Proposed Expansion of the Cove Point Facility, Cove Point, MD: Final Supplemental Environmental Assessment and Finding of No Significant Impact, 36094-36095 [E8-14288]
Download as PDF
36094
Federal Register / Vol. 73, No. 123 / Wednesday, June 25, 2008 / Notices
to identify anticipated special needs as
early as possible.
Dated: June 20, 2008.
Hugo Teufel III,
Chief Privacy Officer.
[FR Doc. E8–14394 Filed 6–24–08; 8:45 am]
BILLING CODE 4410–10–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
[Docket No. USCG–2008–0035]
Proposed Expansion of the Cove Point
Facility, Cove Point, MD: Final
Supplemental Environmental
Assessment and Finding of No
Significant Impact
Coast Guard, DHS.
Notice of Availability of Final
Supplemental Environmental
Assessment and Finding of No
Significant Impact.
AGENCY:
mstockstill on PROD1PC66 with NOTICES
ACTION:
SUMMARY: The Coast Guard announces
the availability of the Final
Supplemental Environmental
Assessment (EA) and the Finding of No
Significant Impact (FONSI) that
evaluated the potential environmental
impacts resulting from the proposed
issuance of a Letter of Recommendation
(LOR) on the suitability of the waterway
for the expansion of the Cove Point LNG
facility for Dominion Cove Point LNG,
LP, in Cove Point, MD.
ADDRESSES: Comments and material
received from the public as well as
documents mentioned in this notice as
being available in the docket, are part of
the Coast Guard docket number USCG–
2008–0035 and are available for
inspection or copying at the Docket
Management Facility, U.S. Department
of Transportation, room PL–401, 400
Seventh Street, SW., between 9 a.m. and
5 p.m., Monday through Friday, except
for Federal Holidays. You may also find
this docket on the internet at https://
www.regulations.gov.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this notice, call
Lieutenant Commander Rogers
Henderson, Coast Guard, telephone
202–372–1411 or Mr. Ken Smith, Coast
Guard, telephone 202–372–1413. If you
have any questions on viewing material
on the docket, call Renee V. Wright,
Program Manager, Docket Operations,
telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: In
accordance with the National
Environmental Policy Act of 1969
(Section 102(2)(c)), as implemented by
the Council of Environmental Quality
VerDate Aug<31>2005
20:04 Jun 24, 2008
Jkt 214001
regulations (40 CFR parts 1500–1508),
the applicant prepared a Final
Supplemental EA and the Coast Guard
prepared the FONSI for the Proposed
Expansion of the Cove Point Facility,
Cove Point, MD.
Response to Comments
The Coast Guard requested comments
on the Draft Supplemental EA when the
Notice of Availability for the Draft
Supplemental EA was published on
March 13, 2008 (73 FR 13551). The
Coast Guard received nine comments on
the draft Supplemental EA.
Two commenters agreed with the
Coast Guard that the proposed action
will not have a significant impact on the
State of Maryland’s environment or
historic properties.
One commenter stated the current
security measures for the facility and
during tanker loading/unloading
operations are insufficient. The Coast
Guard disagrees because the facility is
regulated under the Maritime
Transportation Security Act (MTSA) of
2002 and as a result must comply with
a Coast Guard approved Facility
Security Plan. Foreign vessels which
make LNG deliveries to the terminal
must have a valid International Ship
Security Certificate on board attesting to
the vessel’s compliance with the
International Convention for Safety of
Life at Sea and the Ship and Port
Facility Security (ISPS) Code. The ISPS
Code is the foreign equivalent to MTSA
requirements. In addition, Cove Point
has been receiving LNG shipments and
operating in compliance with the safety
and security provisions and operating
restrictions of the Letter of
Recommendation (LOR) issued by the
Coast Guard to Cove Point in 2002.
One commenter discussed the
applicability of the Sandia 2005 risk
assessment to the proposed Expansion
Project. The Coast Guard disagrees that
this is applicable since the Sandia 2005
assessment referenced by the
commenter is apparently the Sandia
Report SAND2005–7339: ‘‘Review of the
Independent Risk Assessment of the
Proposed Cabrillo Liquefied Natural Gas
Deepwater Port project.’’ This report is
not applicable to this proposed project
because it addresses a deepwater project
with a a Floating Storage and
Regasification Unit (FSRU), and not the
waterway for an LNG terminal. Instead,
the applicable Sandia report for Cove
Point is the 2004 Sandia Report,
SAND2004–6258: ‘‘Guidance on Risk
Analysis and Safety Implications of a
Large Liquefied Natural Gas Spill on
Water.’’ This report identifies three
‘‘Zones of Concerns’’. The Sandia 2004
report shows the conservative maximum
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
hazard distance is defined as Zone 3,
which would occur in the unlikely
event of a LNG vapor cloud release but
would only create a hazard within a
distance of about 2.2 miles from the
point of the release.
One commenter suggested a major
LNG spill would affect the cooling
towers of the Calvert Cliffs Nuclear
Power Plant. The Coast Guard disagrees
with this comment since the plant is
well outside the furthest potential
impact zone, Zone 3, i.e. the distance of
2.2 miles, per the applicable Sandia
report.
One commenter stated that the air
pollutants from LNG tankers, marine
escorts, and traffic specifically related to
LNG were not addressed since the
Maryland Department of the
Environment covers only stationary
equipment. The Coast Guard disagrees
with this comment. These air pollutants
were addressed in the April 2006 FERC
FEIS, Appendix H, ‘‘General Conformity
Determination for the Proposed Cove
Point Expansion Project’’ which the
Supplemental EA adopted. The General
Conformity Rule, found in 40 CFR Part
51, Subpart W and 40 CFR Part 93,
Subpart B, applies to proposed actions
in a nonattainment or maintenance area
that are not otherwise regulated under
the New Source Review (NSR) programs
or Operating Permit Program.
Consequently, the General Conformity
Rule applies to direct emissions, such as
construction and vessel activity
emissions, which are not long-term
stationary source operations. As part of
the General Conformity Determination,
LNG ships and tugs emissions were
estimated based on roundtrip operation
in state waters.
One commenter declared that
uncontrolled toxic air pollutants from
the proposed project are expected to
form toxic particulates matter hazardous
to human health. The Coast Guard
disagrees with this comment. As the
Supplemental EA and FONSI discuss,
we found that there will be no
significant adverse impact from the
toxic air pollutants and disagreed that
these pollutants are uncontrolled. These
pollutants are subject to the U.S. EPA
Clean Air Act’s National Emission
Standards for Hazardous Air Pollutants
(HAP). Under the HAP permitting
process, it was established the proposed
project’s total potential HAP emission
rate, 11 tons per year (tpy), was well
below the threshold for facilities subject
to HAP regulations which is 25 tpy.
One commenter expressed concern
regarding the volume of ballast water
intake from the increase of LNG tankers
resulting in an increase of salinity of the
Chesapeake Bay. The Coast Guard
E:\FR\FM\25JNN1.SGM
25JNN1
Federal Register / Vol. 73, No. 123 / Wednesday, June 25, 2008 / Notices
disagrees with this comment. The
volume of water removed by each LNG
ship as a percentage of the total amount
of the Bay is negligible and would not
increase salinity in the Chesapeake Bay.
One commenter stated the impact of
seawater intake for ballast from the
increase in LNG tankers did not address
the impact to aquatic organisms. The
Coast Guard disagrees with this
comment. The potential impacts to the
aquatic organisms were addressed in
Section 7 of the Supplemental EA. The
calculated seawater intake on the LNG
vessels is 0.6 feet per second. This
velocity is similar to the 0.5 feet per
second identified by the National
Marine Fisheries Service as minimizing
entrainment and impingement of
aquatic organisms.
Supplemental Environmental
Assessment
We prepared a Supplemental EA to
identify and examine the reasonable
alternatives and assess their potential
environmental impacts. The
Supplemental EA examined the
potential effects associated with the
incremental increase in LNG ship traffic
within U.S. territorial waters on natural,
cultural, and human resources.
Our preferred alternative is to issue a
LOR with conditions. This action will
assure that the waterway is suitable,
safe, and environmentally sound for the
increased LNG vessel traffic resulting
from the Cove Point Expansion Project.
This preferred alternative as well as
other alternatives are further described
in the supplemental EA.
The Coast Guard determined the
Supplemental EA adequately discusses
the environmental issues and impacts of
the proposed action. It provides
sufficient evidence and analysis for
determining that an environmental
impact statement is not required.
Therefore, a Finding of No Significant
Impact was issued for the preferred
alternative of the proposed action.
Dated: June 17, 2008.
Capt. M.L. Blair,
Acting Director of Commercial Regulations
and Standards.
[FR Doc. E8–14288 Filed 6–24–08; 8:45 am]
BILLING CODE 4910–15–P
mstockstill on PROD1PC66 with NOTICES
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
[Docket No. USCG–2008–0499]
National Maritime Security Advisory
Committee; Meeting
AGENCY:
Coast Guard, DHS.
VerDate Aug<31>2005
20:04 Jun 24, 2008
Jkt 214001
ACTION:
Notice of meeting.
SUMMARY: The National Maritime
Security Advisory Committee will have
a web based meeting to discuss various
issues relating to Maritime Security.
This meeting will be open to the public.
DATES: The Committee will meet on
Tuesday, July 22, 2008 from 2 p.m. until
5 p.m. EST. This meeting may close
early if all business is finished. Written
material and requests to make oral
presentations should reach the Coast
Guard on or before Monday, July 11,
2008. Requests to have a copy of your
material distributed to each member of
the committee or subcommittee should
reach the Coast Guard on or before
Monday, July 11, 2008.
ADDRESSES: The Committee will meet
via a web enabled interactive online
format. Send written material and
requests to make oral presentations to
Ryan Owens, Assistant to Designated
Federal Officer of the National Maritime
Security Advisory Committee, 2100 2nd
Street, SW., Room 5302, Washington,
DC 20593. You may also e-mail material
to ryan.f.owens@uscg.mil. This notice is
available in our online docket, Docket
No. USCG–2008–0499, at https://
dms.dot.gov.
FOR FURTHER INFORMATION CONTACT:
Ryan F. Owens, Assistant to DFO of the
National Maritime Security Advisory
Committee at (202) 372–1108 or
ryan.f.owens@uscg.mil.
SUPPLEMENTARY INFORMATION: Notice of
this meeting is given under the Federal
Advisory Committee Act, 5 U.S.C. App.
(Pub. L. 92–463).
Agenda of Meeting
The agenda for the July 22, 2008,
Committee meeting is as follows:
(1) Report and Discussion of the
Transportation Worker Identification
Credential (TWIC) Working Group.
(2) Update and Discussion on the
Maritime Government Coordination
Council and the Maritime Sector
Coordination Council.
Procedural
This meeting is open to the public
and will be conducted via an online
meeting format. If you would like to
participate in this meeting, please log
onto https://fedgov.webex.com/fedgov/
onstage/g.php?t=a&d=695573884 and
follow the online instructions to register
for this meeting. Please note that the
meeting may close early if all business
is finished. At the Chair’s discretion,
members of the public may make oral
presentations during the meeting. If you
would like to make an oral presentation
at a meeting, please notify the Assistant
PO 00000
Frm 00061
Fmt 4703
Sfmt 4703
36095
to DFO no later than Monday, July 11,
2008. Written material for distribution
at a meeting should reach the Coast
Guard no later than Monday, July 11,
2008. If you would like a copy of your
material distributed to each member of
the committee or subcommittee in
advance of a meeting, please submit 25
copies to the Assistant to DFO no later
than Monday, July 11, 2008.
Information on Services for Individuals
With Disabilities
For information on facilities or
services for individuals with disabilities
or to request special assistance at the
meeting, contact the DFO as soon as
possible.
Dated: June 18, 2008.
M.P. O’Malley,
Captain, U.S. Coast Guard, Chief, Office of
Port and Facility Activities, Designated
Federal Official, NMSAC.
[FR Doc. E8–14368 Filed 6–24–08; 8:45 am]
BILLING CODE 4910–15–P
DEPARTMENT OF HOMELAND
SECURITY
Federal Emergency Management
Agency
[FEMA–1761–DR]
Georgia; Amendment No. 1 to Notice of
a Major Disaster Declaration
Federal Emergency
Management Agency, DHS.
ACTION: Notice.
AGENCY:
SUMMARY: This notice amends the notice
of a major disaster declaration for the
State of Georgia (FEMA–1761–DR),
dated May 23, 2008, and related
determinations.
EFFECTIVE DATE:
June 16, 2008.
FOR FURTHER INFORMATION CONTACT:
Peggy Miller, Disaster Assistance
Directorate, Federal Emergency
Management Agency, 500 C Street, SW.,
Washington, DC 20472, (202) 646–2705.
SUPPLEMENTARY INFORMATION: The notice
of a major disaster declaration for the
State of Georgia is hereby amended to
include the following area among those
areas determined to have been adversely
affected by the catastrophe declared a
major disaster by the President in his
declaration of May 23, 2008.
Douglas County for Public Assistance
(already designated for Individual
Assistance.)
(The following Catalog of Federal Domestic
Assistance Numbers (CFDA) are to be used
for reporting and drawing funds: 97.030,
Community Disaster Loans; 97.031, Cora
Brown Fund; 97.032, Crisis Counseling;
E:\FR\FM\25JNN1.SGM
25JNN1
Agencies
[Federal Register Volume 73, Number 123 (Wednesday, June 25, 2008)]
[Notices]
[Pages 36094-36095]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-14288]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
[Docket No. USCG-2008-0035]
Proposed Expansion of the Cove Point Facility, Cove Point, MD:
Final Supplemental Environmental Assessment and Finding of No
Significant Impact
AGENCY: Coast Guard, DHS.
ACTION: Notice of Availability of Final Supplemental Environmental
Assessment and Finding of No Significant Impact.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard announces the availability of the Final
Supplemental Environmental Assessment (EA) and the Finding of No
Significant Impact (FONSI) that evaluated the potential environmental
impacts resulting from the proposed issuance of a Letter of
Recommendation (LOR) on the suitability of the waterway for the
expansion of the Cove Point LNG facility for Dominion Cove Point LNG,
LP, in Cove Point, MD.
ADDRESSES: Comments and material received from the public as well as
documents mentioned in this notice as being available in the docket,
are part of the Coast Guard docket number USCG-2008-0035 and are
available for inspection or copying at the Docket Management Facility,
U.S. Department of Transportation, room PL-401, 400 Seventh Street,
SW., between 9 a.m. and 5 p.m., Monday through Friday, except for
Federal Holidays. You may also find this docket on the internet at
https://www.regulations.gov.
FOR FURTHER INFORMATION CONTACT: If you have questions on this notice,
call Lieutenant Commander Rogers Henderson, Coast Guard, telephone 202-
372-1411 or Mr. Ken Smith, Coast Guard, telephone 202-372-1413. If you
have any questions on viewing material on the docket, call Renee V.
Wright, Program Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: In accordance with the National
Environmental Policy Act of 1969 (Section 102(2)(c)), as implemented by
the Council of Environmental Quality regulations (40 CFR parts 1500-
1508), the applicant prepared a Final Supplemental EA and the Coast
Guard prepared the FONSI for the Proposed Expansion of the Cove Point
Facility, Cove Point, MD.
Response to Comments
The Coast Guard requested comments on the Draft Supplemental EA
when the Notice of Availability for the Draft Supplemental EA was
published on March 13, 2008 (73 FR 13551). The Coast Guard received
nine comments on the draft Supplemental EA.
Two commenters agreed with the Coast Guard that the proposed action
will not have a significant impact on the State of Maryland's
environment or historic properties.
One commenter stated the current security measures for the facility
and during tanker loading/unloading operations are insufficient. The
Coast Guard disagrees because the facility is regulated under the
Maritime Transportation Security Act (MTSA) of 2002 and as a result
must comply with a Coast Guard approved Facility Security Plan. Foreign
vessels which make LNG deliveries to the terminal must have a valid
International Ship Security Certificate on board attesting to the
vessel's compliance with the International Convention for Safety of
Life at Sea and the Ship and Port Facility Security (ISPS) Code. The
ISPS Code is the foreign equivalent to MTSA requirements. In addition,
Cove Point has been receiving LNG shipments and operating in compliance
with the safety and security provisions and operating restrictions of
the Letter of Recommendation (LOR) issued by the Coast Guard to Cove
Point in 2002.
One commenter discussed the applicability of the Sandia 2005 risk
assessment to the proposed Expansion Project. The Coast Guard disagrees
that this is applicable since the Sandia 2005 assessment referenced by
the commenter is apparently the Sandia Report SAND2005-7339: ``Review
of the Independent Risk Assessment of the Proposed Cabrillo Liquefied
Natural Gas Deepwater Port project.'' This report is not applicable to
this proposed project because it addresses a deepwater project with a a
Floating Storage and Regasification Unit (FSRU), and not the waterway
for an LNG terminal. Instead, the applicable Sandia report for Cove
Point is the 2004 Sandia Report, SAND2004-6258: ``Guidance on Risk
Analysis and Safety Implications of a Large Liquefied Natural Gas Spill
on Water.'' This report identifies three ``Zones of Concerns''. The
Sandia 2004 report shows the conservative maximum hazard distance is
defined as Zone 3, which would occur in the unlikely event of a LNG
vapor cloud release but would only create a hazard within a distance of
about 2.2 miles from the point of the release.
One commenter suggested a major LNG spill would affect the cooling
towers of the Calvert Cliffs Nuclear Power Plant. The Coast Guard
disagrees with this comment since the plant is well outside the
furthest potential impact zone, Zone 3, i.e. the distance of 2.2 miles,
per the applicable Sandia report.
One commenter stated that the air pollutants from LNG tankers,
marine escorts, and traffic specifically related to LNG were not
addressed since the Maryland Department of the Environment covers only
stationary equipment. The Coast Guard disagrees with this comment.
These air pollutants were addressed in the April 2006 FERC FEIS,
Appendix H, ``General Conformity Determination for the Proposed Cove
Point Expansion Project'' which the Supplemental EA adopted. The
General Conformity Rule, found in 40 CFR Part 51, Subpart W and 40 CFR
Part 93, Subpart B, applies to proposed actions in a nonattainment or
maintenance area that are not otherwise regulated under the New Source
Review (NSR) programs or Operating Permit Program. Consequently, the
General Conformity Rule applies to direct emissions, such as
construction and vessel activity emissions, which are not long-term
stationary source operations. As part of the General Conformity
Determination, LNG ships and tugs emissions were estimated based on
roundtrip operation in state waters.
One commenter declared that uncontrolled toxic air pollutants from
the proposed project are expected to form toxic particulates matter
hazardous to human health. The Coast Guard disagrees with this comment.
As the Supplemental EA and FONSI discuss, we found that there will be
no significant adverse impact from the toxic air pollutants and
disagreed that these pollutants are uncontrolled. These pollutants are
subject to the U.S. EPA Clean Air Act's National Emission Standards for
Hazardous Air Pollutants (HAP). Under the HAP permitting process, it
was established the proposed project's total potential HAP emission
rate, 11 tons per year (tpy), was well below the threshold for
facilities subject to HAP regulations which is 25 tpy.
One commenter expressed concern regarding the volume of ballast
water intake from the increase of LNG tankers resulting in an increase
of salinity of the Chesapeake Bay. The Coast Guard
[[Page 36095]]
disagrees with this comment. The volume of water removed by each LNG
ship as a percentage of the total amount of the Bay is negligible and
would not increase salinity in the Chesapeake Bay.
One commenter stated the impact of seawater intake for ballast from
the increase in LNG tankers did not address the impact to aquatic
organisms. The Coast Guard disagrees with this comment. The potential
impacts to the aquatic organisms were addressed in Section 7 of the
Supplemental EA. The calculated seawater intake on the LNG vessels is
0.6 feet per second. This velocity is similar to the 0.5 feet per
second identified by the National Marine Fisheries Service as
minimizing entrainment and impingement of aquatic organisms.
Supplemental Environmental Assessment
We prepared a Supplemental EA to identify and examine the
reasonable alternatives and assess their potential environmental
impacts. The Supplemental EA examined the potential effects associated
with the incremental increase in LNG ship traffic within U.S.
territorial waters on natural, cultural, and human resources.
Our preferred alternative is to issue a LOR with conditions. This
action will assure that the waterway is suitable, safe, and
environmentally sound for the increased LNG vessel traffic resulting
from the Cove Point Expansion Project. This preferred alternative as
well as other alternatives are further described in the supplemental
EA.
The Coast Guard determined the Supplemental EA adequately discusses
the environmental issues and impacts of the proposed action. It
provides sufficient evidence and analysis for determining that an
environmental impact statement is not required. Therefore, a Finding of
No Significant Impact was issued for the preferred alternative of the
proposed action.
Dated: June 17, 2008.
Capt. M.L. Blair,
Acting Director of Commercial Regulations and Standards.
[FR Doc. E8-14288 Filed 6-24-08; 8:45 am]