Williston Basin Interstate Pipeline Company; Notice of Availability of the Environmental Assessment for the Proposed Sheyenne Expansion Project, 36858-36859 [E8-14687]
Download as PDF
36858
Federal Register / Vol. 73, No. 126 / Monday, June 30, 2008 / Notices
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8–14790 Filed 6–27–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR08–11–000]
Nexen Marketing U.S.A. Inc.
Complainant, v. Enbridge Pipelines
(North Dakota) LLC, Respondent;
Notice of Complaint
jlentini on PROD1PC65 with NOTICES
June 20, 2008.
Take notice that on June 18, 2008,
Nexen Marketing U.S.A. Inc. (Nexen)
filed a formal complaint against
Enbridge Pipelines (North Dakota) LLC
(Enbridge North Dakota), pursuant to
Rule 206 of the Rules of Practice and
Procedures of the Commission’s
regulations, 18 CFR 385.206. Nexen
alleges that Enbridge North Dakota has
unfairly and unreasonably imposed
penalties that substantially reduce the
quantity of crude oil that Nexen is able
to ship on its pipeline. Nexen alleges
that a force majeure event occurred and
Enbridge North Dakota’s interpretation
and application of the force majeure
VerDate Aug<31>2005
16:15 Jun 27, 2008
Jkt 214001
provision of its tariff was unjust and
unreasonable and violated its obligation
under the Interstate Commerce Act to
treat shippers in a just, reasonable and
nondiscriminatory manner.
Nexen certifies that copies of the
complaint were served on the issuing
officer of Enbridge North Dakota’s tariff.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of Respondent’s
answer, protests and interventions in
lieu of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on July 18, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–14684 Filed 6–27–08; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–89–000]
Williston Basin Interstate Pipeline
Company; Notice of Availability of the
Environmental Assessment for the
Proposed Sheyenne Expansion Project
June 20, 2008.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) of the
Sheyenne Expansion Project proposed
by Williston Basin Interstate Pipeline
Company (Williston Basin) in the abovereferenced docket.
The EA was prepared to satisfy the
requirements of the National
Environmental Policy Act. The FERC
staff concludes that approval of the
proposed project, with appropriate
mitigating measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
The EA assesses the potential
environmental effects of the
construction and operation of Williston
Basin’s proposed Sheyenne Expansion
Project (Project), consisting of the new
Steele Compressor Station in Kidder
County, North Dakota; installation of
additional compression at the existing
Bismarck Compressor Station in
Burleigh County, North Dakota; minor
modifications to the existing Cleveland
Compressor Station in Stutsman
County, North Dakota; and construction
and operation of approximately 6,400
feet of 8-inch-diameter pipeline lateral
and metering facilities to connect to the
proposed Tharaldson Ethanol Plant in
Cass County, North Dakota.
The EA has been placed in the public
files of the FERC. A limited number of
copies of the EA are available for
distribution and public inspection at:
Federal Energy Regulatory Commission,
Public Reference Room, 888 First Street,
NE., Room 2A, Washington, DC 20426,
(202) 502–8371.
Copies of the EA have been mailed to
federal, state, and local agencies,
interested individuals, newspapers,
libraries, and parties to this proceeding.
Any person wishing to comment on the
EA may do so. To ensure consideration
prior to a Commission decision on the
proposal, it is important that we receive
your comments before the date specified
below.
You can make a difference by
providing us with your specific
comments or concerns about the Project.
Your comments should focus on the
E:\FR\FM\30JNN1.SGM
30JNN1
jlentini on PROD1PC65 with NOTICES
Federal Register / Vol. 73, No. 126 / Monday, June 30, 2008 / Notices
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send in your comments
so that they will be received in
Washington, DC on or before July 21,
2008.
For your convenience, there are three
methods in which you can use to submit
your comments to the Commission. In
all instances please reference the project
docket number CP08–89–000 with your
submission. The docket number can be
found on the front of this notice. The
Commission encourages electronic filing
of comments and has dedicated eFiling
expert staff available to assist you at
202–502–8258 or efiling@ferc.gov.
(1) You may file your comments
electronically by using the Quick
Comment feature, which is located on
the Commission’s internet Web site at
https://www.ferc.gov under the link to
Documents and Filings. A Quick
Comment is an easy method for
interested persons to submit text-only
comments on a project;
(2) You may file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s internet Web site at
https://www.ferc.gov under the link to
Documents and Filings. eFiling involves
preparing your submission in the same
manner as you would if filing on paper,
and then saving the file on your
computer’s hard drive. You will attach
that file as your submission. New
eFiling users must first create an
account by clicking on ‘‘Sign up’’ or
‘‘eRegister’’. You will be asked to select
the type of filing you are making. A
comment on a particular project is
considered a ‘‘Comment on a Filing;’’ or
(3) You may file your comments via
mail to the Commission by sending an
original and two copies of your letter to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First St., NE, Room 1A, Washington, DC
20426;
Label one copy of the comments for
the attention of Gas Branch 3, PJ11.3.
Comments will be considered by the
Commission but will not serve to make
the commentor a party to the
proceeding. Any person seeking to
become a party to the proceeding must
file a motion to intervene pursuant to
Rule 214 of the Commission’s Rules of
Practice and Procedures (18 CFR
385.214).1 Only intervenors have the
1 Interventions may also be filed electronically via
the Internet in lieu of paper. See the previous
discussion on filing comments electronically.
VerDate Aug<31>2005
16:15 Jun 27, 2008
Jkt 214001
right to seek rehearing of the
Commission’s decision.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
comments considered.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (www.ferc.gov) using
the eLibrary link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number excluding the
last three digits in the Docket Number
field. Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at 1–866–208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries and direct links to the
documents. Go to www.ferc.gov/
esubscribenow.htm.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–14687 Filed 6–27–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–403–000]
Wyoming Interstate Company, Ltd;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Piceance Compression
Expansion Project and Request for
Comments on Environmental Issues
June 20, 2008.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Wyoming Interstate Company, Ltd.
(WIC) involving construction and
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
36859
operation of facilities by WIC in Rio
Blanco County and Moffat County,
Colorado.
This notice announces the opening of
the scoping process we will use to
gather input from the public and
interested agencies on the project. Your
input will help the Commission staff
determine which issues need to be
evaluated in the EA. Please note that the
scoping period will close on July 21,
2008.
This notice is being sent to affected
landowners; federal, state, and local
government representatives and
agencies; environmental and public
interest groups; Native American tribes;
other interested parties in this
proceeding; and local libraries and
newspapers. We encourage government
representatives to notify their
constituents of this planned project and
encourage them to comment on their
areas of concern.
If you are a landowner receiving this
notice, you may be contacted by a
pipeline company representative about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The pipeline
company would seek to negotiate a
mutually acceptable agreement.
However, if the project is approved by
the Commission, that approval conveys
with it the right of eminent domain.
Therefore, if easement negotiations fail
to produce an agreement, the pipeline
company could initiate condemnation
proceedings in accordance with state
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ was attached to the project
notice BBS provided to landowners.
This fact sheet addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is available for viewing
on the FERC Internet Web site
(www.ferc.gov).
Summary of the Proposed Project
The proposed project would involve
modifications of the Greasewood
Compressor Station (Greasewood CS)
and the construction of a new
compressor station called the Snake
River Compressor Station (Snake River
CS) as described below.
Greasewood CS
WIC proposes to uprate the existing
compressor unit and install a new
compressor unit at the Greasewood CS
located at milepost (MP) 141.7 on Line
233 A in Rio Blanco County, Colorado.
All construction activity would be
E:\FR\FM\30JNN1.SGM
30JNN1
Agencies
[Federal Register Volume 73, Number 126 (Monday, June 30, 2008)]
[Notices]
[Pages 36858-36859]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-14687]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP08-89-000]
Williston Basin Interstate Pipeline Company; Notice of
Availability of the Environmental Assessment for the Proposed Sheyenne
Expansion Project
June 20, 2008.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) has prepared an environmental assessment (EA) of the
Sheyenne Expansion Project proposed by Williston Basin Interstate
Pipeline Company (Williston Basin) in the above-referenced docket.
The EA was prepared to satisfy the requirements of the National
Environmental Policy Act. The FERC staff concludes that approval of the
proposed project, with appropriate mitigating measures, would not
constitute a major federal action significantly affecting the quality
of the human environment.
The EA assesses the potential environmental effects of the
construction and operation of Williston Basin's proposed Sheyenne
Expansion Project (Project), consisting of the new Steele Compressor
Station in Kidder County, North Dakota; installation of additional
compression at the existing Bismarck Compressor Station in Burleigh
County, North Dakota; minor modifications to the existing Cleveland
Compressor Station in Stutsman County, North Dakota; and construction
and operation of approximately 6,400 feet of 8-inch-diameter pipeline
lateral and metering facilities to connect to the proposed Tharaldson
Ethanol Plant in Cass County, North Dakota.
The EA has been placed in the public files of the FERC. A limited
number of copies of the EA are available for distribution and public
inspection at: Federal Energy Regulatory Commission, Public Reference
Room, 888 First Street, NE., Room 2A, Washington, DC 20426, (202) 502-
8371.
Copies of the EA have been mailed to federal, state, and local
agencies, interested individuals, newspapers, libraries, and parties to
this proceeding. Any person wishing to comment on the EA may do so. To
ensure consideration prior to a Commission decision on the proposal, it
is important that we receive your comments before the date specified
below.
You can make a difference by providing us with your specific
comments or concerns about the Project. Your comments should focus on
the
[[Page 36859]]
potential environmental effects, reasonable alternatives, and measures
to avoid or lessen environmental impacts. The more specific your
comments, the more useful they will be. To ensure that your comments
are timely and properly recorded, please send in your comments so that
they will be received in Washington, DC on or before July 21, 2008.
For your convenience, there are three methods in which you can use
to submit your comments to the Commission. In all instances please
reference the project docket number CP08-89-000 with your submission.
The docket number can be found on the front of this notice. The
Commission encourages electronic filing of comments and has dedicated
eFiling expert staff available to assist you at 202-502-8258 or
efiling@ferc.gov.
(1) You may file your comments electronically by using the Quick
Comment feature, which is located on the Commission's internet Web site
at https://www.ferc.gov under the link to Documents and Filings. A Quick
Comment is an easy method for interested persons to submit text-only
comments on a project;
(2) You may file your comments electronically by using the eFiling
feature, which is located on the Commission's internet Web site at
https://www.ferc.gov under the link to Documents and Filings. eFiling
involves preparing your submission in the same manner as you would if
filing on paper, and then saving the file on your computer's hard
drive. You will attach that file as your submission. New eFiling users
must first create an account by clicking on ``Sign up'' or
``eRegister''. You will be asked to select the type of filing you are
making. A comment on a particular project is considered a ``Comment on
a Filing;'' or
(3) You may file your comments via mail to the Commission by
sending an original and two copies of your letter to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First St., NE,
Room 1A, Washington, DC 20426;
Label one copy of the comments for the attention of Gas Branch 3,
PJ11.3.
Comments will be considered by the Commission but will not serve to
make the commentor a party to the proceeding. Any person seeking to
become a party to the proceeding must file a motion to intervene
pursuant to Rule 214 of the Commission's Rules of Practice and
Procedures (18 CFR 385.214).\1\ Only intervenors have the right to seek
rehearing of the Commission's decision.
---------------------------------------------------------------------------
\1\ Interventions may also be filed electronically via the
Internet in lieu of paper. See the previous discussion on filing
comments electronically.
---------------------------------------------------------------------------
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your comments considered.
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Internet Web site (www.ferc.gov) using the eLibrary link. Click on
the eLibrary link, click on ``General Search'' and enter the docket
number excluding the last three digits in the Docket Number field. Be
sure you have selected an appropriate date range. For assistance,
please contact FERC Online Support at FercOnlineSupport@ferc.gov or
toll free at 1-866-208-3676, or for TTY, contact (202) 502-8659. The
eLibrary link also provides access to the texts of formal documents
issued by the Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to www.ferc.gov/esubscribenow.htm.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-14687 Filed 6-27-08; 8:45 am]
BILLING CODE 6717-01-P