Federal Register / Vol. 73, No. 129 / Thursday, July 3, 2008 / Notices
dockets(s). For assistance with any
FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–15092 Filed 7–2–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–427–000]
Florida Gas Transmission Company,
LLC; Notice of Request Under Blanket
Authorization
mstockstill on PROD1PC66 with NOTICES
June 25, 2008.
Take notice that on June 18, 2008,
Florida Gas Transmission Company,
LLC (FGT), 5444 Westheimer Road,
Houston, Texas 77056, filed in Docket
No. CP08–427–000, a prior notice
request pursuant to sections 157.205
and 157.212 of the Federal Energy
Regulatory Commission’s regulations
under the Natural Gas Act for
authorization to construct, own, and
operate an interconnect with Golden
Pass Pipeline LP (GPPL), located in
Orange County, Texas, to receive
revaporized liquefied natural gas (LNG),
all as more fully set forth in the
application, which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Specifically, FGT proposes the
installation of a 12-inch tap and valve,
approximately 40 feet of 16-inch
diameter connecting pipe, electronic
flow measurement equipment, a gas
chromatograph, and an instrument and
electrical building (GPPL Interconnect).
FGT estimates the cost of construction
to be $484,065. FGT states that the
proposed GPPL Meter Station will be
designed and constructed for flow
capability of up to 250 MMcf/d. FGT
asserts that the new GPPL Interconnect
will provide FGT with the ability to
receive revaporized LNG from the
Golden Pass LNG terminal, through the
GPPL pipeline.
Any questions regarding the
application should be directed to
VerDate Aug<31>2005
16:46 Jul 02, 2008
Jkt 214001
Stephen Veatch, Senior Director of
Certificates & Tariffs, Florida Gas
Transmission Company, LLC, 5444
Westheimer Road, Houston, Texas
77056, at (713) 989–2024, fax (713) 989–
1158, or by e-mail
stephen.veatch@SUG.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205)
file a protest to the request. If no protest
is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–15090 Filed 7–2–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings # 1
June 26, 2008.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER99–2369–005.
Applicants: Alliance for Cooperative
Energy Services.
Description: The Alliance for
Cooperative Energy Services Power
Marketing, LLC submits an Updated
Market Analysis and Request for
Category 1 Status.
Filed Date: 06/23/2008.
Accession Number: 20080625–0052.
Comment Date: 5 p.m. Eastern Time
on Monday, July 14, 2008.
Docket Numbers: ER01–1011–016;
ER01–1335–014; ER01–642–012; ER07–
312–004.
Applicants: Redbud Energy LP;
Magnolia Energy LP; CottonWood
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
38193
Energy Company LP; Dogwood Energy
LLC.
Description: Cottonwood Energy Co,
LP et al submits Second Revised Sheet
1 et al to FERC Electric Tariff, First
Revised Volume 1.
Filed Date: 06/23/2008.
Accession Number: 20080625–0051.
Comment Date: 5 p.m. Eastern Time
on Monday, July 14, 2008.
Docket Numbers: ER02–2339–003;
ER08–274–003.
Applicants: Citadel Energy Products
LLC; Citadel Energy Strategies, LLC.
Description: Citadel Energy Products,
LLC and Citadel Energy Strategies, LLC
submits an updated market power
analysis and rate schedule revisions
required by Order 697 and 697–A.
Filed Date: 06/23/2008.
Accession Number: 20080624–0027.
Comment Date: 5 p.m. Eastern Time
on Monday, July 14, 2008.
Docket Numbers: ER08–1153–000;
ER08–1154–000; ER08–1155–000; ER08–
1156–000; ER08–1157–000; ER08–1158–
000.
Applicants: Bayonne Plant Holding,
L.L.C.; Camden Plant Holding, L.L.C.;
Dartmouth Power Associates Limited
Partnership; Lowell Cogeneration
Company Limited Part; Newark Bay
Cogeneration Partnership, L.P; York
Generation Company LLC.
Description: Bayonne Plant Holdings,
LLC et al submits request to amend
market-based rate tariffs to permit sales
of ancillary services.
Filed Date: 06/23/2008.
Accession Number: 20080625–0048.
Comment Date: 5 p.m. Eastern Time
on Monday, July 14, 2008.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
E:\FR\FM\03JYN1.SGM
03JYN1
Agencies
[Federal Register Volume 73, Number 129 (Thursday, July 3, 2008)]
[Notices]
[Page 38193]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-15090]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP08-427-000]
Florida Gas Transmission Company, LLC; Notice of Request Under
Blanket Authorization
June 25, 2008.
Take notice that on June 18, 2008, Florida Gas Transmission
Company, LLC (FGT), 5444 Westheimer Road, Houston, Texas 77056, filed
in Docket No. CP08-427-000, a prior notice request pursuant to sections
157.205 and 157.212 of the Federal Energy Regulatory Commission's
regulations under the Natural Gas Act for authorization to construct,
own, and operate an interconnect with Golden Pass Pipeline LP (GPPL),
located in Orange County, Texas, to receive revaporized liquefied
natural gas (LNG), all as more fully set forth in the application,
which is on file with the Commission and open to public inspection. The
filing may also be viewed on the Web at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-
free, (866) 208-3676 or TTY, (202) 502-8659.
Specifically, FGT proposes the installation of a 12-inch tap and
valve, approximately 40 feet of 16-inch diameter connecting pipe,
electronic flow measurement equipment, a gas chromatograph, and an
instrument and electrical building (GPPL Interconnect). FGT estimates
the cost of construction to be $484,065. FGT states that the proposed
GPPL Meter Station will be designed and constructed for flow capability
of up to 250 MMcf/d. FGT asserts that the new GPPL Interconnect will
provide FGT with the ability to receive revaporized LNG from the Golden
Pass LNG terminal, through the GPPL pipeline.
Any questions regarding the application should be directed to
Stephen Veatch, Senior Director of Certificates & Tariffs, Florida Gas
Transmission Company, LLC, 5444 Westheimer Road, Houston, Texas 77056,
at (713) 989-2024, fax (713) 989-1158, or by e-mail
stephen.veatch@SUG.com.
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention. Any person filing to intervene or the Commission's staff
may, pursuant to section 157.205 of the Commission's Regulations under
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for protest. If a protest is filed and not
withdrawn within 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the Internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (https://www.ferc.gov) under the ``e-Filing'' link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-15090 Filed 7-2-08; 8:45 am]
BILLING CODE 6717-01-P