Richard Moss; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protest, 36310 [E8-14453]
Download as PDF
36310
Federal Register / Vol. 73, No. 124 / Thursday, June 26, 2008 / Notices
disclosing the information. The cost
estimate for respondents is based upon
salaries for professional and clerical
support, as well as direct and indirect
overhead costs. Direct costs include all
costs directly attributable to providing
this information, such as administrative
costs and the cost for information
technology. Indirect or overhead costs
are costs incurred by an organization in
support of its mission. These costs
apply to activities which benefit the
whole organization rather than any one
particular function or activity.
Comments are invited on the accuracy
of the agency’s burden estimate of the
proposed information collection,
including the validity of the
methodology and assumptions used to
calculate the reporting burden; and
ways to enhance the quality, utility and
clarity of the information to be
collected.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–14451 Filed 6–25–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6885–009]
Richard Moss; Notice of Application
Accepted for Filing and Soliciting
Motions To Intervene and Protest
rfrederick on PROD1PC67 with NOTICES
June 19, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: A Subsequent
License (Minor Project).
b. Project No.: 6885–009.
c. Date Filed: January 31, 2008.
d. Applicant: Richard Moss.
e. Name of Project: Cinnamon Ranch
Hydroelectric Project.
f. Location: On Middle Creek and
Birch Creek, in the Hammil Valley area
of Mono County, near the Town of
Benton, California. The project occupies
0.13 acre of Forest Service lands within
Inyo National Forest and 7.4 acres of
lands administered by the Bureau of
Land Management.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Don Moss, 8381
Foppiano Way, Sacramento, CA 95829,
916–715–6023.
i. FERC Contact: Gaylord Hoisington,
(202) 502–6032 or
gaylord.hoisington@FERC.gov.
j. Deadline for filing motions to
intervene and protests and requests for
VerDate Aug<31>2005
15:05 Jun 25, 2008
Jkt 214001
cooperating agency status: 60 days from
the issuance date of this notice.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Motions to intervene and protests may
be filed electronically via the Internet in
lieu of paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the ‘‘eFiling’’ link.
k. This application has been accepted,
but is not ready for environmental
analysis at this time.
l. The existing operating project was
built in 1960 and has been furnishing
electric power to the Cinnamon ranch
since that time. The project consists of:
(1) Two existing diversion flumes; (2) a
5,940-foot-long penstock; (3) a
powerhouse containing a turbine and
generator for a total installed capacity of
150 kilowatts; and (4) a 5,176-foot-long,
12 kilvoltV transmission line. The
project is estimated to generate an
average of 421,184 kilowatt-hours
annually. The dam and existing project
facilities are owned by the applicant.
The applicant proposes no changes to
facilities or operations.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
All filings must (1) Bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–14453 Filed 6–25–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. P–2244–022]
Energy Northwest; Notice of
Application Ready for Environmental
Analysis and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
June 19, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: P–2244–022.
c. Date filed: February 25, 2008.
d. Applicant: Energy Northwest.
e. Name of Project: Packwood Lake
Hydroelectric Project.
f. Location: The existing project is on
Lake Creek, a tributary to Cowlitz River,
in Lewis County in southwestern
Washington near the unincorporated
town of Packwood. The upper portion of
the lake lies within the Goat Rocks
Wilderness Area. The project occupies
E:\FR\FM\26JNN1.SGM
26JNN1
Agencies
[Federal Register Volume 73, Number 124 (Thursday, June 26, 2008)]
[Notices]
[Page 36310]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-14453]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6885-009]
Richard Moss; Notice of Application Accepted for Filing and
Soliciting Motions To Intervene and Protest
June 19, 2008.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: A Subsequent License (Minor Project).
b. Project No.: 6885-009.
c. Date Filed: January 31, 2008.
d. Applicant: Richard Moss.
e. Name of Project: Cinnamon Ranch Hydroelectric Project.
f. Location: On Middle Creek and Birch Creek, in the Hammil Valley
area of Mono County, near the Town of Benton, California. The project
occupies 0.13 acre of Forest Service lands within Inyo National Forest
and 7.4 acres of lands administered by the Bureau of Land Management.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Don Moss, 8381 Foppiano Way, Sacramento, CA
95829, 916-715-6023.
i. FERC Contact: Gaylord Hoisington, (202) 502-6032 or
gaylord.hoisington@FERC.gov.
j. Deadline for filing motions to intervene and protests and
requests for cooperating agency status: 60 days from the issuance date
of this notice.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
Motions to intervene and protests may be filed electronically via
the Internet in lieu of paper. The Commission strongly encourages
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions
on the Commission's Web site (https://www.ferc.gov) under the ``e-
Filing'' link.
k. This application has been accepted, but is not ready for
environmental analysis at this time.
l. The existing operating project was built in 1960 and has been
furnishing electric power to the Cinnamon ranch since that time. The
project consists of: (1) Two existing diversion flumes; (2) a 5,940-
foot-long penstock; (3) a powerhouse containing a turbine and generator
for a total installed capacity of 150 kilowatts; and (4) a 5,176-foot-
long, 12 kilvoltV transmission line. The project is estimated to
generate an average of 421,184 kilowatt-hours annually. The dam and
existing project facilities are owned by the applicant. The applicant
proposes no changes to facilities or operations.
m. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
n. Anyone may submit a protest or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, 385.211, and 385.214. In determining the appropriate
action to take, the Commission will consider all protests filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any protests
or motions to intervene must be received on or before the specified
deadline date for the particular application.
All filings must (1) Bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-14453 Filed 6-25-08; 8:45 am]
BILLING CODE 6717-01-P