Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations, 37501-37508 [E8-14342]
Download as PDF
Federal Register / Vol. 73, No. 127 / Tuesday, July 1, 2008 / Notices
Proposal Review Panel for
Engineering Education and Centers,
#173;
Proposal Review Panel for
Experimental Programs to Stimulate
Competitive Research, #1198;
Proposal Review Panel for Graduate
Education, #57;
Proposal Review Panel for Human
Resource Development, #1199;
Proposal Review Panel for
Information and Intelligent Systems,
#1200;
Proposal Review Panel for Materials
Research, #1203;
Proposal Review Panel for
Mathematical Sciences, #1204;
Proposal Review Panel for Physics,
#1208;
Proposal Review Panel for Polar
Programs, #1209;
Proposal Review Panel for
Undergraduate Education, #1214.
Effective date for renewal is July 1,
2008. For more information, please
contact Susanne Bolton, NSF, at (703)
292–7488.
Dated: June 25, 2008.
Susanne Bolton,
Committee Management Officer.
[FR Doc. E8–14814 Filed 6–30–08; 8:45 am]
BILLING CODE 7555–01–P
NUCLEAR REGULATORY
COMMISSION
Biweekly Notice; Applications and
Amendments to Facility Operating
Licenses Involving No Significant
Hazards Considerations
sroberts on PROD1PC70 with NOTICES
I. Background
Pursuant to section 189a.(2) of the
Atomic Energy Act of 1954, as amended
(the Act), the U.S. Nuclear Regulatory
Commission (the Commission or NRC
staff) is publishing this regular biweekly
notice. The Act requires the
Commission publish notice of any
amendments issued, or proposed to be
issued and grants the Commission the
authority to issue and make
immediately effective any amendment
to an operating license upon a
determination by the Commission that
such amendment involves no significant
hazards consideration, notwithstanding
the pendency before the Commission of
a request for a hearing from any person.
This biweekly notice includes all
notices of amendments issued, or
proposed to be issued from June 5, 2008,
to June 18, 2008. The last biweekly
notice was published on June 17, 2008
(73 FR 34337).
VerDate Aug<31>2005
21:01 Jun 30, 2008
Jkt 214001
Notice of Consideration of Issuance of
Amendments to Facility Operating
Licenses, Proposed No Significant
Hazards Consideration Determination,
and Opportunity for a Hearing
The Commission has made a
proposed determination that the
following amendment requests involve
no significant hazards consideration.
Under the Commission’s regulations in
10 CFR 50.92, this means that operation
of the facility in accordance with the
proposed amendment would not (1)
involve a significant increase in the
probability or consequences of an
accident previously evaluated; or (2)
create the possibility of a new or
different kind of accident from any
accident previously evaluated; or (3)
involve a significant reduction in a
margin of safety. The basis for this
proposed determination for each
amendment request is shown below.
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 30 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period should circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example in
derating or shutdown of the facility.
Should the Commission take action
prior to the expiration of either the
comment period or the notice period, it
will publish in the Federal Register a
notice of issuance. Should the
Commission make a final No Significant
Hazards Consideration Determination,
any hearing will take place after
issuance. The Commission expects that
the need to take this action will occur
very infrequently.
Written comments may be submitted
by mail to the Chief, Rulemaking,
Directives and Editing Branch, Division
of Administrative Services, Office of
Administration, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, and should cite the publication
date and page number of this Federal
Register notice. Written comments may
also be delivered to Room 6D44, Two
PO 00000
Frm 00095
Fmt 4703
Sfmt 4703
37501
White Flint North, 11545 Rockville
Pike, Rockville, Maryland, from 7:30
a.m. to 4:15 p.m. Federal workdays.
Copies of written comments received
may be examined at the Commission’s
Public Document Room (PDR), located
at One White Flint North, Public File
Area O1F21, 11555 Rockville Pike (first
floor), Rockville, Maryland. The filing of
requests for a hearing and petitions for
leave to intervene is discussed below.
Within 60 days after the date of
publication of this notice, person(s) may
file a request for a hearing with respect
to issuance of the amendment to the
subject facility operating license and
any person whose interest may be
affected by this proceeding and who
wishes to participate as a party in the
proceeding must file a written request
via electronic submission through the
NRC E-Filing system for a hearing and
a petition for leave to intervene.
Requests for a hearing and a petition for
leave to intervene shall be filed in
accordance with the Commission’s
‘‘Rules of Practice for Domestic
Licensing Proceedings’’ in 10 CFR part
2. Interested person(s) should consult a
current copy of 10 CFR 2.309, which is
available at the Commission’s PDR,
located at One White Flint North, Public
File Area 01F21, 11555 Rockville Pike
(first floor), Rockville, Maryland.
Publicly available records will be
accessible from the Agencywide
Documents Access and Management
System’s (ADAMS) Public Electronic
Reading Room on the Internet at the
NRC Web site, https://www.nrc.gov/
reading-rm/doc-collections/cfr/. If a
request for a hearing or petition for
leave to intervene is filed within 60
days, the Commission or a presiding
officer designated by the Commission or
by the Chief Administrative Judge of the
Atomic Safety and Licensing Board
Panel, will rule on the request and/or
petition; and the Secretary or the Chief
Administrative Judge of the Atomic
Safety and Licensing Board will issue a
notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a
petition for leave to intervene shall set
forth with particularity the interest of
the petitioner in the proceeding, and
how that interest may be affected by the
results of the proceeding. The petition
should specifically explain the reasons
why intervention should be permitted
with particular reference to the
following general requirements: (1) The
name, address, and telephone number of
the requestor or petitioner; (2) the
nature of the requestor’s/petitioner’s
right under the Act to be made a party
to the proceeding; (3) the nature and
extent of the requestor’s/petitioner’s
E:\FR\FM\01JYN1.SGM
01JYN1
sroberts on PROD1PC70 with NOTICES
37502
Federal Register / Vol. 73, No. 127 / Tuesday, July 1, 2008 / Notices
property, financial, or other interest in
the proceeding; and (4) the possible
effect of any decision or order which
may be entered in the proceeding on the
requestor’s/petitioner’s interest. The
petition must also set forth the specific
contentions which the petitioner/
requestor seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the petitioner/requestor shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner/requestor
intends to rely in proving the contention
at the hearing. The petitioner/requestor
must also provide references to those
specific sources and documents of
which the petitioner is aware and on
which the petitioner/requestor intends
to rely to establish those facts or expert
opinion. The petition must include
sufficient information to show that a
genuine dispute exists with the
applicant on a material issue of law or
fact. Contentions shall be limited to
matters within the scope of the
amendment under consideration. The
contention must be one which, if
proven, would entitle the petitioner/
requestor to relief. A petitioner/
requestor who fails to satisfy these
requirements with respect to at least one
contention will not be permitted to
participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing.
If a hearing is requested, and the
Commission has not made a final
determination on the issue of no
significant hazards consideration, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, any hearing held would
take place before the issuance of any
amendment.
A request for hearing or a petition for
leave to intervene must be filed in
VerDate Aug<31>2005
21:01 Jun 30, 2008
Jkt 214001
accordance with the NRC E-Filing rule,
which the NRC promulgated in August
28, 2007 (72 FR 49139). The E-Filing
process requires participants to submit
and serve documents over the internet
or in some cases to mail copies on
electronic storage media. Participants
may not submit paper copies of their
filings unless they seek a waiver in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least five (5)
days prior to the filing deadline, the
petitioner/requestor must contact the
Office of the Secretary by e-mail at
hearingdocket@nrc.gov, or by calling
(301) 415–1677, to request (1) a digital
ID certificate, which allows the
participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and/or (2) creation of an
electronic docket for the proceeding
(even in instances in which the
petitioner/requestor (or its counsel or
representative) already holds an NRCissued digital ID certificate). Each
petitioner/requestor will need to
download the Workplace Forms
Viewer(TM) to access the Electronic
Information Exchange (EIE), a
component of the E-Filing system. The
Workplace Forms Viewer(tm) is free and
is available at https://www.nrc.gov/sitehelp/e-submittals/install-viewer.html.
Information about applying for a digital
ID certificate is available on NRC’s
public Web site at https://www.nrc.gov/
site-help/e-submittals/applycertificates.html.
Once a petitioner/requestor has
obtained a digital ID certificate, had a
docket created, and downloaded the EIE
viewer, it can then submit a request for
hearing or petition for leave to
intervene. Submissions should be in
Portable Document Format (PDF) in
accordance with NRC guidance
available on the NRC public Web site at
https://www.nrc.gov/site-help/esubmittals.html. A filing is considered
complete at the time the filer submits its
documents through EIE. To be timely,
an electronic filing must be submitted to
the EIE system no later than 11:59 p.m.
Eastern Time on the due date. Upon
receipt of a transmission, the E-Filing
system time-stamps the document and
sends the submitter an e-mail notice
confirming receipt of the document. The
EIE system also distributes an e-mail
notice that provides access to the
document to the NRC Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
PO 00000
Frm 00096
Fmt 4703
Sfmt 4703
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E-Filing system.
A person filing electronically may
seek assistance through the ‘‘Contact
Us’’ link located on the NRC Web site
at https://www.nrc.gov/site-help/esubmittals.html or by calling the NRC
technical help line, which is available
between 8:30 a.m. and 4:15 p.m.,
Eastern Time, Monday through Friday.
The help line number is (800) 397–4209
or locally, (301) 415–4737.
Participants who believe that they
have a good cause for not submitting
documents electronically must file a
motion, in accordance with 10 CFR
2.302(g), with their initial paper filing
requesting authorization to continue to
submit documents in paper format.
Such filings must be submitted by: (1)
First class mail addressed to the Office
of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemaking and Adjudications Staff; or
(2) courier, express mail, or expedited
delivery service to the Office of the
Secretary, Sixteenth Floor, One White
Flint North, 11555 Rockville Pike,
Rockville, Maryland 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing a document in this
manner are responsible for serving the
document on all other participants.
Filing is considered complete by firstclass mail as of the time of deposit in
the mail, or by courier, express mail, or
expedited delivery service upon
depositing the document with the
provider of the service.
Non-timely requests and/or petitions
and contentions will not be entertained
absent a determination by the
Commission, the presiding officer, or
the Atomic Safety and Licensing Board
that the petition and/or request should
be granted and/or the contentions
should be admitted, based on a
balancing of the factors specified in 10
CFR 2.309(c)(1)(i)–(viii). To be timely,
filings must be submitted no later than
11:59 p.m. Eastern Time on the due
date.
Documents submitted in adjudicatory
proceedings will appear in NRC’s
electronic hearing docket which is
available to the public at https://
ehd.nrc.gov/EHD_Proceeding/home.asp,
unless excluded pursuant to an order of
the Commission, an Atomic Safety and
Licensing Board, or a Presiding Officer.
Participants are requested not to include
E:\FR\FM\01JYN1.SGM
01JYN1
Federal Register / Vol. 73, No. 127 / Tuesday, July 1, 2008 / Notices
sroberts on PROD1PC70 with NOTICES
personal privacy information, such as
social security numbers, home
addresses, or home phone numbers in
their filings. With respect to copyrighted
works, except for limited excerpts that
serve the purpose of the adjudicatory
filings and would constitute a Fair Use
application, participants are requested
not to include copyrighted materials in
their submission.
For further details with respect to this
amendment action, see the application
for amendment which is available for
public inspection at the Commission’s
PDR, located at One White Flint North,
Public File Area 01F21, 11555 Rockville
Pike (first floor), Rockville, Maryland.
Publicly available records will be
accessible from the ADAMS Public
Electronic Reading Room on the Internet
at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html. If
you do not have access to ADAMS or if
there are problems in accessing the
documents located in ADAMS, contact
the PDR Reference staff at 1 (800) 397–
4209, (301) 415–4737 or by e-mail to
pdr@nrc.gov.
Entergy Nuclear Operations, Inc.,
Docket No. 50–333, James A. FitzPatrick
Nuclear Power Plant (JAFNPP), Oswego
County, New York
Date of amendment request: April 22,
2008.
Description of amendment request:
The proposed amendment would
modify Technical Specification (TS) 1.0,
‘‘Definitions’’, Limiting Conditions for
Operation and Surveillance
Requirement Applicability Section
3.4.9, ‘‘RCS [Reactor Coolant System]
Pressure and Temperature (P/T)
Limits’’, and Section 5.0,
‘‘Administrative Controls’’ to delete
reference to the pressure and
temperature curves, and include
reference to the Pressure and
Temperature Limits Report (PTLR). This
proposed change would adopt the
methodology of SIR–05–044–A,
‘‘Pressure-Temperature Limits Report
Methodology for Boiling Water
Reactors,’’ for preparation of the
pressure and temperature curves, and
incorporate the guidance of TSTF–419–
A, ‘‘Revise PTLR Definition and
References in ISTS [Improved Standard
Technical Specifications] 5.6.6, RCS
PTLR.’’
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed change involve a
significant increase in the probability or
VerDate Aug<31>2005
21:01 Jun 30, 2008
Jkt 214001
consequences of an accident previously
evaluated?
Response: No.
The proposed change modifies Technical
Specifications (TS) Section 1.0
(‘‘Definitions’’), Limiting Conditions for
Operation and Surveillance Requirement
Applicability Section 3.4.9 (‘‘RCS Pressure
and Temperature (P/T) Limits’’), and 5.0
(‘‘Administrative Controls’’), to delete
reference to the pressure and temperature
curves and include reference to the Pressure
and Temperature Limits Report (PTLR). This
change adopts the methodology of SIR–05–
044–A, ‘‘Pressure-Temperature Limits Report
Methodology for Boiling Water Reactors’’,
dated April 2007 for preparation of the
pressure and temperature curves, and
incorporates the guidance of TSTF–419–A
(‘‘Revised PTLR Definition and References in
ISTS 5.6.6, RCS PTLR’’). In an NRC Safety
Evaluation Report dated February 6, 2007,
‘‘the NRC staff has found that SIR–05–044 is
acceptable for referencing in licensing
applications for General Electric-designed
boiling water reactors to the extent specified
and under the limitations delineated in the
TR [Topical Report] and in the enclosed final
SE [Safety Evaluation]’’. As part of this
change, the JAF Pressure and Temperature
Limits Report (PTLR) based on the
methodology and template provided in SIR–
05–044–A is being supplied for review. The
pressure and temperature curves utilize the
methodology of SIR–05–044–A.
The NRC has established requirements in
Appendix G to 10 CFR [Part] 50 in order to
protect the integrity of the reactor coolant
pressure boundary (RCPB) in nuclear power
plants. Additionally, the regulation in 10
CFR Part 50, Appendix H, provides the NRC
staff’s criteria for the design and
implementation of RPV material surveillance
programs for operating lightwater reactors.
Implementing this NRC approved
methodology does not reduce the ability to
protect the reactor coolant pressure boundary
as specified in Appendix G, nor will this
change increase the probability of
malfunction of plant equipment, or the
failure of plant structures, systems, or
components. Incorporation of the new
methodology for calculating P–T curves, and
the relocation of the P–T curves from the TS
to the PTLR provides an equivalent level of
assurance that the RCPB is capable of
performing its intended safety functions.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change does not affect the
assumed accident performance of the RCPB,
nor any plant structure, system, or
component previously evaluated. The
proposed change does not involve the
installation of new equipment, and installed
equipment is not being operated in a new or
different manner. The change in
methodology ensures that the RCPB remains
capable of performing its safety functions. No
PO 00000
Frm 00097
Fmt 4703
Sfmt 4703
37503
set points are being changed which would
alter the dynamic response of plant
equipment. Accordingly, no new failure
modes are introduced which could introduce
the possibility of a new or different kind of
accident from any previously evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
The proposed change does not affect the
function of the RCPB or its response during
plant transients. There are no changes
proposed which alter the set points at which
protective actions are initiated, and there is
no change to the operability requirements for
equipment assumed to operate for accident
mitigation. This change adopts the
methodology of SIR–05–044–A, ‘‘PressureTemperature Limits Report Methodology for
Boiling Water Reactors’’, dated April 2007 for
preparation of the pressure and temperature
curves. Therefore, the proposed change does
not involve a significant reduction in a
margin of safety.
This change adopts the methodology of
SIR–05–044–A, ‘‘Pressure-Temperature
Limits Report Methodology for Boiling Water
Reactors’’, dated April 2007 for preparation
of the pressure and temperature curves, and
incorporates the guidance of TSTF–419–A
(‘‘Revise PTLR Definition and References in
ISTS 5.6.6, RCS PTLR’’). In an NRC Safety
Evaluation Report dated February 6, 2007,
the NRC staff has found that SIR–05–044 is
acceptable for referencing in licensing
applications for General Electric-designed
boiling water reactors.’’
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Mr. William C.
Dennis, Assistant General Counsel,
Entergy Nuclear Operations, Inc., 440
Hamilton Avenue, White Plains, NY
10601.
NRC Branch Chief: Mark G. Kowal.
Entergy Nuclear Operations, Inc.,
Docket Nos. 50–247 and 50–286, Indian
Point Nuclear Generating Unit Nos. 2
and 3, Westchester County, New York
Date of amendment request: March
13, 2008.
Description of amendment request:
The proposed amendment would revise
the Updated Final Safety Analysis
Reports (UFSARs) for Indian Point
Nuclear Generating Unit Nos. 2 and 3 to
reflect a revised Emergency Core
Cooling System (ECCS) and Component
Cooling Water System (CCWS) single
passive failure analysis and the
recirculation phase backup capability.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
E:\FR\FM\01JYN1.SGM
01JYN1
37504
Federal Register / Vol. 73, No. 127 / Tuesday, July 1, 2008 / Notices
sroberts on PROD1PC70 with NOTICES
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The probabilities of accidents previously
evaluated are based on the probability of
initiating events for these accidents.
The proposed changes to the ECCS and
CCWS (Unit 2 only) passive failure and
recirculation phase backup capability
licensing basis do not have any impact on the
integrity of any plant system, structure or
component that initiates an analyzed event.
The ECCS system and the CCWS are accident
mitigating systems under these conditions
and therefore cannot cause accidents. Thus
the probability of any accident previously
evaluated is not significantly increased.
The consequences of accidents previously
evaluated are determined by the results of
analyses that are based on plant initial
conditions, the type of accident, plant
response, and the operation and potential
failure of equipment and systems. Because a
passive failure within 24 hours of the
initiating event is not a credible failure, the
ECCS and the CCWS (Unit 2 only) will
continue to operate as required for accident
mitigation. Therefore, the consequences of
the accident are not significantly impacted by
this proposed change.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
New or different kinds of accidents can
only be created by new or different accident
initiators or sequences. The proposed
changes do not create any new or different
accident initiators because these changes do
not cause failures of equipment or accident
sequences different from those previously
evaluated. The ECCS and CCWS (Unit 2 only)
systems affected by the changes are used to
mitigate the consequences of an accident that
has already occurred. The proposed UFSAR
changes do not significantly affect the
mitigative function of these systems. No new
failure mechanisms will be introduced by the
proposed changes. The changes do not result
in any event previously deemed incredible
being made credible. Therefore, plant
operation in accordance with the proposed
changes will not create the possibility of a
new or different [kind] of accident from any
accident previously evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
The proposed amendment does not involve
a significant reduction in a margin of safety.
The proposed changes do not adversely affect
plant safety limits, set points, or design
parameters.
The proposed changes assure that the
ECCS, and Containment Spray recirculation
functions can be adequately accomplished.
The proposed changes do not have any
impact on the integrity of any plant system,
structure or component that initiates an
VerDate Aug<31>2005
21:01 Jun 30, 2008
Jkt 214001
analyzed event. The proposed changes do
revise the ECCS and CCWS (Unit 2 only)
licensing basis. The revised licensing bases
were appropriately evaluated to ensure that
there was no significant reduction in the
margin of safety. The ECCS and CCWS will
continue to provide accident mitigation
capability.
Therefore, the proposed change will not
create a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Mr. William C.
Dennis, Assistant General Counsel,
Entergy Nuclear Operations, Inc., 440
Hamilton Avenue, White Plains, NY
10601.
NRC Branch Chief: Mark G. Kowal.
Exelon Generation Company, LLC,
Docket Nos. STN 50–456 and STN 50–
457, Braidwood Station, Units 1 and 2,
Will County, Illinois
Docket Nos. STN 50–454 and STN 50–
455, Byron Station, Unit Nos. 1 and 2,
Ogle County, Illinois
Date of amendment request: April 9,
2008.
Description of amendment request:
The proposed amendments would
revise Technical Specifications (TSs)
5.5.6, ‘‘Pre-Stressed Concrete
Containment Tendon Surveillance
Program,’’ and 5.6.8, ‘‘Tendon
Surveillance Report,’’ for consistency
with the requirements of Title 10 Code
of Federal Regulations (10 CFR) section
50.55a, ‘‘Codes and standards,’’
paragraph (g)(4) for components
classified as American Society of
Mechanical Engineers Boiler and
Pressure Vessel Code (ASME Code)
Class CC. Specifically, the proposed
changes would replace or delete the
reference to the specific ASME Code
year for the tendon surveillance
program with a requirement to use the
applicable ASME Code and addenda as
required by 10 CFR 50.55a(g)(4).
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed change revises the TS
administrative controls program for
PO 00000
Frm 00098
Fmt 4703
Sfmt 4703
consistency with the requirements of 10 CFR
50.55a(g)(4) for components classified as
Code Class CC.
The revised requirements do not affect the
function of the containment post-tensioning
system components. The post-tensioning
systems are passive components whose
failure modes could not act as accident
initiators or precursors. The proposed change
does not impact the physical configuration or
function of plant structures, systems, or
components (SSCs) or the manner in which
SSCs are operated, maintained, modified,
tested, or inspected. The proposed change
does not impact the initiators or assumptions
of analyzed events, nor does it impact the
mitigation of accidents or transient events.
The proposed change does not impact any
accident initiators or analyzed events or
assumed mitigation of accident or transient
events. It does not involve the addition or
removal of any equipment, or any design
changes to the facility.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change revises the TS
administrative controls program for
consistency with the requirements of 10 CFR
50.55a(g)(4) for components classified as
Code Class CC.
The function of the containment posttensioning system components is not altered
by this change. The proposed change does
not involve a modification to the physical
configuration of the plant (i.e., no new
equipment will be installed) or change in the
methods governing normal plant operation.
The proposed change will not impose any
new or different requirements or introduce a
new accident initiator, accident precursor, or
malfunction mechanism. Additionally, there
is no change in the types or increases in the
amounts of any effluent that may be released
off-site and there is no increase in individual
or cumulative occupational exposure.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
The proposed change revises the TS
administrative controls program
requirements for consistency with the
requirements of 10 CFR 50.55a(g)(4) for
components classified as Code Class CC.
The function of the containment posttensioning system components are not
altered by this change. The change is
conforming and administrative in nature in
that it will allow the TS to be updated to
refer to the most recently approved edition of
the ASME Boiler and Pressure Vessel Code
Subsection IWL. The safety function of the
containment as a fission product barrier will
be maintained.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
E:\FR\FM\01JYN1.SGM
01JYN1
Federal Register / Vol. 73, No. 127 / Tuesday, July 1, 2008 / Notices
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
Attorney for licensee: Mr. Bradley J.
Fewell, Associate General Counsel,
Exelon Generation Company, LLC, 4300
Winfield Road, Warrenville, IL 60555.
NRC Branch Chief: Russell Gibbs.
sroberts on PROD1PC70 with NOTICES
Exelon Generation Company, LLC,
Docket Nos. 50–352 and 50–353,
Limerick Generating Station, Units 1
and 2, Montgomery County,
Pennsylvania
Date of amendment request:
November 13, 2007.
Description of amendment request:
The proposed changes delete footnotes
from technical specification (TS)
Surveillance Requirement (SR) 4.4.1.2,
regarding the reactor coolant system jet
pumps, which require using data
recorded from the original startup test
program as a baseline for evaluating jet
pump performance in accordance with
the TS SR. Due to physical changes in
plant configuration, the original
baseline data may not reflect the most
current performance characteristics of
the jet pumps, and hence, its use could
impact the accuracy of the TS SR
results. This change provides the
flexibility to re-establish baseline
characteristics when warranted.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below, with NRC staff edits in brackets:
1. Do the proposed changes involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed changes provide the ability
to re-establish recirculation pump flow, core
flow, or diffuser-to-lower plenum differential
pressure characteristics, provided as the basis
for performing the Technical Specification
(TS) jet pump surveillances, based on
physical changes to the plant that could
affect the accuracy of the TS SR required
comparison. The proposed changes do not
impact the physical configuration or function
of plant structures, systems, or components
(SSCs) or the manner in which SSCs are
operated, maintained, modified, or inspected
[with the exception of a periodic re-baseline
of the jet pump test acceptance criteria]. The
proposed changes do not impact the
initiators or assumptions of analyzed events,
nor do they impact mitigation of accidents or
transient events. [The proposed changes will
continue to ensure that potential jet pump
VerDate Aug<31>2005
21:01 Jun 30, 2008
Jkt 214001
degradation is detected prior to failure and,
as a result, ensure that the current margin of
safety is maintained during postulated
accidents].
Therefore, the proposed changes do not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Do the proposed changes create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed changes provide the ability
to re-establish recirculation pump flow, core
flow, or diffuser-to-lower plenum differential
pressure patterns or characteristics, provided
as the basis for performing the TS jet pump
surveillances, based on physical changes to
the plant that could affect the accuracy of the
TS SR required comparison. The proposed
changes do not alter plant configuration,
require that new plant equipment be
installed, alter assumptions made about
accidents previously evaluated, or impact the
function of plant SSCs or the manner in
which SSCs are operated, maintained,
modified, or inspected [with the exception of
a periodic re-baseline of the jet pump test
acceptance criteria].
Therefore, the proposed changes do not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Do the proposed changes involve a
significant reduction in a margin of safety?
Response: No.
The proposed changes provide the ability
to re-establish recirculation pump flow, core
flow, or diffuser-to-lower plenum differential
pressure patterns or characteristics, provided
as the basis for performing the TS jet pump
surveillances, based on physical changes to
the plant that could affect the accuracy of the
TS SR required comparison. The proposed
changes do not involve any physical changes
to plant SSCs or the manner in which SSCs
are operated, maintained, modified, or
inspected [with the exception of a periodic
re-baseline of the jet pump test acceptance
criteria]. The proposed changes do not
involve a change to any safety limits, limiting
safety system settings, limiting conditions of
operation, or design parameters for any SSC.
The proposed changes do not impact any
safety analysis assumptions and do not
involve a change in initial conditions, system
response times, or other parameters affecting
an accident analysis. [The proposed changes
will continue to ensure that potential jet
pump degradation is detected prior to failure
and, as a result, ensure that the current
margin of safety is maintained during
postulated accidents.]
Therefore, the proposed changes do not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, with the changes noted above, it
appears that the three standards of 10
CFR 50.92(c) are satisfied. Therefore, the
NRC staff proposes to determine that the
amendment request involves no
significant hazards consideration.
PO 00000
Frm 00099
Fmt 4703
Sfmt 4703
37505
Attorney for licensee: J. Bradley
Fewell, Esquire, Associate General
Counsel, Exelon Generation Company,
LLC, 4300 Winfield Road, Warrenville,
IL 60555.
NRC Branch Chief: Harold K.
Chernoff.
Southern Nuclear Operating Company,
Inc., Docket Nos. 50–348 and 50–364,
Joseph M. Farley Nuclear Plant, Units 1
and 2, Houston County, Alabama
Southern Nuclear Operating Company,
Inc., Georgia Power Company,
Oglethorpe Power Corporation,
Municipal Electric Authority of Georgia,
City of Dalton, Georgia, Docket Nos. 50–
321 and 50–366; Edwin I. Hatch Nuclear
Plant, Units 1 and 2, Appling County,
Georgia
Southern Nuclear Operating Company,
Inc., Docket Nos. 50–424 and 50–425;
Vogtle Electric Generating Plant, Units 1
and 2, Burke County, Georgia
Date of amendment request: June 12,
2008.
Description of amendment request:
The proposed amendments would
revise the current Technical
Specifications (TS) 5.2.2.f for the Farley,
Hatch and Vogtle plants to require
either the Operations Manager or at least
one Operations Superintendent to hold
a Senior Reactor Operator (SRO) license
and to provide conforming changes to
TS 5.3. An application that addressed
only the TS 5.2.2.f issue was submitted
on July 17, 2007, and notice of that
application was provided in the Federal
Register on September 25, 2007, for
Farley (72 FR 5480), Hatch (72 FR
54481), and Vogtle (72 FR 54482). Due
to changes in the June 12, 2008
application from those proposed in the
July 17, 2007 application, the changed
application is being renoticed in its
entirety. This notice supersedes the
previous notice published in the
Federal Register on September 25, 2007.
Basis for proposed no significant
hazards consideration determination:
As required by 10 CFR 50.91(a), the
licensee has provided its analysis of the
issue of no significant hazards
consideration, which is presented
below:
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed change to TS 5.2 revises the
requirement concerning the Operations
management position that must hold an SRO
license. At least one Operations
Superintendent or the Operations Manager
will continue to maintain an SRO license.
The proposed change to TS 5.3.1 is a
clarification regarding the qualifications of
E:\FR\FM\01JYN1.SGM
01JYN1
sroberts on PROD1PC70 with NOTICES
37506
Federal Register / Vol. 73, No. 127 / Tuesday, July 1, 2008 / Notices
the Operations Manager. This clarification
states that TS 5.2.2.f specifies the
requirements for the Operations Manager
regarding the holding of an SRO license. The
training, qualification and experience
requirements for Operations management
personnel will continue to satisfy the Unit
Staff Qualifications as described in the
applicable TS 5.3.1.
This change does not impact any accident
initiators or analyzed events. It does not
impact any assumed mitigation capability for
any accident or transient event. The change
does not involve the addition or removal of
any equipment or any design changes to the
facility. As the proposed change is
administrative in nature, operation of the
facility in accordance with the proposed
amendment does not involve a significant
increase in the probability or consequences
of an accident previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change to TS 5.2 revises the
requirement concerning the Operations
management position that must hold an SRO
license. At least one Operations
Superintendent or the Operations Manager
will continue to maintain an SRO license.
The proposed change to TS 5.3.1 is a
clarification regarding the qualifications of
the Operations Manager. This clarification
states that TS 5.2.2.f specifies the
requirements for the Operations Manager
regarding the holding of an SRO license. The
training, qualification and experience
requirements for Operations management
personnel will continue to satisfy the Unit
Staff Qualifications as described in the
applicable TS 5.3.1. This change does not
involve any physical modifications to plant
structures, systems, or components (SSCs), or
the manner in which SSCs are operated,
maintained, modified, tested, or inspected. In
addition, there is no change in the types or
increases in the amounts of effluents that
may be released offsite, and there is no
increase in individual or cumulative
occupational radiation exposure. As the
proposed change is administrative in nature,
operation of the facility in accordance with
the proposed amendment does not create the
possibility of a new or different kind of
accident from any accident previously
evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
Response: No.
The proposed change to TS 5.2 revises the
requirement concerning the Operations
management position that must hold an SRO
license. At least one Operations
Superintendent or the Operations Manager
will continue to maintain an SRO license.
The subject Operations Superintendent will
be qualified to fill the Operations Manager
position and have the same management
authority over licensed operators as the
Operations Manager. The proposed change to
TS 5.3.1 is a clarification regarding the
qualifications of the Operations Manager.
This clarification states that TS 5.2.2.f
specifies the requirements for the Operations
VerDate Aug<31>2005
21:01 Jun 30, 2008
Jkt 214001
Manager regarding the holding of an SRO
license. The training, qualification and
experience requirements for Operations
management personnel will continue to
satisfy the Unit Staff Qualifications as
described in the applicable TS 5.3.1.
This change does not involve any physical
modifications to SSCs, or the manner in
which SSCs are operated, maintained,
modified, tested, or inspected. The change
does not alter the manner in which safety
limits, limiting safety system settings, or
limiting conditions for operation are
determined. The setpoints at which
protective actions are initiated are not altered
by the change. As the proposed change is
administrative in nature, operation of the
facility in accordance with the proposed
amendment does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied.
Therefore, the NRC staff proposes to
determine that the amendment request
involves no significant hazards
consideration.
Attorney for licensee: Farley: M.
Stanford Blanton, Esq., Balch and
Bingham, Post Office Box 306, 1710
Sixth Avenue North, Birmingham,
Alabama 35201; Hatch: Ernest L. Blake,
Jr., Esquire, Shaw, Pittman, Potts and
Trowbridge, 2300 N Street, NW.,
Washington, DC 20037; Vogtle: Mr.
Arthur H. Domby, Troutman Sanders,
NationsBank Plaza, Suite 5200, 600
Peachtree Street, NE., Atlanta, Georgia
30308–2216.
NRC Branch Chief: Melanie C. Wong.
Previously Published Notices of
Consideration of Issuance of
Amendments to Facility Operating
Licenses, Proposed No Significant
Hazards Consideration Determination,
and Opportunity for a Hearing
The following notices were previously
published as separate individual
notices. The notice content was the
same as above. They were published as
individual notices either because time
did not allow the Commission to wait
for this biweekly notice or because the
action involved exigent circumstances.
They are repeated here because the
biweekly notice lists all amendments
issued or proposed to be issued
involving no significant hazards
consideration.
For details, see the individual notice
in the Federal Register on the day and
page cited. This notice does not extend
the notice period of the original notice.
PO 00000
Frm 00100
Fmt 4703
Sfmt 4703
Dominion Nuclear Connecticut, Inc.,
Docket Nos. 50–336 and 50–423,
Millstone Power Station, Unit Nos. 2
and 3, New London County, Connecticut
Date of amendment request: July 13,
2007.
Brief description of amendment
request: The proposed amendment
would modify the Technical
Specifications (TSs) and facility
operating licenses in response to the
application dated July 13, 2007, as
supplemented by letters dated
December 7, 2007, March 5 and 25,
2008, and April 28, 2008. The proposed
amendment would establish more
effective and appropriate action,
surveillance, and administrative
requirements related to ensuring the
habitability of the control room
envelope in accordance with the
Commission-approved TS Task Force
(TSTF) Standard Technical
Specification change traveler TSTF–448,
Revision 3, ‘‘Control Room
Habitability.’’ Additionally, the
proposed amendment would change the
‘‘irradiated fuel movement’’ terminology
and adopt ‘‘movement of recently
irradiated fuel assemblies’’ terminology
consistent with TSTF–448, Revision 3.
Date of publication of individual
notice in Federal Register: May 16,
2008 (73 FR 28534).
Expiration dates of individual notice:
June 16, 2008 (Public comments) and
July 15, 2008 (Hearing requests).
Florida Power and Light Company, et
al., Docket No. 50–389, St. Lucie Plant,
Unit No. 2, St. Lucie County, Florida
Date of amendment request: July 16,
2007, as supplemented June 2, 2008.
Description of amendment request: To
modify the operating licensing bases to
adopt the alternative source term as
allowed in 10 CFR 50.67 and described
in Regulatory Guide 1.183. The licensee
proposes to revise the licensing basis
through reanalysis of the following
radiological consequences of the
Updated Final Safety Analysis Report
Chapter 15 accidents: Loss-of-Coolant
Accident, Fuel-Handling Accident,
Main Steam Line Break, Steam
Generator Tube Rupture, Reactor
Coolant Pump Shaft Seizure, Control
Element Assembly Ejection, and
Inadvertent Opening of a Main Steam
Safety Valve.
Date of publication of individual
notice in the Federal Register: June
12, 2008 (73 FR 33460).
Expiration date of individual notice:
July 14, 2008 (comments) and August
11, 2008 (hearing).
E:\FR\FM\01JYN1.SGM
01JYN1
Federal Register / Vol. 73, No. 127 / Tuesday, July 1, 2008 / Notices
sroberts on PROD1PC70 with NOTICES
Notice of Issuance of Amendments to
Facility Operating Licenses
During the period since publication of
the last biweekly notice, the
Commission has issued the following
amendments. The Commission has
determined for each of these
amendments that the application
complies with the standards and
requirements of the Atomic Energy Act
of 1954, as amended (the Act), and the
Commission’s rules and regulations.
The Commission has made appropriate
findings as required by the Act and the
Commission’s rules and regulations in
10 CFR Chapter I, which are set forth in
the license amendment.
Notice of Consideration of Issuance of
Amendment to Facility Operating
License, Proposed No Significant
Hazards Consideration Determination,
and Opportunity for a Hearing in
connection with these actions was
published in the Federal Register as
indicated.
Unless otherwise indicated, the
Commission has determined that these
amendments satisfy the criteria for
categorical exclusion in accordance
with 10 CFR 51.22. Therefore, pursuant
to 10 CFR 51.22(b), no environmental
impact statement or environmental
assessment need be prepared for these
amendments. If the Commission has
prepared an environmental assessment
under the special circumstances
provision in 10 CFR 51.22(b) and has
made a determination based on that
assessment, it is so indicated.
For further details with respect to the
action see (1) the applications for
amendment, (2) the amendment, and (3)
the Commission’s related letter, Safety
Evaluation and/or Environmental
Assessment as indicated. All of these
items are available for public inspection
at the Commission’s Public Document
Room (PDR), located at One White Flint
North, Public File Area 01F21, 11555
Rockville Pike (first floor), Rockville,
Maryland. Publicly available records
will be accessible from the Agencywide
Documents Access and Management
Systems (ADAMS) Public Electronic
Reading Room on the internet at the
NRC Web site, https://www.nrc.gov/
reading-rm/adams.html. If you do not
have access to ADAMS or if there are
problems in accessing the documents
located in ADAMS, contact the PDR
Reference staff at 1 (800) 397–4209,
(301) 415–4737 or by e-mail to
pdr@nrc.gov.
VerDate Aug<31>2005
21:01 Jun 30, 2008
Jkt 214001
Carolina Power & Light Company, et al.,
Docket No. 50–400, Shearon Harris
Nuclear Power Plant, Unit 1, Wake and
Chatham Counties, North Carolina
Date of application for amendment:
June 15, 2007, as supplemented by letter
dated March 6, 2008.
Brief description of amendment: This
amendment relocates the Inservice
Testing (IST) requirements to the
administrative section of the Technical
Specifications (TSs), removes the
Inservice Inspection (ISI) requirements
from the TSs, and establishes a TS Bases
Control Program. Specifically, the
amendment deletes TS 4.0.5, relocates
the IST requirements to section 6 of the
TSs as a separate program, and
establishes a TS Bases Control Program
consistent with NUREG–1431, Revision
3.0, ‘‘Standard Technical
Specifications—Westinghouse Plants.’’
This amendment supports the third 10year intervals of the ISI and IST
programs at the Shearon Harris Nuclear
Plant, Unit 1.
Date of issuance: June 12, 2008.
Effective date: Effective as of the date
of issuance and shall be implemented
within 60 days.
Amendment No.: 127.
Operating License No. NPF–63: The
amendment revises the TSs and Facility
Operating License.
Date of initial notice in Federal
Register: July 31, 2007 (72 FR 41782).
Public comments requested as to
proposed no significant hazards
consideration: No.
The Commission’s related evaluation
of the amendment is contained in a
safety evaluation dated June 12, 2008.
Attorney for licensee: David T.
Conley, Associate General Counsel II—
Legal Department, Progress Energy
Service Company, LLC, Post Office Box
1551, Raleigh, North Carolina 27602–
1551.
NRC Branch Chief: Thomas H. Boyce.
Entergy Nuclear Operations, Inc.,
Docket No. 50–286, Indian Point
Nuclear Generating Unit No. 3,
Westchester County, New York
Date of application for amendment:
February 28, 2008.
Brief description of amendment: The
amendment revises the containment
buffering agent used for pH control
under post loss-of-coolant accident
(LOCA) conditions, from sodium
hydroxide to sodium tetraborate.
Date of issuance: June 9, 2008.
Effective date: As of the date of
issuance, and shall be implemented
within 60 days.
Amendment No.: 236.
PO 00000
Frm 00101
Fmt 4703
Sfmt 4703
37507
Facility Operating License Nos. DPR–
64: The amendment revised the License
and the Technical Specifications.
Date of initial notice in Federal
Register: April 8, 2008 (73 FR 19109).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated June 9, 2008.
No significant hazards consideration
comments received: No.
Entergy Nuclear Operations, Inc.,
Docket Nos. 50–247 and 50–286, Indian
Point Nuclear Generating Unit Nos. 2
and 3, Westchester County, New York
Date of application for amendment:
December 20, 2007.
Brief description of amendment: The
amendments revise the Technical
Specifications (TSs) associated with the
definition of E Bar and Reactor Coolant
System (RCS) Specific Activity
consistent with Revision 0 to the TS
Task force (TSTF) Standard Technical
Specification Change Document TSTF–
490, ‘‘Deletion of E Bar Definition and
Revision to RCS Specific Activity Tech
Spec.’’
Date of issuance: June 17, 2008.
Effective date: As of the date of
issuance, and shall be implemented
within 60 days.
Amendment Nos.: 254 and 237.
Facility Operating License Nos. DPR–
26 and DPR–64: The amendment
revised the License and the Technical
Specifications.
Date of initial notice in Federal
Register: March 25, 2008 (73 FR
15786).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated June 17, 2008.
No significant hazards consideration
comments received: No.
Virginia Electric and Power Company, et
al., Docket Nos. 50–280 and 50–281,
Surry Power Station, Unit Nos. 1 and 2,
Surry County, Virginia
Date of application for amendments:
June 25, 2007, as supplemented on
November 14, 2007, January 10, and
April 11, 2008.
Brief description of amendments:
These amendments increased the
maximum Technical Specification (TS)
service water (SW) temperature limit
from 95 °F to 100 °F, and revised the TS
Figure 3.8–1, which provides the
allowable containment air partial
pressure versus SW temperature.
Date of issuance: June 17, 2008.
Effective date: As of the date of
issuance and shall be implemented
within 30 days.
Amendment Nos.: 259 and 259.
Renewed Facility Operating License
Nos. DPR–32 and DPR–37: Amendments
E:\FR\FM\01JYN1.SGM
01JYN1
37508
Federal Register / Vol. 73, No. 127 / Tuesday, July 1, 2008 / Notices
changed the licenses and the technical
specifications.
Date of initial notice in Federal
Register: July 17, 2007 (72 FR 39084).
The supplements dated November 14,
2007, January 10 and April 11, 2008,
provided additional information that
clarified the application, did not expand
the scope of the application as originally
noticed, and did not change the staff’s
original proposed no significant hazards
consideration determination.
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated June 17, 2008.
No significant hazards consideration
comments received: No.
Dated at Rockville, Maryland, this 18th day
of June, 2008.
For the Nuclear Regulatory Commission.
Timothy J. McGinty,
Acting Director, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. E8–14342 Filed 6–30–08; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Governors’ Designees Receiving
Advance Notification of Transportation
of Nuclear Waste
On January 6, 1982 (47 FR 596 and 47
FR 600), the U.S. Nuclear Regulatory
Commission (NRC) published in the
Federal Register final amendments to
10 CFR Parts 71 and 73 (effective July
6, 1982), that require advance
notification to Governors or their
designees by NRC licensees prior to
transportation of certain shipments of
nuclear waste and spent fuel. The
advance notification covered in Part 73
is for spent nuclear reactor fuel
shipments and the notification for Part
71 is for large quantity shipments of
radioactive waste (and of spent nuclear
reactor fuel not covered under the final
amendment to 10 CFR Part 73).
The following list updates the names,
addresses, and telephone numbers of
those individuals in each State who are
responsible for receiving information on
nuclear waste shipments. The list will
be published annually in the Federal
Register on or about June 30, to reflect
any changes in information. Current
State contact information can also be
accessed throughout the year at https://
nrc-stp.ornl.gov/special/designee.pdf.
Questions regarding this matter
should be directed to Stephen N.
Salomon, Office of Federal and State
Materials and Environmental
Management Programs, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555, by e-mail at
Stephen.Salomon@nrc.gov or by
telephone at 301–415–2368.
Dated at Rockville, Maryland this 25th day
of June 2008.
For the U.S. Nuclear Regulatory
Commission.
Dennis K. Rathbun,
Director, Division of Intergovernmental
Liaison and Rulemaking, Office of Federal
and State Materials and Environmental
Management Programs.
INDIVIDUALS RECEIVING ADVANCE NOTIFICATION OF NUCLEAR WASTE SHIPMENTS
State
Part 71
Alabama ..........................
Colonel J. Christopher Murphy, Director, Alabama Department of Public
Safety, 301 Ripley Street, Montgomery, AL 36104, (334) 242–4394, 24
hours: (334) 242–4128.
Douglas H. Dasher, PE, Alaska Monitoring and Assessment Section Manager, 610 University Avenue, Fairbanks, AK 99709, (907) 451–2172, 24
hours: (907) 457–1421.
Aubrey V. Godwin, Director, Arizona Radiation Regulatory Agency, 4814
South 40th Street, Phoenix, AZ 85040, (602) 255–4845, ext. 222, 24
hours: (602) 223–2212.
Bernard Bevill, Radiation Control Section, Arkansas Department of Health
and Human Services, P.O. Box 1437, Mail Slot H–30, Little Rock, AR
72203–1437, (501) 661–2107, 24 hours: (501) 661–2136.
Captain Steve Dowling, California Highway Patrol, Enforcement Services
Division, 444 North 3rd St., Suite 310, P.O. Box 942898, Sacramento,
CA 94298–0001, (916) 445–1865, 24 hours: 1–(916) 861–1299.
Captain Allan Turner, Hazardous Materials Transport Safety and Response,
Colorado State Patrol, Troop 8, 15065 S. Golden Rd., Denver, CO
80401–3990, (303) 273–1910, 24 hours: (303) 239–4501.
Edward L. Wilds, Jr., Ph.D., Director, Radiation Division, Department of Environmental Protection, 79 Elm Street, 5th floor, Hartford, CT 06106–
5127, (860) 424–3029, 24 hours: (860) 424–3333.
David B. Mitchell, J.D., Secretary, Department of Safety & Homeland Security, P.O. Box 818, 303 Transportation Circle, Dover, DE 19903–0818,
(302) 744–2680, 24 hours: Cell (302) 222–6590.
John Williamson, Environmental Administrator, Bureau of Radiation Control,
Environmental Radiation Program, Department of Health, P.O. Box
680069, Orlando, FL 32868–0069, (407) 297–2095, 24 hours: (407) 297–
2095.
Captain Bruce Bugg, Special Projects Coordinator, Georgia Department of
Public Safety, Motor Carrier Compliance Division, P.O. Box 1456–Atlanta,
GA 30371, 959 E. Confederate Avenue, SE, Atlanta, GA 30316, (404)
624–7226, 24 hours: (404) 635–7200.
Laurence K. Lau, Deputy Director, for Environmental Health, Hawaii State
Department of Health, P.O. Box 3378, 1250 Punchbowl Street, Suite 325,
Honolulu, HI 96813, (808) 586–4424, 24 hours: (808) 368–6004.
Chiyome L. Fukino, M.D., Director of Health, Hawaii State Department of
Health, P.O. Box 3378, Honolulu, HI 96813, (808) 586–4424, 24 hours:
(808) 368–6004.
Lieutenant William L. Reese, Deputy Commander, Commercial Vehicle
Safety, Idaho State Police, P.O. Box 700, Meridian, ID 83680–0700,
(208) 884–7220, 24 hours: (208) 846–7500.
Alaska .............................
Arizona ............................
Arkansas .........................
California .........................
Colorado .........................
Connecticut .....................
Delaware .........................
Florida .............................
Georgia ...........................
sroberts on PROD1PC70 with NOTICES
Hawaii .............................
Idaho ...............................
VerDate Aug<31>2005
21:01 Jun 30, 2008
Jkt 214001
PO 00000
Frm 00102
Fmt 4703
Part 73
Sfmt 4703
E:\FR\FM\01JYN1.SGM
Same.
Same.
Same.
Same.
Same.
Same.
Same.
Same.
Same.
Same.
Same.
Same.
01JYN1
Agencies
[Federal Register Volume 73, Number 127 (Tuesday, July 1, 2008)]
[Notices]
[Pages 37501-37508]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-14342]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Biweekly Notice; Applications and Amendments to Facility
Operating Licenses Involving No Significant Hazards Considerations
I. Background
Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, as
amended (the Act), the U.S. Nuclear Regulatory Commission (the
Commission or NRC staff) is publishing this regular biweekly notice.
The Act requires the Commission publish notice of any amendments
issued, or proposed to be issued and grants the Commission the
authority to issue and make immediately effective any amendment to an
operating license upon a determination by the Commission that such
amendment involves no significant hazards consideration,
notwithstanding the pendency before the Commission of a request for a
hearing from any person.
This biweekly notice includes all notices of amendments issued, or
proposed to be issued from June 5, 2008, to June 18, 2008. The last
biweekly notice was published on June 17, 2008 (73 FR 34337).
Notice of Consideration of Issuance of Amendments to Facility Operating
Licenses, Proposed No Significant Hazards Consideration Determination,
and Opportunity for a Hearing
The Commission has made a proposed determination that the following
amendment requests involve no significant hazards consideration. Under
the Commission's regulations in 10 CFR 50.92, this means that operation
of the facility in accordance with the proposed amendment would not (1)
involve a significant increase in the probability or consequences of an
accident previously evaluated; or (2) create the possibility of a new
or different kind of accident from any accident previously evaluated;
or (3) involve a significant reduction in a margin of safety. The basis
for this proposed determination for each amendment request is shown
below.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a timely way would result,
for example in derating or shutdown of the facility. Should the
Commission take action prior to the expiration of either the comment
period or the notice period, it will publish in the Federal Register a
notice of issuance. Should the Commission make a final No Significant
Hazards Consideration Determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
Written comments may be submitted by mail to the Chief, Rulemaking,
Directives and Editing Branch, Division of Administrative Services,
Office of Administration, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, and should cite the publication date and
page number of this Federal Register notice. Written comments may also
be delivered to Room 6D44, Two White Flint North, 11545 Rockville Pike,
Rockville, Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays.
Copies of written comments received may be examined at the Commission's
Public Document Room (PDR), located at One White Flint North, Public
File Area O1F21, 11555 Rockville Pike (first floor), Rockville,
Maryland. The filing of requests for a hearing and petitions for leave
to intervene is discussed below.
Within 60 days after the date of publication of this notice,
person(s) may file a request for a hearing with respect to issuance of
the amendment to the subject facility operating license and any person
whose interest may be affected by this proceeding and who wishes to
participate as a party in the proceeding must file a written request
via electronic submission through the NRC E-Filing system for a hearing
and a petition for leave to intervene. Requests for a hearing and a
petition for leave to intervene shall be filed in accordance with the
Commission's ``Rules of Practice for Domestic Licensing Proceedings''
in 10 CFR part 2. Interested person(s) should consult a current copy of
10 CFR 2.309, which is available at the Commission's PDR, located at
One White Flint North, Public File Area 01F21, 11555 Rockville Pike
(first floor), Rockville, Maryland. Publicly available records will be
accessible from the Agencywide Documents Access and Management System's
(ADAMS) Public Electronic Reading Room on the Internet at the NRC Web
site, https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request
for a hearing or petition for leave to intervene is filed within 60
days, the Commission or a presiding officer designated by the
Commission or by the Chief Administrative Judge of the Atomic Safety
and Licensing Board Panel, will rule on the request and/or petition;
and the Secretary or the Chief Administrative Judge of the Atomic
Safety and Licensing Board will issue a notice of a hearing or an
appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address, and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
[[Page 37502]]
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also set forth the specific contentions which the petitioner/requestor
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
petitioner/requestor shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner/
requestor intends to rely in proving the contention at the hearing. The
petitioner/requestor must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
petitioner/requestor intends to rely to establish those facts or expert
opinion. The petition must include sufficient information to show that
a genuine dispute exists with the applicant on a material issue of law
or fact. Contentions shall be limited to matters within the scope of
the amendment under consideration. The contention must be one which, if
proven, would entitle the petitioner/requestor to relief. A petitioner/
requestor who fails to satisfy these requirements with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, and the Commission has not made a final
determination on the issue of no significant hazards consideration, the
Commission will make a final determination on the issue of no
significant hazards consideration. The final determination will serve
to decide when the hearing is held. If the final determination is that
the amendment request involves no significant hazards consideration,
the Commission may issue the amendment and make it immediately
effective, notwithstanding the request for a hearing. Any hearing held
would take place after issuance of the amendment. If the final
determination is that the amendment request involves a significant
hazards consideration, any hearing held would take place before the
issuance of any amendment.
A request for hearing or a petition for leave to intervene must be
filed in accordance with the NRC E-Filing rule, which the NRC
promulgated in August 28, 2007 (72 FR 49139). The E-Filing process
requires participants to submit and serve documents over the internet
or in some cases to mail copies on electronic storage media.
Participants may not submit paper copies of their filings unless they
seek a waiver in accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
five (5) days prior to the filing deadline, the petitioner/requestor
must contact the Office of the Secretary by e-mail at
hearingdocket@nrc.gov, or by calling (301) 415-1677, to request (1) a
digital ID certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and/or (2)
creation of an electronic docket for the proceeding (even in instances
in which the petitioner/requestor (or its counsel or representative)
already holds an NRC-issued digital ID certificate). Each petitioner/
requestor will need to download the Workplace Forms
Viewer(TM) to access the Electronic Information Exchange
(EIE), a component of the E-Filing system. The Workplace Forms
Viewer(tm) is free and is available at https://www.nrc.gov/
site-help/e-submittals/install-viewer.html. Information about applying
for a digital ID certificate is available on NRC's public Web site at
https://www.nrc.gov/site-help/e-submittals/apply-certificates.html.
Once a petitioner/requestor has obtained a digital ID certificate,
had a docket created, and downloaded the EIE viewer, it can then submit
a request for hearing or petition for leave to intervene. Submissions
should be in Portable Document Format (PDF) in accordance with NRC
guidance available on the NRC public Web site at https://www.nrc.gov/
site-help/e-submittals.html. A filing is considered complete at the
time the filer submits its documents through EIE. To be timely, an
electronic filing must be submitted to the EIE system no later than
11:59 p.m. Eastern Time on the due date. Upon receipt of a
transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
EIE system also distributes an e-mail notice that provides access to
the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically may seek assistance through the
``Contact Us'' link located on the NRC Web site at https://www.nrc.gov/
site-help/e-submittals.html or by calling the NRC technical help line,
which is available between 8:30 a.m. and 4:15 p.m., Eastern Time,
Monday through Friday. The help line number is (800) 397-4209 or
locally, (301) 415-4737.
Participants who believe that they have a good cause for not
submitting documents electronically must file a motion, in accordance
with 10 CFR 2.302(g), with their initial paper filing requesting
authorization to continue to submit documents in paper format. Such
filings must be submitted by: (1) First class mail addressed to the
Office of the Secretary of the Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier, express mail, or expedited
delivery service to the Office of the Secretary, Sixteenth Floor, One
White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852,
Attention: Rulemaking and Adjudications Staff. Participants filing a
document in this manner are responsible for serving the document on all
other participants. Filing is considered complete by first-class mail
as of the time of deposit in the mail, or by courier, express mail, or
expedited delivery service upon depositing the document with the
provider of the service.
Non-timely requests and/or petitions and contentions will not be
entertained absent a determination by the Commission, the presiding
officer, or the Atomic Safety and Licensing Board that the petition
and/or request should be granted and/or the contentions should be
admitted, based on a balancing of the factors specified in 10 CFR
2.309(c)(1)(i)-(viii). To be timely, filings must be submitted no later
than 11:59 p.m. Eastern Time on the due date.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
https://ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant
to an order of the Commission, an Atomic Safety and Licensing Board, or
a Presiding Officer. Participants are requested not to include
[[Page 37503]]
personal privacy information, such as social security numbers, home
addresses, or home phone numbers in their filings. With respect to
copyrighted works, except for limited excerpts that serve the purpose
of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submission.
For further details with respect to this amendment action, see the
application for amendment which is available for public inspection at
the Commission's PDR, located at One White Flint North, Public File
Area 01F21, 11555 Rockville Pike (first floor), Rockville, Maryland.
Publicly available records will be accessible from the ADAMS Public
Electronic Reading Room on the Internet at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html. If you do not have access to ADAMS
or if there are problems in accessing the documents located in ADAMS,
contact the PDR Reference staff at 1 (800) 397-4209, (301) 415-4737 or
by e-mail to pdr@nrc.gov.
Entergy Nuclear Operations, Inc., Docket No. 50-333, James A.
FitzPatrick Nuclear Power Plant (JAFNPP), Oswego County, New York
Date of amendment request: April 22, 2008.
Description of amendment request: The proposed amendment would
modify Technical Specification (TS) 1.0, ``Definitions'', Limiting
Conditions for Operation and Surveillance Requirement Applicability
Section 3.4.9, ``RCS [Reactor Coolant System] Pressure and Temperature
(P/T) Limits'', and Section 5.0, ``Administrative Controls'' to delete
reference to the pressure and temperature curves, and include reference
to the Pressure and Temperature Limits Report (PTLR). This proposed
change would adopt the methodology of SIR-05-044-A, ``Pressure-
Temperature Limits Report Methodology for Boiling Water Reactors,'' for
preparation of the pressure and temperature curves, and incorporate the
guidance of TSTF-419-A, ``Revise PTLR Definition and References in ISTS
[Improved Standard Technical Specifications] 5.6.6, RCS PTLR.''
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change modifies Technical Specifications (TS)
Section 1.0 (``Definitions''), Limiting Conditions for Operation and
Surveillance Requirement Applicability Section 3.4.9 (``RCS Pressure
and Temperature (P/T) Limits''), and 5.0 (``Administrative
Controls''), to delete reference to the pressure and temperature
curves and include reference to the Pressure and Temperature Limits
Report (PTLR). This change adopts the methodology of SIR-05-044-A,
``Pressure-Temperature Limits Report Methodology for Boiling Water
Reactors'', dated April 2007 for preparation of the pressure and
temperature curves, and incorporates the guidance of TSTF-419-A
(``Revised PTLR Definition and References in ISTS 5.6.6, RCS
PTLR''). In an NRC Safety Evaluation Report dated February 6, 2007,
``the NRC staff has found that SIR-05-044 is acceptable for
referencing in licensing applications for General Electric-designed
boiling water reactors to the extent specified and under the
limitations delineated in the TR [Topical Report] and in the
enclosed final SE [Safety Evaluation]''. As part of this change, the
JAF Pressure and Temperature Limits Report (PTLR) based on the
methodology and template provided in SIR-05-044-A is being supplied
for review. The pressure and temperature curves utilize the
methodology of SIR-05-044-A.
The NRC has established requirements in Appendix G to 10 CFR
[Part] 50 in order to protect the integrity of the reactor coolant
pressure boundary (RCPB) in nuclear power plants. Additionally, the
regulation in 10 CFR Part 50, Appendix H, provides the NRC staff's
criteria for the design and implementation of RPV material
surveillance programs for operating lightwater reactors.
Implementing this NRC approved methodology does not reduce the
ability to protect the reactor coolant pressure boundary as
specified in Appendix G, nor will this change increase the
probability of malfunction of plant equipment, or the failure of
plant structures, systems, or components. Incorporation of the new
methodology for calculating P-T curves, and the relocation of the P-
T curves from the TS to the PTLR provides an equivalent level of
assurance that the RCPB is capable of performing its intended safety
functions. Therefore, the proposed change does not involve a
significant increase in the probability or consequences of an
accident previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed change does not affect the assumed accident
performance of the RCPB, nor any plant structure, system, or
component previously evaluated. The proposed change does not involve
the installation of new equipment, and installed equipment is not
being operated in a new or different manner. The change in
methodology ensures that the RCPB remains capable of performing its
safety functions. No set points are being changed which would alter
the dynamic response of plant equipment. Accordingly, no new failure
modes are introduced which could introduce the possibility of a new
or different kind of accident from any previously evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
The proposed change does not affect the function of the RCPB or
its response during plant transients. There are no changes proposed
which alter the set points at which protective actions are
initiated, and there is no change to the operability requirements
for equipment assumed to operate for accident mitigation. This
change adopts the methodology of SIR-05-044-A, ``Pressure-
Temperature Limits Report Methodology for Boiling Water Reactors'',
dated April 2007 for preparation of the pressure and temperature
curves. Therefore, the proposed change does not involve a
significant reduction in a margin of safety.
This change adopts the methodology of SIR-05-044-A, ``Pressure-
Temperature Limits Report Methodology for Boiling Water Reactors'',
dated April 2007 for preparation of the pressure and temperature
curves, and incorporates the guidance of TSTF-419-A (``Revise PTLR
Definition and References in ISTS 5.6.6, RCS PTLR''). In an NRC
Safety Evaluation Report dated February 6, 2007, the NRC staff has
found that SIR-05-044 is acceptable for referencing in licensing
applications for General Electric-designed boiling water reactors.''
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Mr. William C. Dennis, Assistant General
Counsel, Entergy Nuclear Operations, Inc., 440 Hamilton Avenue, White
Plains, NY 10601.
NRC Branch Chief: Mark G. Kowal.
Entergy Nuclear Operations, Inc., Docket Nos. 50-247 and 50-286, Indian
Point Nuclear Generating Unit Nos. 2 and 3, Westchester County, New
York
Date of amendment request: March 13, 2008.
Description of amendment request: The proposed amendment would
revise the Updated Final Safety Analysis Reports (UFSARs) for Indian
Point Nuclear Generating Unit Nos. 2 and 3 to reflect a revised
Emergency Core Cooling System (ECCS) and Component Cooling Water System
(CCWS) single passive failure analysis and the recirculation phase
backup capability.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the
[[Page 37504]]
issue of no significant hazards consideration, which is presented
below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The probabilities of accidents previously evaluated are based on
the probability of initiating events for these accidents.
The proposed changes to the ECCS and CCWS (Unit 2 only) passive
failure and recirculation phase backup capability licensing basis do
not have any impact on the integrity of any plant system, structure
or component that initiates an analyzed event. The ECCS system and
the CCWS are accident mitigating systems under these conditions and
therefore cannot cause accidents. Thus the probability of any
accident previously evaluated is not significantly increased.
The consequences of accidents previously evaluated are
determined by the results of analyses that are based on plant
initial conditions, the type of accident, plant response, and the
operation and potential failure of equipment and systems. Because a
passive failure within 24 hours of the initiating event is not a
credible failure, the ECCS and the CCWS (Unit 2 only) will continue
to operate as required for accident mitigation. Therefore, the
consequences of the accident are not significantly impacted by this
proposed change.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
New or different kinds of accidents can only be created by new
or different accident initiators or sequences. The proposed changes
do not create any new or different accident initiators because these
changes do not cause failures of equipment or accident sequences
different from those previously evaluated. The ECCS and CCWS (Unit 2
only) systems affected by the changes are used to mitigate the
consequences of an accident that has already occurred. The proposed
UFSAR changes do not significantly affect the mitigative function of
these systems. No new failure mechanisms will be introduced by the
proposed changes. The changes do not result in any event previously
deemed incredible being made credible. Therefore, plant operation in
accordance with the proposed changes will not create the possibility
of a new or different [kind] of accident from any accident
previously evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
The proposed amendment does not involve a significant reduction
in a margin of safety. The proposed changes do not adversely affect
plant safety limits, set points, or design parameters.
The proposed changes assure that the ECCS, and Containment Spray
recirculation functions can be adequately accomplished. The proposed
changes do not have any impact on the integrity of any plant system,
structure or component that initiates an analyzed event. The
proposed changes do revise the ECCS and CCWS (Unit 2 only) licensing
basis. The revised licensing bases were appropriately evaluated to
ensure that there was no significant reduction in the margin of
safety. The ECCS and CCWS will continue to provide accident
mitigation capability.
Therefore, the proposed change will not create a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Mr. William C. Dennis, Assistant General
Counsel, Entergy Nuclear Operations, Inc., 440 Hamilton Avenue, White
Plains, NY 10601.
NRC Branch Chief: Mark G. Kowal.
Exelon Generation Company, LLC, Docket Nos. STN 50-456 and STN 50-457,
Braidwood Station, Units 1 and 2, Will County, Illinois
Docket Nos. STN 50-454 and STN 50-455, Byron Station, Unit Nos. 1 and
2, Ogle County, Illinois
Date of amendment request: April 9, 2008.
Description of amendment request: The proposed amendments would
revise Technical Specifications (TSs) 5.5.6, ``Pre-Stressed Concrete
Containment Tendon Surveillance Program,'' and 5.6.8, ``Tendon
Surveillance Report,'' for consistency with the requirements of Title
10 Code of Federal Regulations (10 CFR) section 50.55a, ``Codes and
standards,'' paragraph (g)(4) for components classified as American
Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME
Code) Class CC. Specifically, the proposed changes would replace or
delete the reference to the specific ASME Code year for the tendon
surveillance program with a requirement to use the applicable ASME Code
and addenda as required by 10 CFR 50.55a(g)(4).
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change revises the TS administrative controls
program for consistency with the requirements of 10 CFR 50.55a(g)(4)
for components classified as Code Class CC.
The revised requirements do not affect the function of the
containment post-tensioning system components. The post-tensioning
systems are passive components whose failure modes could not act as
accident initiators or precursors. The proposed change does not
impact the physical configuration or function of plant structures,
systems, or components (SSCs) or the manner in which SSCs are
operated, maintained, modified, tested, or inspected. The proposed
change does not impact the initiators or assumptions of analyzed
events, nor does it impact the mitigation of accidents or transient
events.
The proposed change does not impact any accident initiators or
analyzed events or assumed mitigation of accident or transient
events. It does not involve the addition or removal of any
equipment, or any design changes to the facility.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed change revises the TS administrative controls
program for consistency with the requirements of 10 CFR 50.55a(g)(4)
for components classified as Code Class CC.
The function of the containment post-tensioning system
components is not altered by this change. The proposed change does
not involve a modification to the physical configuration of the
plant (i.e., no new equipment will be installed) or change in the
methods governing normal plant operation. The proposed change will
not impose any new or different requirements or introduce a new
accident initiator, accident precursor, or malfunction mechanism.
Additionally, there is no change in the types or increases in the
amounts of any effluent that may be released off-site and there is
no increase in individual or cumulative occupational exposure.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
The proposed change revises the TS administrative controls
program requirements for consistency with the requirements of 10 CFR
50.55a(g)(4) for components classified as Code Class CC.
The function of the containment post-tensioning system
components are not altered by this change. The change is conforming
and administrative in nature in that it will allow the TS to be
updated to refer to the most recently approved edition of the ASME
Boiler and Pressure Vessel Code Subsection IWL. The safety function
of the containment as a fission product barrier will be maintained.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
[[Page 37505]]
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
Attorney for licensee: Mr. Bradley J. Fewell, Associate General
Counsel, Exelon Generation Company, LLC, 4300 Winfield Road,
Warrenville, IL 60555.
NRC Branch Chief: Russell Gibbs.
Exelon Generation Company, LLC, Docket Nos. 50-352 and 50-353, Limerick
Generating Station, Units 1 and 2, Montgomery County, Pennsylvania
Date of amendment request: November 13, 2007.
Description of amendment request: The proposed changes delete
footnotes from technical specification (TS) Surveillance Requirement
(SR) 4.4.1.2, regarding the reactor coolant system jet pumps, which
require using data recorded from the original startup test program as a
baseline for evaluating jet pump performance in accordance with the TS
SR. Due to physical changes in plant configuration, the original
baseline data may not reflect the most current performance
characteristics of the jet pumps, and hence, its use could impact the
accuracy of the TS SR results. This change provides the flexibility to
re-establish baseline characteristics when warranted.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below, with NRC staff edits in
brackets:
1. Do the proposed changes involve a significant increase in the
probability or consequences of an accident previously evaluated?
Response: No.
The proposed changes provide the ability to re-establish
recirculation pump flow, core flow, or diffuser-to-lower plenum
differential pressure characteristics, provided as the basis for
performing the Technical Specification (TS) jet pump surveillances,
based on physical changes to the plant that could affect the
accuracy of the TS SR required comparison. The proposed changes do
not impact the physical configuration or function of plant
structures, systems, or components (SSCs) or the manner in which
SSCs are operated, maintained, modified, or inspected [with the
exception of a periodic re-baseline of the jet pump test acceptance
criteria]. The proposed changes do not impact the initiators or
assumptions of analyzed events, nor do they impact mitigation of
accidents or transient events. [The proposed changes will continue
to ensure that potential jet pump degradation is detected prior to
failure and, as a result, ensure that the current margin of safety
is maintained during postulated accidents].
Therefore, the proposed changes do not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Do the proposed changes create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed changes provide the ability to re-establish
recirculation pump flow, core flow, or diffuser-to-lower plenum
differential pressure patterns or characteristics, provided as the
basis for performing the TS jet pump surveillances, based on
physical changes to the plant that could affect the accuracy of the
TS SR required comparison. The proposed changes do not alter plant
configuration, require that new plant equipment be installed, alter
assumptions made about accidents previously evaluated, or impact the
function of plant SSCs or the manner in which SSCs are operated,
maintained, modified, or inspected [with the exception of a periodic
re-baseline of the jet pump test acceptance criteria].
Therefore, the proposed changes do not create the possibility of
a new or different kind of accident from any accident previously
evaluated.
3. Do the proposed changes involve a significant reduction in a
margin of safety?
Response: No.
The proposed changes provide the ability to re-establish
recirculation pump flow, core flow, or diffuser-to-lower plenum
differential pressure patterns or characteristics, provided as the
basis for performing the TS jet pump surveillances, based on
physical changes to the plant that could affect the accuracy of the
TS SR required comparison. The proposed changes do not involve any
physical changes to plant SSCs or the manner in which SSCs are
operated, maintained, modified, or inspected [with the exception of
a periodic re-baseline of the jet pump test acceptance criteria].
The proposed changes do not involve a change to any safety limits,
limiting safety system settings, limiting conditions of operation,
or design parameters for any SSC. The proposed changes do not impact
any safety analysis assumptions and do not involve a change in
initial conditions, system response times, or other parameters
affecting an accident analysis. [The proposed changes will continue
to ensure that potential jet pump degradation is detected prior to
failure and, as a result, ensure that the current margin of safety
is maintained during postulated accidents.]
Therefore, the proposed changes do not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, with the changes noted above, it appears that the three
standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff
proposes to determine that the amendment request involves no
significant hazards consideration.
Attorney for licensee: J. Bradley Fewell, Esquire, Associate
General Counsel, Exelon Generation Company, LLC, 4300 Winfield Road,
Warrenville, IL 60555.
NRC Branch Chief: Harold K. Chernoff.
Southern Nuclear Operating Company, Inc., Docket Nos. 50-348 and 50-
364, Joseph M. Farley Nuclear Plant, Units 1 and 2, Houston County,
Alabama
Southern Nuclear Operating Company, Inc., Georgia Power Company,
Oglethorpe Power Corporation, Municipal Electric Authority of Georgia,
City of Dalton, Georgia, Docket Nos. 50-321 and 50-366; Edwin I. Hatch
Nuclear Plant, Units 1 and 2, Appling County, Georgia
Southern Nuclear Operating Company, Inc., Docket Nos. 50-424 and 50-
425; Vogtle Electric Generating Plant, Units 1 and 2, Burke County,
Georgia
Date of amendment request: June 12, 2008.
Description of amendment request: The proposed amendments would
revise the current Technical Specifications (TS) 5.2.2.f for the
Farley, Hatch and Vogtle plants to require either the Operations
Manager or at least one Operations Superintendent to hold a Senior
Reactor Operator (SRO) license and to provide conforming changes to TS
5.3. An application that addressed only the TS 5.2.2.f issue was
submitted on July 17, 2007, and notice of that application was provided
in the Federal Register on September 25, 2007, for Farley (72 FR 5480),
Hatch (72 FR 54481), and Vogtle (72 FR 54482). Due to changes in the
June 12, 2008 application from those proposed in the July 17, 2007
application, the changed application is being renoticed in its
entirety. This notice supersedes the previous notice published in the
Federal Register on September 25, 2007.
Basis for proposed no significant hazards consideration
determination: As required by 10 CFR 50.91(a), the licensee has
provided its analysis of the issue of no significant hazards
consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change to TS 5.2 revises the requirement concerning
the Operations management position that must hold an SRO license. At
least one Operations Superintendent or the Operations Manager will
continue to maintain an SRO license. The proposed change to TS 5.3.1
is a clarification regarding the qualifications of
[[Page 37506]]
the Operations Manager. This clarification states that TS 5.2.2.f
specifies the requirements for the Operations Manager regarding the
holding of an SRO license. The training, qualification and
experience requirements for Operations management personnel will
continue to satisfy the Unit Staff Qualifications as described in
the applicable TS 5.3.1.
This change does not impact any accident initiators or analyzed
events. It does not impact any assumed mitigation capability for any
accident or transient event. The change does not involve the
addition or removal of any equipment or any design changes to the
facility. As the proposed change is administrative in nature,
operation of the facility in accordance with the proposed amendment
does not involve a significant increase in the probability or
consequences of an accident previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
Response: No.
The proposed change to TS 5.2 revises the requirement concerning
the Operations management position that must hold an SRO license. At
least one Operations Superintendent or the Operations Manager will
continue to maintain an SRO license. The proposed change to TS 5.3.1
is a clarification regarding the qualifications of the Operations
Manager. This clarification states that TS 5.2.2.f specifies the
requirements for the Operations Manager regarding the holding of an
SRO license. The training, qualification and experience requirements
for Operations management personnel will continue to satisfy the
Unit Staff Qualifications as described in the applicable TS 5.3.1.
This change does not involve any physical modifications to plant
structures, systems, or components (SSCs), or the manner in which
SSCs are operated, maintained, modified, tested, or inspected. In
addition, there is no change in the types or increases in the
amounts of effluents that may be released offsite, and there is no
increase in individual or cumulative occupational radiation
exposure. As the proposed change is administrative in nature,
operation of the facility in accordance with the proposed amendment
does not create the possibility of a new or different kind of
accident from any accident previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
Response: No.
The proposed change to TS 5.2 revises the requirement concerning
the Operations management position that must hold an SRO license. At
least one Operations Superintendent or the Operations Manager will
continue to maintain an SRO license. The subject Operations
Superintendent will be qualified to fill the Operations Manager
position and have the same management authority over licensed
operators as the Operations Manager. The proposed change to TS 5.3.1
is a clarification regarding the qualifications of the Operations
Manager. This clarification states that TS 5.2.2.f specifies the
requirements for the Operations Manager regarding the holding of an
SRO license. The training, qualification and experience requirements
for Operations management personnel will continue to satisfy the
Unit Staff Qualifications as described in the applicable TS 5.3.1.
This change does not involve any physical modifications to SSCs,
or the manner in which SSCs are operated, maintained, modified,
tested, or inspected. The change does not alter the manner in which
safety limits, limiting safety system settings, or limiting
conditions for operation are determined. The setpoints at which
protective actions are initiated are not altered by the change. As
the proposed change is administrative in nature, operation of the
facility in accordance with the proposed amendment does not involve
a significant reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied.
Therefore, the NRC staff proposes to determine that the amendment
request involves no significant hazards consideration.
Attorney for licensee: Farley: M. Stanford Blanton, Esq., Balch and
Bingham, Post Office Box 306, 1710 Sixth Avenue North, Birmingham,
Alabama 35201; Hatch: Ernest L. Blake, Jr., Esquire, Shaw, Pittman,
Potts and Trowbridge, 2300 N Street, NW., Washington, DC 20037; Vogtle:
Mr. Arthur H. Domby, Troutman Sanders, NationsBank Plaza, Suite 5200,
600 Peachtree Street, NE., Atlanta, Georgia 30308-2216.
NRC Branch Chief: Melanie C. Wong.
Previously Published Notices of Consideration of Issuance of Amendments
to Facility Operating Licenses, Proposed No Significant Hazards
Consideration Determination, and Opportunity for a Hearing
The following notices were previously published as separate
individual notices. The notice content was the same as above. They were
published as individual notices either because time did not allow the
Commission to wait for this biweekly notice or because the action
involved exigent circumstances. They are repeated here because the
biweekly notice lists all amendments issued or proposed to be issued
involving no significant hazards consideration.
For details, see the individual notice in the Federal Register on
the day and page cited. This notice does not extend the notice period
of the original notice.
Dominion Nuclear Connecticut, Inc., Docket Nos. 50-336 and 50-423,
Millstone Power Station, Unit Nos. 2 and 3, New London County,
Connecticut
Date of amendment request: July 13, 2007.
Brief description of amendment request: The proposed amendment
would modify the Technical Specifications (TSs) and facility operating
licenses in response to the application dated July 13, 2007, as
supplemented by letters dated December 7, 2007, March 5 and 25, 2008,
and April 28, 2008. The proposed amendment would establish more
effective and appropriate action, surveillance, and administrative
requirements related to ensuring the habitability of the control room
envelope in accordance with the Commission-approved TS Task Force
(TSTF) Standard Technical Specification change traveler TSTF-448,
Revision 3, ``Control Room Habitability.'' Additionally, the proposed
amendment would change the ``irradiated fuel movement'' terminology and
adopt ``movement of recently irradiated fuel assemblies'' terminology
consistent with TSTF-448, Revision 3.
Date of publication of individual notice in Federal Register: May
16, 2008 (73 FR 28534).
Expiration dates of individual notice: June 16, 2008 (Public
comments) and July 15, 2008 (Hearing requests).
Florida Power and Light Company, et al., Docket No. 50-389, St.
Lucie Plant, Unit No. 2, St. Lucie County, Florida
Date of amendment request: July 16, 2007, as supplemented June 2,
2008.
Description of amendment request: To modify the operating licensing
bases to adopt the alternative source term as allowed in 10 CFR 50.67
and described in Regulatory Guide 1.183. The licensee proposes to
revise the licensing basis through reanalysis of the following
radiological consequences of the Updated Final Safety Analysis Report
Chapter 15 accidents: Loss-of-Coolant Accident, Fuel-Handling Accident,
Main Steam Line Break, Steam Generator Tube Rupture, Reactor Coolant
Pump Shaft Seizure, Control Element Assembly Ejection, and Inadvertent
Opening of a Main Steam Safety Valve.
Date of publication of individual notice in the Federal Register:
June 12, 2008 (73 FR 33460).
Expiration date of individual notice: July 14, 2008 (comments) and
August 11, 2008 (hearing).
[[Page 37507]]
Notice of Issuance of Amendments to Facility Operating Licenses
During the period since publication of the last biweekly notice,
the Commission has issued the following amendments. The Commission has
determined for each of these amendments that the application complies
with the standards and requirements of the Atomic Energy Act of 1954,
as amended (the Act), and the Commission's rules and regulations. The
Commission has made appropriate findings as required by the Act and the
Commission's rules and regulations in 10 CFR Chapter I, which are set
forth in the license amendment.
Notice of Consideration of Issuance of Amendment to Facility
Operating License, Proposed No Significant Hazards Consideration
Determination, and Opportunity for a Hearing in connection with these
actions was published in the Federal Register as indicated.
Unless otherwise indicated, the Commission has determined that
these amendments satisfy the criteria for categorical exclusion in
accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be
prepared for these amendments. If the Commission has prepared an
environmental assessment under the special circumstances provision in
10 CFR 51.22(b) and has made a determination based on that assessment,
it is so indicated.
For further details with respect to the action see (1) the
applications for amendment, (2) the amendment, and (3) the Commission's
related letter, Safety Evaluation and/or Environmental Assessment as
indicated. All of these items are available for public inspection at
the Commission's Public Document Room (PDR), located at One White Flint
North, Public File Area 01F21, 11555 Rockville Pike (first floor),
Rockville, Maryland. Publicly available records will be accessible from
the Agencywide Documents Access and Management Systems (ADAMS) Public
Electronic Reading Room on the internet at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html. If you do not have access to ADAMS
or if there are problems in accessing the documents located in ADAMS,
contact the PDR Reference staff at 1 (800) 397-4209, (301) 415-4737 or
by e-mail to pdr@nrc.gov.
Carolina Power & Light Company, et al., Docket No. 50-400, Shearon
Harris Nuclear Power Plant, Unit 1, Wake and Chatham Counties, North
Carolina
Date of application for amendment: June 15, 2007, as supplemented
by letter dated March 6, 2008.
Brief description of amendment: This amendment relocates the
Inservice Testing (IST) requirements to the administrative section of
the Technical Specifications (TSs), removes the Inservice Inspection
(ISI) requirements from the TSs, and establishes a TS Bases Control
Program. Specifically, the amendment deletes TS 4.0.5, relocates the
IST requirements to section 6 of the TSs as a separate program, and
establishes a TS Bases Control Program consistent with NUREG-1431,
Revision 3.0, ``Standard Technical Specifications--Westinghouse
Plants.'' This amendment supports the third 10-year intervals of the
ISI and IST programs at the Shearon Harris Nuclear Plant, Unit 1.
Date of issuance: June 12, 2008.
Effective date: Effective as of the date of issuance and shall be
implemented within 60 days.
Amendment No.: 127.
Operating License No. NPF-63: The amendment revises the TSs and
Facility Operating License.
Date of initial notice in Federal Register: July 31, 2007 (72 FR
41782).
Public comments requested as to proposed no significant hazards
consideration: No.
The Commission's related evaluation of the amendment is contained
in a safety evaluation dated June 12, 2008.
Attorney for licensee: David T. Conley, Associate General Counsel
II--Legal Department, Progress Energy Service Company, LLC, Post Office
Box 1551, Raleigh, North Carolina 27602-1551.
NRC Branch Chief: Thomas H. Boyce.
Entergy Nuclear Operations, Inc., Docket No. 50-286, Indian Point
Nuclear Generating Unit No. 3, Westchester County, New York
Date of application for amendment: February 28, 2008.
Brief description of amendment: The amendment revises the
containment buffering agent used for pH control under post loss-of-
coolant accident (LOCA) conditions, from sodium hydroxide to sodium
tetraborate.
Date of issuance: June 9, 2008.
Effective date: As of the date of issuance, and shall be
implemented within 60 days.
Amendment No.: 236.
Facility Operating License Nos. DPR-64: The amendment revised the
License and the Technical Specifications.
Date of initial notice in Federal Register: April 8, 2008 (73 FR
19109).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated June 9, 2008.
No significant hazards consideration comments received: No.
Entergy Nuclear Operations, Inc., Docket Nos. 50-247 and 50-286, Indian
Point Nuclear Generating Unit Nos. 2 and 3, Westchester County, New
York
Date of application for amendment: December 20, 2007.
Brief description of amendment: The amendments revise the Technical
Specifications (TSs) associated with the definition of E Bar and
Reactor Coolant System (RCS) Specific Activity consistent with Revision
0 to the TS Task force (TSTF) Standard Technical Specification Change
Document TSTF-490, ``Deletion of E Bar Definition and Revision to RCS
Specific Activity Tech Spec.''
Date of issuance: June 17, 2008.
Effective date: As of the date of issuance, and shall be
implemented within 60 days.
Amendment Nos.: 254 and 237.
Facility Operating License Nos. DPR-26 and DPR-64: The amendment
revised the License and the Technical Specifications.
Date of initial notice in Federal Register: March 25, 2008 (73 FR
15786).
The Commission's related evaluation of the amendment is contained
in a Safety Evaluation dated June 17, 2008.
No significant hazards consideration comments received: No.
Virginia Electric and Power Company, et al., Docket Nos. 50-280 and 50-
281, Surry Power Station, Unit Nos. 1 and 2, Surry County, Virginia
Date of application for amendments: June 25, 2007, as supplemented
on November 14, 2007, January 10, and April 11, 2008.
Brief description of amendments: These amendments increased the
maximum Technical Specification (TS) service water (SW) temperature
limit from 95 [deg]F to 100 [deg]F, and revised the TS Figure 3.8-1,
which provides the allowable containment air partial pressure versus SW
temperature.
Date of issuance: June 17, 2008.
Effective date: As of the date of issuance and shall be implemented
within 30 days.
Amendment Nos.: 259 and 259.
Renewed Facility Operating License Nos. DPR-32 and DPR-37:
Amendments
[[Page 37508]]
changed the licenses and the technical specifications.
Date of initial notice in Federal Register: July 17, 2007 (72 FR
39084).
The supplements dated November 14, 2007, January 10 and April 11,
2008, provided additional information that clarified the application,
did not expand the scope of the application as originally noticed, and
did not change the staff's original proposed no significant hazards
consideration determination.
The Commission's related evaluation of the amendments is contained
in a Safety Evaluation dated June 17, 2008.
No significant hazards consideration comments received: No.
Dated at Rockville, Maryland, this 18th day of June, 2008.
For the Nuclear Regulatory Commission.
Timothy J. McGinty,
Acting Director, Division of Operating Reactor Licensing, Office of
Nuclear Reactor Regulation.
[FR Doc. E8-14342 Filed 6-30-08; 8:45 am]
BILLING CODE 7590-01-P