Wade Jacobsen; Turnbull Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments, Motions To Intervene, and Protests, 35129-35130 [E8-13949]

Download as PDF Federal Register / Vol. 73, No. 120 / Friday, June 20, 2008 / Notices comments on the described application. A copy of the application may be obtained by agencies directly from the Applicants. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicants’ representatives. Kimberly D. Bose, Secretary. [FR Doc. E8–13950 Filed 6–19–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11068–011] Orange Cove Irrigation District; Friant Power Authority; Notice of Application for Transfer of License, and Soliciting Comments, Motions To Intervene, and Protests jlentini on PROD1PC65 with NOTICES June 13, 2008. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Transfer of License. b. Project No.: 11068–011. c. Date Filed: April 2, 2008. d. Applicants: Orange Cove Irrigation District (transferor) and Friant Power Authority (Transferee). e. Name and Location of Project: Fishwater Release Project is located on the San Joaquin River in Fresno and Madera Counties, California. f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. g. Applicant Contacts: For the transferor: Harvey Bailey, Orange Cove Irrigation District, P.O. Box 308, Orange Cove, CA 93646–0308. For the transferee: Harvey Bailey, Orange Cove Irrigation District, P.O. Box 308, Orange Cove, CA 93646–0308 and William R. Carlisle, Friant Power Authority, P.O. Box 279, Delano, CA 93216. h. FERC Contact: Robert Bell at (202) 502–6062. i. Deadline for filing comments, protests, and motions to intervene: July 14, 2008. All documents (original and eight copies) should be filed with: Kimberly Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See 18 CFR VerDate Aug<31>2005 16:53 Jun 19, 2008 Jkt 214001 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Please include the Project Number on any comments or motions filed. The Commission’s Rules of Practice and Procedure require all intervenors filing a document with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the documents on that resource agency. j. Description of Application: Applicants seek Commission approval to transfer the license for the Fishwater Release Project from Orange Cove Irrigation District, to Orange Cove Irrigation District and Friant Power Authority, in light of an April 7, 2006 conveyance of project property. k. This filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the eLibrary link. Enter the docket number (P–11068) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the addresses in item g above. l. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. m. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. n. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, OR ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 35129 documents must be filed by providing the original and eight copies to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A copy of any motion to intervene must also be served upon each representative of the Applicants specified in the particular application. o. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicants. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicants’ representatives. Kimberly D. Bose, Secretary. [FR Doc. E8–13948 Filed 6–19–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12599–011] Wade Jacobsen; Turnbull Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments, Motions To Intervene, and Protests June 13, 2008. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Transfer of License. b. Project No.: 12599–011. c. Date Filed: May 22, 2008. d. Applicants: Wade Jacobsen (transferor) and Turnbull Hydro, LLC (Transferee). e. Name and Location of Project: Mill Coulee drops Project is located on the Mill Coulee Canal in Cascade County, Montana. f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. g. Applicant Contacts: For the transferor: Ted S. Sorensen, 5203 South 11th Street, Idaho Falls, ID 83404. For the transferee: Ted S. Sorensen, 5203 South 11th Street, Idaho Falls, ID 83404. h. FERC Contact: Robert Bell at (202) 502–6062. i. Deadline for filing comments, protests, and motions to intervene: July 14, 2008. All documents (original and eight copies) should be filed with: Kimberly E:\FR\FM\20JNN1.SGM 20JNN1 jlentini on PROD1PC65 with NOTICES 35130 Federal Register / Vol. 73, No. 120 / Friday, June 20, 2008 / Notices Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Please include the Project Number on any comments or motions filed. The Commission’s Rules of Practice and Procedure require all intervenors filing a document with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the documents on that resource agency. j. Description of Application: Applicants seek Commission approval to transfer the license for the Mill Coulee Drops Project from Wade Jacobsen, to Turnbull Hydro, LLC. k. This filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the eLibrary link. Enter the docket number (P–3255) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the addresses in item g above. l. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. m. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. n. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, OR ‘‘MOTION TO INTERVENE’’, as VerDate Aug<31>2005 16:53 Jun 19, 2008 Jkt 214001 applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and eight copies to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. A copy of any motion to intervene must also be served upon each representative of the Applicants specified in the particular application. o. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicants. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicants’ representatives. Kimberly Bose, Secretary. [FR Doc. E8–13949 Filed 6–19–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 June 16, 2008. Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP96–200–192. Applicants: CenterPoint Energy Gas Transmission Co. Description: CenterPoint Energy Gas Transmission Co. submits two negotiated rate agreements with Connect Energy Services, LLC. Filed Date: 06/13/2008. Accession Number: 20080613–0074. Comment Date: 5 p.m. Eastern Time on Wednesday, June 25, 2008. Docket Numbers: RP08–358–001. Applicants: CenterPoint Energy Gas Transmission Co. Description: CenterPoint Energy Gas Transmission Co. submits Substitute Thirteenth Revised Sheet 32 et al. to FERC Gas Tariff, Sixth Revised Volume 1 to comply with the Commission’s Letter Order issued on 5/29/08, effective 6/1/08. Filed Date: 06/13/2008. Accession Number: 20080616–0001. Comment Date: 5 p.m. Eastern Time on Wednesday, June 25, 2008. Docket Numbers: RP08–360–001. Applicants: Northern Natural Gas Company. PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 Description: Northern Natural Gas Co. submits supportive information in compliance with FERC’s 5/29/08 Order. Filed Date: 06/11/2008. Accession Number: 20080612–0201. Comment Date: 5 p.m. Eastern Time on Monday, June 23, 2008. Docket Numbers: RP08–340–001. Applicants: Cheyenne Plains Gas Pipeline Company LLC. Description: Cheyenne Plains Gas Pipeline Company, LLC’s compliance filing of workpapers in support of the fuel gas and lost and unaccounted for gas reimbursement percentages. Filed Date: 06/12/2008. Accession Number: 20080613–0075. Comment Date: 5 p.m. Eastern Time on Tuesday, June 24, 2008. Docket Numbers: RP08–404–000. Applicants: Williston Basin Interstate Pipeline Co. Description: Williston Basin Interstate Pipeline Co. submits Fourteenth Revised Sheet 376 and 376A to FERC Gas Tariff, Second Revised Volume 1, to become effective 6/10/08. Filed Date: 06/10/2008. Accession Number: 20080611–0128. Comment Date: 5 p.m. Eastern Time on Monday, June 23, 2008. Docket Numbers: RP08–405–000. Applicants: National Fuel Gas Supply Corporation. Description: Petition of National Fuel Gas Supply Corp. for Waiver of Tariff Provisions. Filed Date: 06/10/2008. Accession Number: 20080611–0129. Comment Date: 5 p.m. Eastern Time on Monday, June 23, 2008. Docket Numbers: RP08–406–000. Applicants: El Paso Natural Gas Company. Description: El Paso Natural Gas Co submits a request for waiver of Section 5.1(a) of the General Terms and Conditions re FERC Gas Tariff, Second Revised Volume 1A. Filed Date: 06/11/2008. Accession Number: 20080612–0202. Comment Date: 5 p.m. Eastern Time on Monday, June 23, 2008. Docket Numbers: RP08–407–000. Applicants: El Paso Natural Gas Company. Description: El Paso Natural Gas Co submits Fifth Revised Sheet 226 to FERC Gas Tariff, Second Revised Volume 1A, to become effective on 7/ 14/08. Filed Date: 06/11/2008. Accession Number: 20080612–0203. Comment Date: 5 p.m. Eastern Time on Monday, June 23, 2008. Docket Numbers: RP08–408–000. Applicants: Saltville Gas Storage Company L.L.C. E:\FR\FM\20JNN1.SGM 20JNN1

Agencies

[Federal Register Volume 73, Number 120 (Friday, June 20, 2008)]
[Notices]
[Pages 35129-35130]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-13949]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12599-011]


Wade Jacobsen; Turnbull Hydro, LLC; Notice of Application for 
Transfer of License, and Soliciting Comments, Motions To Intervene, and 
Protests

June 13, 2008.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Transfer of License.
    b. Project No.: 12599-011.
    c. Date Filed: May 22, 2008.
    d. Applicants: Wade Jacobsen (transferor) and Turnbull Hydro, LLC 
(Transferee).
    e. Name and Location of Project: Mill Coulee drops Project is 
located on the Mill Coulee Canal in Cascade County, Montana.
    f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    g. Applicant Contacts: For the transferor: Ted S. Sorensen, 5203 
South 11th Street, Idaho Falls, ID 83404.
    For the transferee: Ted S. Sorensen, 5203 South 11th Street, Idaho 
Falls, ID 83404.
    h. FERC Contact: Robert Bell at (202) 502-6062.
    i. Deadline for filing comments, protests, and motions to 
intervene: July 14, 2008.
    All documents (original and eight copies) should be filed with: 
Kimberly

[[Page 35130]]

Bose, Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426. Comments, protests, and 
interventions may be filed electronically via the Internet in lieu of 
paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the 
Commission's Web site under the ``e-Filing'' link. The Commission 
strongly encourages electronic filings. Please include the Project 
Number on any comments or motions filed.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing a document with the Commission to serve a copy of 
that document on each person in the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the documents on that resource agency.
    j. Description of Application: Applicants seek Commission approval 
to transfer the license for the Mill Coulee Drops Project from Wade 
Jacobsen, to Turnbull Hydro, LLC.
    k. This filing is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's Web site at 
https://www.ferc.gov using the eLibrary link. Enter the docket number 
(P-3255) in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the addresses in item 
g above.
    l. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    m. Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    n. Filing and Service of Responsive Documents--Any filings must 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', OR 
``MOTION TO INTERVENE'', as applicable, and the Project Number of the 
particular application to which the filing refers. Any of the above-
named documents must be filed by providing the original and eight 
copies to: The Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426. A copy of any motion to 
intervene must also be served upon each representative of the 
Applicants specified in the particular application.
    o. Agency Comments--Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicants. 
If an agency does not file comments within the time specified for 
filing comments, it will be presumed to have no comments. One copy of 
an agency's comments must also be sent to the Applicants' 
representatives.

Kimberly Bose,
Secretary.
[FR Doc. E8-13949 Filed 6-19-08; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.