PJM RTO Filers et al; Notice of Filing and Setting Forth Timeline, 34010-34011 [E8-13423]

Download as PDF 34010 Federal Register / Vol. 73, No. 116 / Monday, June 16, 2008 / Notices you are interested in receiving an EA for review and/or comment, please return the Environmental Mailing List Form (appendix 3). If you do not return the Environmental Mailing List Form, you will be taken off the mailing list. All individuals who provide written comments will remain on our environmental mailing list for this project. rwilkins on PROD1PC63 with NOTICES Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at 1–866–208–FERC or on the FERC Internet Web site (https://www.ferc.gov) using the ‘‘eLibrary’’ link. Click on the eLibrary link, then on ‘‘General Search’’ and enter the docket number excluding the last three digits in the Docket Number field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries and direct links to the documents. Go to https:// www.ferc.gov/esubscribenow.htm. Finally, any public meetings or site visits scheduled for this proposed project will be posted on the Commission’s calendar located at https://www.ferc.gov/EventCalendar/ EventsList.aspx along with other related information. Kimberly D. Bose, Secretary. [FR Doc. E8–13418 Filed 6–13–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER99–3151–008, etc.] PJM RTO Filers et al; Notice of Filing and Setting Forth Timeline June 6, 2008. PSEG Energy Resources & Trade LLC ................................................................................................................. Public Service Electric and Gas Company .......................................................................................................... PSEG Power Connecticut LLC ............................................................................................................................. PSEG Fossil LLC ................................................................................................................................................... PSEG Nuclear LLC ................................................................................................................................................ Allegheny Power ................................................................................................................................................... Allegheny Energy Supply Company, LLC .......................................................................................................... Green Valley Hydro, LLC ..................................................................................................................................... Buchanan Generation, LLC .................................................................................................................................. PPL Electric Utilities Corporation, ...................................................................................................................... Lower Mount Bethel Energy, LLC ....................................................................................................................... PPL Brunner Island, LLC ..................................................................................................................................... PPL Holtwood, LLC .............................................................................................................................................. PPL Marlins Creek, LLC ....................................................................................................................................... PPL Montour, LLC ................................................................................................................................................ PPL Susquehanna, LLC ........................................................................................................................................ PPL University Park, LLC .................................................................................................................................... PPL EnergyPlus, LLC ............................................................................................................................................ PPL Edgewood Energy, LLC ................................................................................................................................. PPL Shoreham Energy, LLC ................................................................................................................................. PPL Great Works, LLC .......................................................................................................................................... PPL Maine, LLC .................................................................................................................................................... PPL Wallingford Energy LLC ............................................................................................................................... Atlantic City Electric Company ........................................................................................................................... Delmarva Power & Light Company ..................................................................................................................... Potomac Electric Power Company ....................................................................................................................... Conectiv Energy Supply, Inc. .............................................................................................................................. Conectiv Bethlehem, LLC ..................................................................................................................................... Pepco Energy Services, Inc. ................................................................................................................................. Bethlehem Renewable Energy, LLC ..................................................................................................................... Eastern Landfill Gas, LLC .................................................................................................................................... Potomac Power Resources, LLC ........................................................................................................................... Fauquier Landfill Gas, LLC .................................................................................................................................. Dominion Energy Marketing, Inc. ........................................................................................................................ Dominion Nuclear Connecticut, Inc. ................................................................................................................... Dominion Nuclear Marketing III, LLC ................................................................................................................. Dominion Energy Kewaunee, Inc. ....................................................................................................................... Dominion Energy Brayton Point, LLC ................................................................................................................. Dominion Energy Manchester Street, Inc. .......................................................................................................... Dominion Energy New England, Inc. .................................................................................................................. Dominion Energy Salem ....................................................................................................................................... Dominion Retail, Inc. ........................................................................................................................................... Elwood Energy, LLC ............................................................................................................................................. Fairless Energy, LLC ............................................................................................................................................. Kincaid Generation, LLC ...................................................................................................................................... State Line Energy, LLC ......................................................................................................................................... Virginia Electric and Power Company ................................................................................................................ Baltimore Gas and Electric Company .................................................................................................................. Constellation Power Source Generation, Inc. ..................................................................................................... Calvert Cliffs Nuclear Power Plant, Inc. ............................................................................................................. VerDate Aug<31>2005 17:04 Jun 13, 2008 Jkt 214001 PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 E:\FR\FM\16JNN1.SGM Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket 16JNN1 No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. ER99–3151–008. ER97–837–007. ER03–327–002. ER08–447–000. ER08–448–000. ER98–1466–005. ER00–814–006. ER00–2924–006. ER02–1638–005. ER00–1712–008. ER02–2408–003. ER00–744–006. ER00–744–006. ER00–744–006. ER00–744–006. ER00–744–006. ER02–1327–005. ER00–1703–003. ER02–1749–003. ER02–1747–003. ER99–4503–005. ER00–2186–003. ER01–1559–004. ER96–1361–013. ER99–2781–011. ER98–4138–009. ER00–1770–019. ER02–453–010. ER98–3096–015. ER07–903–002. ER05–1054–003. ER01–202–008. ER04–472–007. ER01–468–008. ER00–3621–009. ER00–3746–009. ER04–318–004. ER05–36–005. ER05–37–005. ER05–34–005. ER05–35–005. ER04–249–005. ER99–1695–010. ER02–23–011. ER97–30–006. ER96–2869–013. ER97–3561–005. ER00–1737–011. ER99–2948–012. ER00–2918–011. ER00–2917–011. 34011 Federal Register / Vol. 73, No. 116 / Monday, June 16, 2008 / Notices rwilkins on PROD1PC63 with NOTICES Constellation Energy Commodities Group, Inc. ................................................................................................. Handsome Lake Energy, LLC ............................................................................................................................... Nine Mile Point Nuclear Station, LLC ................................................................................................................ Constellation NewEnergy, Inc. ............................................................................................................................. Constellation Energy Commodities Group Maine, LLC ..................................................................................... R.E. Ginna Nuclear Power Plant, LLC ................................................................................................................. Raven One, LLC .................................................................................................................................................... Raven Two, LLC ................................................................................................................................................... Raven Three, LLC ................................................................................................................................................. Exelon Generation Company, LLC ...................................................................................................................... AmerGen Energy Company, LLC ......................................................................................................................... Commonwealth Edison Company ....................................................................................................................... Exelon Energy Company ...................................................................................................................................... PECO Energy Company ........................................................................................................................................ Exelon West Medway, LLC .................................................................................................................................. Exelon Wyman, LLC ............................................................................................................................................. Exelon New Boston, LLC ..................................................................................................................................... Exelon Framingham, LLC ..................................................................................................................................... Exelon New England Power Marketing, L.P. ...................................................................................................... FirstEnergy Operating Companies ....................................................................................................................... Pennsylvania Power Company, et al. .................................................................................................................. Jersey Central Power & Light Company .............................................................................................................. FirstEnergy Solutions Corp. ................................................................................................................................. FirstEnergy Generation Corporation .................................................................................................................... FirstEnergy Nuclear Generating Corporation ...................................................................................................... FirstEnergy Generating Mansfield Unit 1 Corp. ................................................................................................. Take notice that, as provided in the Notice Setting Forth Timeline issued May 22, 2008 in the above-referenced dockets, the comment period for the filings described below that were submitted on April 30, 2008, May 15, 2008, May 27, 2008, and June 2, 2008 in these dockets is established as set forth below. On April 30, 2008, PJM Interconnection, L.L.C. (PJM) filed a Motion To Intervene Out-Of-Time and Submission of The PJM Simultaneous Import Limitation Study, pursuant to the above captioned dockets for the PJM RTO Filers. PJM requested CEII treatment for the power flow cases for the Simultaneous Import Limitation Study. On May 15, 2008, in conjunction with a conference call held on May 15, 2008 in the above-captioned dockets, PJM filed documents that it discussed on the conference call. On May 27, 2008, PJM filed additional power flow cases to supplement the Simultaneous Import Limitation Study and requested CEII treatment for these power flow cases. On June 2, 2008, pursuant to the May 22, 2008 Notice Setting Forth Timeline, PJM filed a supplement to the PJM Simultaneous Import Limitation Study (i.e. , the PJM East Study) in the above captioned dockets. PJM requested CEII treatment for the supplemental power flow cases filed on June 2, 2008. The May 22, 2008 notice also stated that a subsequent notice will instruct the PJM RTO Filers on when they must comply with the remaining requirements of a staff data request sent to the PJM RTO Filers on April 4, 2008. A number of entities have filed requests VerDate Aug<31>2005 17:04 Jun 13, 2008 Jkt 214001 for clarification or rehearing of Order No. 697–A concerning the issue of how simultaneous transmission import capability is to be allocated among competing suppliers for purposes of performing the indicative screens.1 Notice is hereby given that the PJM RTO Filers must file their revised updated market power analyses 45 days after the date of issuance of a Commission order addressing the issue of how simultaneous transmission import capability is to be allocated among competing suppliers for purposes of performing the indicative screens. Any person desiring to intervene or to protest the above-referenced filings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the 1 Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities, Order No. 697, FERC Stats. & Regs. ¶ 31,252, clarified, 121 FERC ¶ 61,260 (2007), order on reh’g, Order No. 697–A, n. 208 FERC Stats. & Regs ¶ 31,268 (2008). PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket Docket No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. ER97–2261–022. ER01–556–010. ER01–1654–013. ER02–2567–011. ER02–699–005. ER04–485–008. ER07–247–003. ER07–245–003. ER07–244–003. ER00–3251–015. ER99–754–016. ER98–1734–014. ER01–1919–011. ER01–1147–006. ER01–513–021. ER01–513–021. ER01–513–021. ER01–513–021. ER99–2404–011. ER01–1403–006. ER06–1443–002. ER04–366–005. ER01–2968–007. ER01–845–006. ER05–1122–004. ER08–107–001. ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, D.C. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time 21 days after issuance of this notice. Kimberly D. Bose, Secretary. [FR Doc. E8–13423 Filed 6–13–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. ER08–747–000; ER08–747– 001] Beaver Ridge Wind, LLC; Notice of Issuance of Order June 6, 2008. Beaver Ridge Wind, LLC (Beaver Ridge) filed an application for marketbased rate authority, with an E:\FR\FM\16JNN1.SGM 16JNN1

Agencies

[Federal Register Volume 73, Number 116 (Monday, June 16, 2008)]
[Notices]
[Pages 34010-34011]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-13423]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER99-3151-008, etc.]


PJM RTO Filers et al; Notice of Filing and Setting Forth Timeline

June 6, 2008.

PSEG Energy Resources & Trade  Docket No. ER99-3151-008.
 LLC.
Public Service Electric and    Docket No. ER97-837-007.
 Gas Company.
PSEG Power Connecticut LLC...  Docket No. ER03-327-002.
PSEG Fossil LLC..............  Docket No. ER08-447-000.
PSEG Nuclear LLC.............  Docket No. ER08-448-000.
Allegheny Power..............  Docket No. ER98-1466-005.
Allegheny Energy Supply        Docket No. ER00-814-006.
 Company, LLC.
Green Valley Hydro, LLC......  Docket No. ER00-2924-006.
Buchanan Generation, LLC.....  Docket No. ER02-1638-005.
PPL Electric Utilities         Docket No. ER00-1712-008.
 Corporation,.
Lower Mount Bethel Energy,     Docket No. ER02-2408-003.
 LLC.
PPL Brunner Island, LLC......  Docket No. ER00-744-006.
PPL Holtwood, LLC............  Docket No. ER00-744-006.
PPL Marlins Creek, LLC.......  Docket No. ER00-744-006.
PPL Montour, LLC.............  Docket No. ER00-744-006.
PPL Susquehanna, LLC.........  Docket No. ER00-744-006.
PPL University Park, LLC.....  Docket No. ER02-1327-005.
PPL EnergyPlus, LLC..........  Docket No. ER00-1703-003.
PPL Edgewood Energy, LLC.....  Docket No. ER02-1749-003.
PPL Shoreham Energy, LLC.....  Docket No. ER02-1747-003.
PPL Great Works, LLC.........  Docket No. ER99-4503-005.
PPL Maine, LLC...............  Docket No. ER00-2186-003.
PPL Wallingford Energy LLC...  Docket No. ER01-1559-004.
Atlantic City Electric         Docket No. ER96-1361-013.
 Company.
Delmarva Power & Light         Docket No. ER99-2781-011.
 Company.
Potomac Electric Power         Docket No. ER98-4138-009.
 Company.
Conectiv Energy Supply, Inc..  Docket No. ER00-1770-019.
Conectiv Bethlehem, LLC......  Docket No. ER02-453-010.
Pepco Energy Services, Inc...  Docket No. ER98-3096-015.
Bethlehem Renewable Energy,    Docket No. ER07-903-002.
 LLC.
Eastern Landfill Gas, LLC....  Docket No. ER05-1054-003.
Potomac Power Resources, LLC.  Docket No. ER01-202-008.
Fauquier Landfill Gas, LLC...  Docket No. ER04-472-007.
Dominion Energy Marketing,     Docket No. ER01-468-008.
 Inc..
Dominion Nuclear Connecticut,  Docket No. ER00-3621-009.
 Inc..
Dominion Nuclear Marketing     Docket No. ER00-3746-009.
 III, LLC.
Dominion Energy Kewaunee,      Docket No. ER04-318-004.
 Inc..
Dominion Energy Brayton        Docket No. ER05-36-005.
 Point, LLC.
Dominion Energy Manchester     Docket No. ER05-37-005.
 Street, Inc..
Dominion Energy New England,   Docket No. ER05-34-005.
 Inc..
Dominion Energy Salem........  Docket No. ER05-35-005.
Dominion Retail, Inc.........  Docket No. ER04-249-005.
Elwood Energy, LLC...........  Docket No. ER99-1695-010.
Fairless Energy, LLC.........  Docket No. ER02-23-011.
Kincaid Generation, LLC......  Docket No. ER97-30-006.
State Line Energy, LLC.......  Docket No. ER96-2869-013.
Virginia Electric and Power    Docket No. ER97-3561-005.
 Company.                      Docket No. ER00-1737-011.
Baltimore Gas and Electric     Docket No. ER99-2948-012.
 Company.
Constellation Power Source     Docket No. ER00-2918-011.
 Generation, Inc..
Calvert Cliffs Nuclear Power   Docket No. ER00-2917-011.
 Plant, Inc..

[[Page 34011]]

 
Constellation Energy           Docket No. ER97-2261-022.
 Commodities Group, Inc..
Handsome Lake Energy, LLC....  Docket No. ER01-556-010.
Nine Mile Point Nuclear        Docket No. ER01-1654-013.
 Station, LLC.
Constellation NewEnergy, Inc.  Docket No. ER02-2567-011.
Constellation Energy           Docket No. ER02-699-005.
 Commodities Group Maine, LLC.
R.E. Ginna Nuclear Power       Docket No. ER04-485-008.
 Plant, LLC.
Raven One, LLC...............  Docket No. ER07-247-003.
Raven Two, LLC...............  Docket No. ER07-245-003.
Raven Three, LLC.............  Docket No. ER07-244-003.
Exelon Generation Company,     Docket No. ER00-3251-015.
 LLC.
AmerGen Energy Company, LLC..  Docket No. ER99-754-016.
Commonwealth Edison Company..  Docket No. ER98-1734-014.
Exelon Energy Company........  Docket No. ER01-1919-011.
PECO Energy Company..........  Docket No. ER01-1147-006.
Exelon West Medway, LLC......  Docket No. ER01-513-021.
Exelon Wyman, LLC............  Docket No. ER01-513-021.
Exelon New Boston, LLC.......  Docket No. ER01-513-021.
Exelon Framingham, LLC.......  Docket No. ER01-513-021.
Exelon New England Power       Docket No. ER99-2404-011.
 Marketing, L.P..
FirstEnergy Operating          Docket No. ER01-1403-006.
 Companies.
Pennsylvania Power Company,    Docket No. ER06-1443-002.
 et al..
Jersey Central Power & Light   Docket No. ER04-366-005.
 Company.
FirstEnergy Solutions Corp...  Docket No. ER01-2968-007.
FirstEnergy Generation         Docket No. ER01-845-006.
 Corporation.
FirstEnergy Nuclear            Docket No. ER05-1122-004.
 Generating Corporation.
FirstEnergy Generating         Docket No. ER08-107-001.
 Mansfield Unit 1 Corp..
 

    Take notice that, as provided in the Notice Setting Forth Timeline 
issued May 22, 2008 in the above-referenced dockets, the comment period 
for the filings described below that were submitted on April 30, 2008, 
May 15, 2008, May 27, 2008, and June 2, 2008 in these dockets is 
established as set forth below.
    On April 30, 2008, PJM Interconnection, L.L.C. (PJM) filed a Motion 
To Intervene Out-Of-Time and Submission of The PJM Simultaneous Import 
Limitation Study, pursuant to the above captioned dockets for the PJM 
RTO Filers. PJM requested CEII treatment for the power flow cases for 
the Simultaneous Import Limitation Study.
    On May 15, 2008, in conjunction with a conference call held on May 
15, 2008 in the above-captioned dockets, PJM filed documents that it 
discussed on the conference call. On May 27, 2008, PJM filed additional 
power flow cases to supplement the Simultaneous Import Limitation Study 
and requested CEII treatment for these power flow cases.
    On June 2, 2008, pursuant to the May 22, 2008 Notice Setting Forth 
Timeline, PJM filed a supplement to the PJM Simultaneous Import 
Limitation Study (i.e. , the PJM East Study) in the above captioned 
dockets. PJM requested CEII treatment for the supplemental power flow 
cases filed on June 2, 2008.
    The May 22, 2008 notice also stated that a subsequent notice will 
instruct the PJM RTO Filers on when they must comply with the remaining 
requirements of a staff data request sent to the PJM RTO Filers on 
April 4, 2008. A number of entities have filed requests for 
clarification or rehearing of Order No. 697-A concerning the issue of 
how simultaneous transmission import capability is to be allocated 
among competing suppliers for purposes of performing the indicative 
screens.\1\ Notice is hereby given that the PJM RTO Filers must file 
their revised updated market power analyses 45 days after the date of 
issuance of a Commission order addressing the issue of how simultaneous 
transmission import capability is to be allocated among competing 
suppliers for purposes of performing the indicative screens.
---------------------------------------------------------------------------

    \1\ Market-Based Rates for Wholesale Sales of Electric Energy, 
Capacity and Ancillary Services by Public Utilities, Order No. 697, 
FERC Stats. & Regs. ] 31,252, clarified, 121 FERC ] 61,260 (2007), 
order on reh'g, Order No. 697-A, n. 208 FERC Stats. & Regs ] 31,268 
(2008).
---------------------------------------------------------------------------

    Any person desiring to intervene or to protest the above-referenced 
filings must file in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211, 385.214). 
Protests will be considered by the Commission in determining the 
appropriate action to be taken, but will not serve to make protestants 
parties to the proceeding. Any person wishing to become a party must 
file a notice of intervention or motion to intervene, as appropriate. 
Such notices, motions, or protests must be filed on or before the 
comment date. Anyone filing a motion to intervene or protest must serve 
a copy of that document on the Applicant and all the parties in this 
proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, D.C. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time 21 days after issuance of this 
notice.

Kimberly D. Bose,
Secretary.
 [FR Doc. E8-13423 Filed 6-13-08; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.