Office of New Reactors; Notice of Availability of the Final Interim Staff Guidance DC/COL-ISG-03 on Probabilistic Risk Assessment Information To Support Design Certification and Combined License Applications, 34347 [E8-13572]
Download as PDF
Federal Register / Vol. 73, No. 117 / Tuesday, June 17, 2008 / Notices
jlentini on PROD1PC65 with NOTICES
Date of application for amendments:
April 14, 2008, as supplemented on May
6, 2008.
Brief Description of amendments: The
proposed amendment allowed a onecycle revision to Surry Power Station,
Unit No. 2 Technical Specifications
(TSs). Specifically, TS 6.4.Q, ‘‘Steam
Generator (SG) Program,’’ and TS 6.6.3,
‘‘Steam Generator Tube Inspection
Report,’’ were revised to incorporate an
interim alternate repair criterion (IARC)
into the provisions for SG tube repair.
Date of issuance: May 16, 2008.
Effective date: As of the date of
issuance and shall be implemented
within 30 days.
Amendment No.: 258.
Renewed Facility Operating License
Nos. DPR–32 and DPR–37: Amendment
changed the license and the technical
specifications.
Date of initial notice in Federal
Register: 73 FR 22443 (April 25, 2008)
and Daily Press (May 12 and May 13,
2008). No comments have been
received.
The supplement dated May 6, 2008
requested approval of the amendment
based on exigent circumstances,
provided additional information that
clarified the application, did not expand
the scope of the original proposed no
significant hazards consideration
(NSHC) determination, and did not
change the NRC staff’s original proposed
NSHC determination.
The Commission’s related evaluation
of the amendment, finding of exigent
circumstances, state consultation, and
final NSHC determination are contained
in a safety evaluation dated May 16,
2008.
The Daily Press notice provided an
opportunity to submit comments by
May 15, 2008. No comments have been
received. The April 25, 2008 notice also
provided an opportunity to request a
hearing by June 24, 2008, but the Daily
Press Notice stated that ‘‘an opportunity
for a hearing will be published at a later
date.’’ The Daily Press Notice should
have stated that ‘‘an opportunity for a
hearing was previously published.’’
No significant hazards consideration
comments received: No.
Dated at Rockville, Maryland, this 5th day
of June 2008.
For The Nuclear Regulatory Commission.
Robert A. Nelson,
Deputy Director, Division of Operating
Reactor Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. E8–13218 Filed 6–16–08; 8:45 am]
BILLING CODE 7590–01–P
VerDate Aug<31>2005
17:16 Jun 16, 2008
Jkt 214001
NUCLEAR REGULATORY
COMMISSION
Office of New Reactors; Notice of
Availability of the Final Interim Staff
Guidance DC/COL–ISG–03 on
Probabilistic Risk Assessment
Information To Support Design
Certification and Combined License
Applications
Nuclear Regulatory
Commission (NRC).
ACTION: Notice of availability.
AGENCY:
SUMMARY: The NRC is issuing its Final
Interim Staff Guidance (ISG) DC/COL–
ISG–03 (ADAMS Accession No.
ML081430087). This ISG supplements
the guidance provided to the staff in
section 19.0, ‘‘Probabilistic Risk
Assessment and Severe Accident
Evaluation for New Reactors,’’ of
NUREG–0800, ‘‘Standard Review Plan
for the Review of Safety Analysis
Reports for Nuclear Power Plants,’’
concerning the review of probabilistic
risk assessment (PRA) information and
severe accident assessment submitted to
support design certification (DC) and
combined license (COL) applications.
The NRC staff issues DC/COL–ISGs to
facilitate timely implementation of the
current staff guidance and to facilitate
activities associated with review of
applications for DC and COLs by the
Office of New Reactors. The NRC staff
will also incorporate the approved DC/
COL–ISGs into the next revision to the
review guidance documents for new
reactor applications.
Disposition: On February 12, 2008,
the staff issued the proposed ISG
‘‘Probabilistic Risk Assessment
Information to Support Design
Certification and Combined License
Applications,’’ (COL/DC–ISG–003)
(ADAMS Accession No. ML080370218)
to solicit public and industry comment.
The staff received comments (ADAMS
Accession Nos. ML080810201,
ML080810204 and ML080840432) on
the proposed guidance on March 21,
2008. These comments were further
discussed in a public meeting held at
the NRC on May 8, 2008. This final
issuance incorporates changes from the
majority of the comments. To the extent
that comments are not incorporated in
this final issuance, the comments are
rejected by the staff or are outside the
scope of this guidance.
ADDRESSES: The NRC maintains an
Agencywide Documents Access and
Management System (ADAMS), which
provides text and image files of NRC’s
public documents. These documents
may be accessed through the NRC’s
Public Electronic Reading Room on the
PO 00000
Frm 00102
Fmt 4703
Sfmt 4703
34347
Internet at https://www.nrc.gov/readingrm/adams.html. Persons who do not
have access to ADAMS or who
encounter problems in accessing the
documents located in ADAMS should
contact the NRC Public Document Room
reference staff at 1–800–397–4209, 301–
415–4737, or by e-mail at pdr@nrc.gov.
Ms.
Lynn A. Mrowca, Chief, PRA Licensing,
Operations Support Maintenance
Branch 1, Division of Safety Systems
and Risk Assessment, Office of the New
Reactors, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001; telephone 301–415–0525 or e-mail
at lynn.mrowca@nrc.gov.
FOR FURTHER INFORMATION CONTACT:
The
agency posts its issued staff guidance in
the agency external Web page https://
www.nrc.gov/reading-rm/doccollections/isg/.
SUPPLEMENTARY INFORMATION:
Dated at Rockville, Maryland, this 11th day
of June 2008.
For the Nuclear Regulatory Commission,
George M. Tartal,
Acting Chief, Rulemaking, Guidance and
Advanced Reactor Branch, Division of New
Reactor Licensing, Office of New Reactors.
[FR Doc. E8–13572 Filed 6–16–08; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Sunshine Federal Register Notice
Weeks of June 16, 23, 30, July 4,
14, 21, 2008.
DATES:
Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
PLACE:
STATUS:
Public and Closed.
Week of June 16, 2008
Tuesday, June 17, 2008
12:55 p.m. Affirmation Session
(Public Meeting) (Tentative).
a. U.S. DOE (HLW Repository: PreApplication Matters), Docket No.
PAPO–00—The State of Nevada’s Notice
of Appeal from the PAPO Board’s 1/4/
08 and 12/12/07 Orders and The State
of Nevada’s Motion to File a Limited
Reply (Tentative).
b. AmerGen Energy Company, LLC,
(License Renewal for Oyster Creek
Nuclear Generating Station); Citizens’
Motion to Stay proceedings (Tentative).
c. U.S. Department of Energy (HighLevel Waste Repository: Pre-Application
Matters, Advisory PAPO Board),
Advisory PAPO Board Request for
Additional Authority (Tentative).
E:\FR\FM\17JNN1.SGM
17JNN1
Agencies
[Federal Register Volume 73, Number 117 (Tuesday, June 17, 2008)]
[Notices]
[Page 34347]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-13572]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Office of New Reactors; Notice of Availability of the Final
Interim Staff Guidance DC/COL-ISG-03 on Probabilistic Risk Assessment
Information To Support Design Certification and Combined License
Applications
AGENCY: Nuclear Regulatory Commission (NRC).
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The NRC is issuing its Final Interim Staff Guidance (ISG) DC/
COL-ISG-03 (ADAMS Accession No. ML081430087). This ISG supplements the
guidance provided to the staff in section 19.0, ``Probabilistic Risk
Assessment and Severe Accident Evaluation for New Reactors,'' of NUREG-
0800, ``Standard Review Plan for the Review of Safety Analysis Reports
for Nuclear Power Plants,'' concerning the review of probabilistic risk
assessment (PRA) information and severe accident assessment submitted
to support design certification (DC) and combined license (COL)
applications.
The NRC staff issues DC/COL-ISGs to facilitate timely
implementation of the current staff guidance and to facilitate
activities associated with review of applications for DC and COLs by
the Office of New Reactors. The NRC staff will also incorporate the
approved DC/COL-ISGs into the next revision to the review guidance
documents for new reactor applications.
Disposition: On February 12, 2008, the staff issued the proposed
ISG ``Probabilistic Risk Assessment Information to Support Design
Certification and Combined License Applications,'' (COL/DC-ISG-003)
(ADAMS Accession No. ML080370218) to solicit public and industry
comment. The staff received comments (ADAMS Accession Nos. ML080810201,
ML080810204 and ML080840432) on the proposed guidance on March 21,
2008. These comments were further discussed in a public meeting held at
the NRC on May 8, 2008. This final issuance incorporates changes from
the majority of the comments. To the extent that comments are not
incorporated in this final issuance, the comments are rejected by the
staff or are outside the scope of this guidance.
ADDRESSES: The NRC maintains an Agencywide Documents Access and
Management System (ADAMS), which provides text and image files of NRC's
public documents. These documents may be accessed through the NRC's
Public Electronic Reading Room on the Internet at https://www.nrc.gov/
reading-rm/adams.html. Persons who do not have access to ADAMS or who
encounter problems in accessing the documents located in ADAMS should
contact the NRC Public Document Room reference staff at 1-800-397-4209,
301-415-4737, or by e-mail at pdr@nrc.gov.
FOR FURTHER INFORMATION CONTACT: Ms. Lynn A. Mrowca, Chief, PRA
Licensing, Operations Support Maintenance Branch 1, Division of Safety
Systems and Risk Assessment, Office of the New Reactors, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001; telephone 301-415-
0525 or e-mail at lynn.mrowca@nrc.gov.
SUPPLEMENTARY INFORMATION: The agency posts its issued staff guidance
in the agency external Web page https://www.nrc.gov/reading-rm/doc-
collections/isg/.
Dated at Rockville, Maryland, this 11th day of June 2008.
For the Nuclear Regulatory Commission,
George M. Tartal,
Acting Chief, Rulemaking, Guidance and Advanced Reactor Branch,
Division of New Reactor Licensing, Office of New Reactors.