on the project and when it is made operable.
B. Annual Reporting Burden
Respondents: 3,160.
Responses Per Respondent: 1.5.
Annual Responses: 4,740.
Hours Per Response: .25.
Total Burden Hours: 1,185.
OBTAINING COPIES OF PROPOSALS: Requesters may obtain a copy of the
information collection documents from the General Services
Administration, FAR Secretariat (VPR), Room 4041, 1800 F Street, NW.,
Washington, DC 20405, telephone (202) 501-4755. Please cite OMB Control
No. 9000-0062, Material and Workmanship, in all correspondence.
Dated: July, 1, 2008.
Al Matera,
Director, Office of Acquisition Policy.
[FR Doc. E8-15505 Filed 7-8-08; 8:45 am]
BILLING CODE 6820-EP-S