Environmental Impact Statements and Regulations; Availability of EPA Comments, 35132-35133 [E8-14004]
Download as PDF
35132
Federal Register / Vol. 73, No. 120 / Friday, June 20, 2008 / Notices
Notice is hereby given that the
deadline for filing protests is July 11,
2008.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, KD Power is
authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of KD
Power, compatible with the public
interest, and is reasonably necessary or
appropriate for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of KD Power’s issuance of
securities or assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
internet in lieu of paper. See, 18 CFR
385.2001(a) (1) (iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–13951 Filed 6–19–08; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8582–9]
jlentini on PROD1PC65 with NOTICES
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated April 11, 2008 (73 FR 19833).
VerDate Aug<31>2005
16:53 Jun 19, 2008
Jkt 214001
Draft EISs
EIS No. 20070299, ERP No. D–AFS–
J65488–WY, Battle Park Cattle and
Horse (C&H) and Mistymoon Sheep
and Goat (S&G) Allotment Project,
Proposes to Continue Livestock
Grazing on both Allotments, Powder
River District Ranger, Bighorn
National Forest, Bighorn County, WY.
Summary: EPA expressed
environmental concerns about impacts
to soil and water resources, and
recommended including more
information on water quality, current
extent of invasive species, and drought
mitigation planning. Rating EC2.
EIS No. 20080015, ERP No. D–BLM–
J65505–WY, Westside Land
Conveyance Project, CongressionallyMandated Transfer of 16,500 Acres of
Public Land to the Westside Irrigation
District, Big Horn and Washakie
Counties, WY.
Summary: EPA expressed
environmental concerns about water
quality impacts from crop production
on newly irrigated lands. The final EIS
should include measures to avoid or
mitigate impacts to the Big Horn River.
Rating EC2.
EIS No. 20080092, ERP No. D–BIA–
J01082–MT, Absaloka Mine Crow
Reservation South Extension Coal
Lease Approval, Proposed Mine
Development Plan, and Related
Federal and State Permitting Actions,
Crow Indian Reservation, Crow Tribe,
Bighorn County, MT.
Summary: EPA expressed
environmental concerns about impacts
to ground and surface water and
cumulative air impacts. Rating EC2.
EIS No. 20080119, ERP No. D–USN–
K10011–CA, Southern California
Range Complex, To Organize, Train,
Equip, and Maintain Combat-Ready
Naval Forces, San Diego, Orange and
Los Angeles Counties, CA.
Summary: EPA expressed
environmental concerns about impacts
to marine resources. Rating EC2.
EIS No. 20080133, ERP No. D–NPS–
G65108–TX, Guadalupe Mountains
National Park, General Management
Plan, Implementation, Culberson and
Hudspeth Counties, TX.
Summary: EPA does not object to the
preferred alternative. Rating LO.
Final EISs
EIS No. 20080140, ERP No. F–DOI–
J39030–UT, Lower Duchesne River
Wetlands Mitigation Project (LDWP),
Restoration Measures in the Lower
Duchesne River Area, Strawberry
Aqueduct and Collection System
(SACS) on portion of the Strawberry
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
Reservoir, Implementation, Ute Indian
Tribe, NPDES and U.S. Army COE
section 404 Permits, Duchesne, Utah,
Uintah Counties, UT.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20080145, ERP No. F–FRC–
F03011–00, Rockies Express Pipeline
Project, (REX–East), Construction and
Operation of Natural Gas Pipeline
Facilities, WY, NE, MO, IL, IN and
OH.
Summary: EPA continues to have
environmental concerns about impacts
to surface/ground water, wetlands, air
quality, and upland forest habitat, and
recommends additional mitigation
plans/measures be included in the ROD
or equivalent FERC order.
EIS No. 20080152, ERP No. F–FRC–
E05103–NC, Yadkin—Yadkin-Pee Dee
Hydro Electric Project (Docket Nos. P–
2197–073 & P–2206–030), Issuance of
New Licenses for the Existing and
Proposed Hydropower Projects,
Yadkin—Yadkin-Pee Dee Rivers,
Davidson, Davie, Montgomery,
Rowan, Stanly, Anson and Richmond
Counties, NC.
Summary: EPA’s previous concerns
have been resolved; therefore, EPA does
not object to the proposed action.
EIS No. 20080178, ERP No. F–AFS–
J65486–UT, Big Creek Vegetation
Treatment Project, Preferred
Alternative is 1, To Treat 4,800 Acres
of Aspen Conifer and Sagebrush
Communities, Ogden Ranger District,
Wasatch-Cache National Forest, Rich
County, UT.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20080151, ERP No. FA–AFS–
K65286–CA, Watdog Project,
Additional Clarification of Changes
Between the Final EIS (2005) and
Final Supplement EIS (2007), Feather
River Ranger District, Plumas
National Forest, Butte and Plumas
Counties, CA.
Summary: EPA continues to have
environmental concerns about
cumulative impacts to watersheds and
short-term impacts to old-forest species,
and recommends a less-intensive
harvest alternative.
EIS No. 20080173, ERP No. FS–FTA–
G40190–TX, North Corridor Fixed
Guideway Project, Updated/
Additional Information on the Locally
Preferred Alternative, Propose Transit
Improvements from University of
Houston (UH)–Downtown Station to
Northline Mall, Harris County, TX.
Summary: No formal comment letter
was sent to the preparing agency.
E:\FR\FM\20JNN1.SGM
20JNN1
Federal Register / Vol. 73, No. 120 / Friday, June 20, 2008 / Notices
EIS No. 20080179, ERP No. FS–FTA–
G40191–TX, Southeast Corridor
Project, Preferred Alternative is the
Light Rail Alternative, Proposed
Fixed-Guideway Transit System,
Funding, Metropolitan Transit
Authority (METRO) of Harris County,
Houston, Harris County, TX.
Summary: No formal comment letter
was sent to the preparing agency.
Dated: June 17, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–14004 Filed 6–19–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8582–8]
jlentini on PROD1PC65 with NOTICES
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 06/09/2008 through 06/13/2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080234, Draft EIS, AFS, WA,
Dosewallips Road Washout Project, to
Reestablish Road Access to both
Forest Service Road (FSR) 2610 and
Dosewallips Road, Hood Canal Ranger
District Olympic National Forest,
Olympic National Park, Jefferson
County, WA, Comment Period Ends:
08/19/2008, Contact: Tim Davis 360–
956–2375.
EIS No. 20080235, Final Supplement,
NOA, AK, Cook Inlet Beluga Whale
Subsistence Harvest Project, Proposes
to Implement a Long-Term Harvest
Plan and Fulfill the Federal
Government’s Trust Responsibility,
Cook Inlet, AK, Wait Period Ends: 07/
21/2008, Contact: Robert D Mecum
907–586–7235.
EIS No. 20080236, Final EIS, BIA, WA,
Spokane Tribes Integrated Resource
Management Plan (IRMP) for the
Spokane Indian Reservation,
Implementation, Stevens County, WA,
Wait Period Ends: 07/21/2008,
Contact: Donna Smith 509–258–4561.
EIS No. 20080237, Draft EIS, NPS, SD,
Wind Cave National Park Project, Elk
General Management Plan,
Implementation, Custer County, SD,
Comment Period Ends: 08/18/2008,
Contact: Nick Chevance 402–661–
1844.
EIS No. 20080238, Draft EIS, AFS, WY,
Off-Highway Vehicle (OHV) Route
VerDate Aug<31>2005
16:53 Jun 19, 2008
Jkt 214001
Designation Project, Proposing to
Improve Management of Public
Summer Motorized Use (May 1–
November 30) by Designating Roads
and Motorized Trails, Bridger-Teton
National Forest, Buffalo, Jackson and
Big Piney Ranger Districts, Teton,
Lincoln and Sublette Counties, WY,
Comment Period Ends: 08/04/2008,
Contact: Linda Merigliano 307–739–
5428.
EIS No. 20080239, Draft Supplement,
UAF, MA, Pave Paws Early Warning
Radar Operation Project, Continued
Operation of the Solid-State PhasedArray Radar System (SSPARS), also
known as Pave, Phased Array
Warning Systems (PAWS), Cape Cod
Air Force Station, MA, Comment
Period Ends: 08/04/2008, Contact:
Lynne Neuman 719–554–6406.
EIS No. 20080240, Draft EIS, DOA, 00,
PROGRAMMATIC—Geothermal
Leasing in the Western United States,
Comment Period Ends: 09/17/2008,
Contact: Jack G. Peterson 208–373–
4048.
Department of the Interior/Bureau of
Land Management and Department of
Agriculture/Forest Service’s are Joint
Lead Agencies for the above project. The
contact person for (BLM) is Jack G.
Peterson at 208–373–4048 and the
contact person for (AFS) is Tracy Parker
at 703–605–4796.
Amended Notices
EIS No. 20080125, Draft EIS, FHW, NC,
I–26 Connector Project, Proposed
Multi-Land Freeway from I–40 to
US19–23–70 North of Asheville,
Funding, U.S. Coast Guard Permit,
U.S. Army COE section 10 and 404
Permit, Buncombe County, Asheville,
NC, Comment Period Ends: 06/23/
2008, Contact: John F. Sullivan III,
P.E. 919–856–4346 Ext. 122.
Revision of FR Notice Published 04/
11/2008: Extending Comment from 05/
19/2008 to 06/23/2008.
EIS No. 20080186, Draft EIS, FAA, NV,
City of Mesquite, Proposed
Replacement General Aviation
Airport, Implementation, Clark
County, NV, Comment Period Ends:
07/18/2008, Contact: Barry Franklin
650–876–2778.
Revision to FR Notice Publish 05/16/
2008: Extending Comment from 07/03/
2008 to 07/18/2008.
Dated: June 17, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–14005 Filed 6–19–08; 8:45 am]
BILLING CODE 6560–50–P
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
35133
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OAR–2008–0449; FRL–8683–4]
Proposed Approval of the Central
Characterization Project’s Transuranic
Waste Characterization Program at
Oak Ridge National Laboratory
Environmental Protection
Agency.
ACTION: Notice of availability; opening
of public comment period.
AGENCY:
SUMMARY: The Environmental Protection
Agency (EPA or we) is announcing the
availability of, and soliciting public
comments for 45 days on, the proposed
approval of the radioactive, contacthandled (CH), transuranic (TRU) waste
characterization program implemented
by the Central Characterization Project
(CCP) at Oak Ridge National Laboratory
(ORNL) in Oak Ridge, Tennessee. This
waste is intended for disposal at the
Waste Isolation Pilot Plant (WIPP) in
New Mexico.
In accordance with the WIPP
Compliance Criteria, EPA evaluated the
characterization of CH TRU debris waste
from ORNL–CCP during an inspection
conducted the week of November 13,
2007. Using the systems and processes
developed as part of the U.S.
Department of Energy’s (DOE’s)
Carlsbad Field Office (CBFO) program,
EPA verified whether DOE could
adequately characterize CH TRU waste
consistent with the Compliance Criteria.
The results of EPA’s evaluation of
ORNL–CCP’s program and its proposed
approval are described in the Agency’s
inspection report, which is available for
review in the public dockets listed in
ADDRESSES. We will consider public
comments received on or before the due
date mentioned in DATES.
This notice summarizes the waste
characterization processes evaluated by
EPA and EPA’s proposed approval. As
required by the 40 CFR 194.8, at the end
of a 45-day comment period EPA will
evaluate public comments received, and
if appropriate, finalize the reports
responding to the relevant public
comments, and issue a final report and
approval letter to DOE.
DATES: Comments must be received on
or before August 4, 2008.
ADDRESSES: Submit your comments,
identified by Docket ID No. EPA–HQ–
OAR–2008–0449, by one of the
following methods:
• https://www.regulations.gov: Follow
the on-line instructions for submitting
comments.
• E-mail: a-and-r-docket@epa.gov.
• Fax: 202–566–1741.
E:\FR\FM\20JNN1.SGM
20JNN1
Agencies
[Federal Register Volume 73, Number 120 (Friday, June 20, 2008)]
[Notices]
[Pages 35132-35133]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-14004]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8582-9]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 11, 2008 (73
FR 19833).
Draft EISs
EIS No. 20070299, ERP No. D-AFS-J65488-WY, Battle Park Cattle and Horse
(C&H) and Mistymoon Sheep and Goat (S&G) Allotment Project, Proposes to
Continue Livestock Grazing on both Allotments, Powder River District
Ranger, Bighorn National Forest, Bighorn County, WY.
Summary: EPA expressed environmental concerns about impacts to soil
and water resources, and recommended including more information on
water quality, current extent of invasive species, and drought
mitigation planning. Rating EC2.
EIS No. 20080015, ERP No. D-BLM-J65505-WY, Westside Land Conveyance
Project, Congressionally-Mandated Transfer of 16,500 Acres of Public
Land to the Westside Irrigation District, Big Horn and Washakie
Counties, WY.
Summary: EPA expressed environmental concerns about water quality
impacts from crop production on newly irrigated lands. The final EIS
should include measures to avoid or mitigate impacts to the Big Horn
River. Rating EC2.
EIS No. 20080092, ERP No. D-BIA-J01082-MT, Absaloka Mine Crow
Reservation South Extension Coal Lease Approval, Proposed Mine
Development Plan, and Related Federal and State Permitting Actions,
Crow Indian Reservation, Crow Tribe, Bighorn County, MT.
Summary: EPA expressed environmental concerns about impacts to
ground and surface water and cumulative air impacts. Rating EC2.
EIS No. 20080119, ERP No. D-USN-K10011-CA, Southern California Range
Complex, To Organize, Train, Equip, and Maintain Combat-Ready Naval
Forces, San Diego, Orange and Los Angeles Counties, CA.
Summary: EPA expressed environmental concerns about impacts to
marine resources. Rating EC2.
EIS No. 20080133, ERP No. D-NPS-G65108-TX, Guadalupe Mountains National
Park, General Management Plan, Implementation, Culberson and Hudspeth
Counties, TX.
Summary: EPA does not object to the preferred alternative. Rating
LO.
Final EISs
EIS No. 20080140, ERP No. F-DOI-J39030-UT, Lower Duchesne River
Wetlands Mitigation Project (LDWP), Restoration Measures in the Lower
Duchesne River Area, Strawberry Aqueduct and Collection System (SACS)
on portion of the Strawberry Reservoir, Implementation, Ute Indian
Tribe, NPDES and U.S. Army COE section 404 Permits, Duchesne, Utah,
Uintah Counties, UT.
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20080145, ERP No. F-FRC-F03011-00, Rockies Express Pipeline
Project, (REX-East), Construction and Operation of Natural Gas Pipeline
Facilities, WY, NE, MO, IL, IN and OH.
Summary: EPA continues to have environmental concerns about impacts
to surface/ground water, wetlands, air quality, and upland forest
habitat, and recommends additional mitigation plans/measures be
included in the ROD or equivalent FERC order.
EIS No. 20080152, ERP No. F-FRC-E05103-NC, Yadkin--Yadkin-Pee Dee Hydro
Electric Project (Docket Nos. P-2197-073 & P-2206-030), Issuance of New
Licenses for the Existing and Proposed Hydropower Projects, Yadkin--
Yadkin-Pee Dee Rivers, Davidson, Davie, Montgomery, Rowan, Stanly,
Anson and Richmond Counties, NC.
Summary: EPA's previous concerns have been resolved; therefore, EPA
does not object to the proposed action.
EIS No. 20080178, ERP No. F-AFS-J65486-UT, Big Creek Vegetation
Treatment Project, Preferred Alternative is 1, To Treat 4,800 Acres of
Aspen Conifer and Sagebrush Communities, Ogden Ranger District,
Wasatch-Cache National Forest, Rich County, UT.
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20080151, ERP No. FA-AFS-K65286-CA, Watdog Project, Additional
Clarification of Changes Between the Final EIS (2005) and Final
Supplement EIS (2007), Feather River Ranger District, Plumas National
Forest, Butte and Plumas Counties, CA.
Summary: EPA continues to have environmental concerns about
cumulative impacts to watersheds and short-term impacts to old-forest
species, and recommends a less-intensive harvest alternative.
EIS No. 20080173, ERP No. FS-FTA-G40190-TX, North Corridor Fixed
Guideway Project, Updated/Additional Information on the Locally
Preferred Alternative, Propose Transit Improvements from University of
Houston (UH)-Downtown Station to Northline Mall, Harris County, TX.
Summary: No formal comment letter was sent to the preparing agency.
[[Page 35133]]
EIS No. 20080179, ERP No. FS-FTA-G40191-TX, Southeast Corridor Project,
Preferred Alternative is the Light Rail Alternative, Proposed Fixed-
Guideway Transit System, Funding, Metropolitan Transit Authority
(METRO) of Harris County, Houston, Harris County, TX.
Summary: No formal comment letter was sent to the preparing agency.
Dated: June 17, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E8-14004 Filed 6-19-08; 8:45 am]
BILLING CODE 6560-50-P