PJM RTO Filers et al; Notice of Filing and Setting Forth Timeline, 34010-34011 [E8-13423]
Download as PDF
34010
Federal Register / Vol. 73, No. 116 / Monday, June 16, 2008 / Notices
you are interested in receiving an EA for
review and/or comment, please return
the Environmental Mailing List Form
(appendix 3). If you do not return the
Environmental Mailing List Form, you
will be taken off the mailing list. All
individuals who provide written
comments will remain on our
environmental mailing list for this
project.
rwilkins on PROD1PC63 with NOTICES
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the ‘‘eLibrary’’ link. Click on the
eLibrary link, then on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, any public meetings or site
visits scheduled for this proposed
project will be posted on the
Commission’s calendar located at
https://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–13418 Filed 6–13–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER99–3151–008, etc.]
PJM RTO Filers et al; Notice of Filing
and Setting Forth Timeline
June 6, 2008.
PSEG Energy Resources & Trade LLC .................................................................................................................
Public Service Electric and Gas Company ..........................................................................................................
PSEG Power Connecticut LLC .............................................................................................................................
PSEG Fossil LLC ...................................................................................................................................................
PSEG Nuclear LLC ................................................................................................................................................
Allegheny Power ...................................................................................................................................................
Allegheny Energy Supply Company, LLC ..........................................................................................................
Green Valley Hydro, LLC .....................................................................................................................................
Buchanan Generation, LLC ..................................................................................................................................
PPL Electric Utilities Corporation, ......................................................................................................................
Lower Mount Bethel Energy, LLC .......................................................................................................................
PPL Brunner Island, LLC .....................................................................................................................................
PPL Holtwood, LLC ..............................................................................................................................................
PPL Marlins Creek, LLC .......................................................................................................................................
PPL Montour, LLC ................................................................................................................................................
PPL Susquehanna, LLC ........................................................................................................................................
PPL University Park, LLC ....................................................................................................................................
PPL EnergyPlus, LLC ............................................................................................................................................
PPL Edgewood Energy, LLC .................................................................................................................................
PPL Shoreham Energy, LLC .................................................................................................................................
PPL Great Works, LLC ..........................................................................................................................................
PPL Maine, LLC ....................................................................................................................................................
PPL Wallingford Energy LLC ...............................................................................................................................
Atlantic City Electric Company ...........................................................................................................................
Delmarva Power & Light Company .....................................................................................................................
Potomac Electric Power Company .......................................................................................................................
Conectiv Energy Supply, Inc. ..............................................................................................................................
Conectiv Bethlehem, LLC .....................................................................................................................................
Pepco Energy Services, Inc. .................................................................................................................................
Bethlehem Renewable Energy, LLC .....................................................................................................................
Eastern Landfill Gas, LLC ....................................................................................................................................
Potomac Power Resources, LLC ...........................................................................................................................
Fauquier Landfill Gas, LLC ..................................................................................................................................
Dominion Energy Marketing, Inc. ........................................................................................................................
Dominion Nuclear Connecticut, Inc. ...................................................................................................................
Dominion Nuclear Marketing III, LLC .................................................................................................................
Dominion Energy Kewaunee, Inc. .......................................................................................................................
Dominion Energy Brayton Point, LLC .................................................................................................................
Dominion Energy Manchester Street, Inc. ..........................................................................................................
Dominion Energy New England, Inc. ..................................................................................................................
Dominion Energy Salem .......................................................................................................................................
Dominion Retail, Inc. ...........................................................................................................................................
Elwood Energy, LLC .............................................................................................................................................
Fairless Energy, LLC .............................................................................................................................................
Kincaid Generation, LLC ......................................................................................................................................
State Line Energy, LLC .........................................................................................................................................
Virginia Electric and Power Company ................................................................................................................
Baltimore Gas and Electric Company ..................................................................................................................
Constellation Power Source Generation, Inc. .....................................................................................................
Calvert Cliffs Nuclear Power Plant, Inc. .............................................................................................................
VerDate Aug<31>2005
17:04 Jun 13, 2008
Jkt 214001
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
E:\FR\FM\16JNN1.SGM
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
16JNN1
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
ER99–3151–008.
ER97–837–007.
ER03–327–002.
ER08–447–000.
ER08–448–000.
ER98–1466–005.
ER00–814–006.
ER00–2924–006.
ER02–1638–005.
ER00–1712–008.
ER02–2408–003.
ER00–744–006.
ER00–744–006.
ER00–744–006.
ER00–744–006.
ER00–744–006.
ER02–1327–005.
ER00–1703–003.
ER02–1749–003.
ER02–1747–003.
ER99–4503–005.
ER00–2186–003.
ER01–1559–004.
ER96–1361–013.
ER99–2781–011.
ER98–4138–009.
ER00–1770–019.
ER02–453–010.
ER98–3096–015.
ER07–903–002.
ER05–1054–003.
ER01–202–008.
ER04–472–007.
ER01–468–008.
ER00–3621–009.
ER00–3746–009.
ER04–318–004.
ER05–36–005.
ER05–37–005.
ER05–34–005.
ER05–35–005.
ER04–249–005.
ER99–1695–010.
ER02–23–011.
ER97–30–006.
ER96–2869–013.
ER97–3561–005.
ER00–1737–011.
ER99–2948–012.
ER00–2918–011.
ER00–2917–011.
34011
Federal Register / Vol. 73, No. 116 / Monday, June 16, 2008 / Notices
rwilkins on PROD1PC63 with NOTICES
Constellation Energy Commodities Group, Inc. .................................................................................................
Handsome Lake Energy, LLC ...............................................................................................................................
Nine Mile Point Nuclear Station, LLC ................................................................................................................
Constellation NewEnergy, Inc. .............................................................................................................................
Constellation Energy Commodities Group Maine, LLC .....................................................................................
R.E. Ginna Nuclear Power Plant, LLC .................................................................................................................
Raven One, LLC ....................................................................................................................................................
Raven Two, LLC ...................................................................................................................................................
Raven Three, LLC .................................................................................................................................................
Exelon Generation Company, LLC ......................................................................................................................
AmerGen Energy Company, LLC .........................................................................................................................
Commonwealth Edison Company .......................................................................................................................
Exelon Energy Company ......................................................................................................................................
PECO Energy Company ........................................................................................................................................
Exelon West Medway, LLC ..................................................................................................................................
Exelon Wyman, LLC .............................................................................................................................................
Exelon New Boston, LLC .....................................................................................................................................
Exelon Framingham, LLC .....................................................................................................................................
Exelon New England Power Marketing, L.P. ......................................................................................................
FirstEnergy Operating Companies .......................................................................................................................
Pennsylvania Power Company, et al. ..................................................................................................................
Jersey Central Power & Light Company ..............................................................................................................
FirstEnergy Solutions Corp. .................................................................................................................................
FirstEnergy Generation Corporation ....................................................................................................................
FirstEnergy Nuclear Generating Corporation ......................................................................................................
FirstEnergy Generating Mansfield Unit 1 Corp. .................................................................................................
Take notice that, as provided in the
Notice Setting Forth Timeline issued
May 22, 2008 in the above-referenced
dockets, the comment period for the
filings described below that were
submitted on April 30, 2008, May 15,
2008, May 27, 2008, and June 2, 2008
in these dockets is established as set
forth below.
On April 30, 2008, PJM
Interconnection, L.L.C. (PJM) filed a
Motion To Intervene Out-Of-Time and
Submission of The PJM Simultaneous
Import Limitation Study, pursuant to
the above captioned dockets for the PJM
RTO Filers. PJM requested CEII
treatment for the power flow cases for
the Simultaneous Import Limitation
Study.
On May 15, 2008, in conjunction with
a conference call held on May 15, 2008
in the above-captioned dockets, PJM
filed documents that it discussed on the
conference call. On May 27, 2008, PJM
filed additional power flow cases to
supplement the Simultaneous Import
Limitation Study and requested CEII
treatment for these power flow cases.
On June 2, 2008, pursuant to the May
22, 2008 Notice Setting Forth Timeline,
PJM filed a supplement to the PJM
Simultaneous Import Limitation Study
(i.e. , the PJM East Study) in the above
captioned dockets. PJM requested CEII
treatment for the supplemental power
flow cases filed on June 2, 2008.
The May 22, 2008 notice also stated
that a subsequent notice will instruct
the PJM RTO Filers on when they must
comply with the remaining
requirements of a staff data request sent
to the PJM RTO Filers on April 4, 2008.
A number of entities have filed requests
VerDate Aug<31>2005
17:04 Jun 13, 2008
Jkt 214001
for clarification or rehearing of Order
No. 697–A concerning the issue of how
simultaneous transmission import
capability is to be allocated among
competing suppliers for purposes of
performing the indicative screens.1
Notice is hereby given that the PJM RTO
Filers must file their revised updated
market power analyses 45 days after the
date of issuance of a Commission order
addressing the issue of how
simultaneous transmission import
capability is to be allocated among
competing suppliers for purposes of
performing the indicative screens.
Any person desiring to intervene or to
protest the above-referenced filings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211, 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
motion to intervene, as appropriate.
Such notices, motions, or protests must
be filed on or before the comment date.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant and all the
parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
1 Market-Based Rates for Wholesale Sales of
Electric Energy, Capacity and Ancillary Services by
Public Utilities, Order No. 697, FERC Stats. & Regs.
¶ 31,252, clarified, 121 FERC ¶ 61,260 (2007), order
on reh’g, Order No. 697–A, n. 208 FERC Stats. &
Regs ¶ 31,268 (2008).
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
ER97–2261–022.
ER01–556–010.
ER01–1654–013.
ER02–2567–011.
ER02–699–005.
ER04–485–008.
ER07–247–003.
ER07–245–003.
ER07–244–003.
ER00–3251–015.
ER99–754–016.
ER98–1734–014.
ER01–1919–011.
ER01–1147–006.
ER01–513–021.
ER01–513–021.
ER01–513–021.
ER01–513–021.
ER99–2404–011.
ER01–1403–006.
ER06–1443–002.
ER04–366–005.
ER01–2968–007.
ER01–845–006.
ER05–1122–004.
ER08–107–001.
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, D.C.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
21 days after issuance of this notice.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–13423 Filed 6–13–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER08–747–000; ER08–747–
001]
Beaver Ridge Wind, LLC; Notice of
Issuance of Order
June 6, 2008.
Beaver Ridge Wind, LLC (Beaver
Ridge) filed an application for marketbased rate authority, with an
E:\FR\FM\16JNN1.SGM
16JNN1
Agencies
[Federal Register Volume 73, Number 116 (Monday, June 16, 2008)]
[Notices]
[Pages 34010-34011]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-13423]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER99-3151-008, etc.]
PJM RTO Filers et al; Notice of Filing and Setting Forth Timeline
June 6, 2008.
PSEG Energy Resources & Trade Docket No. ER99-3151-008.
LLC.
Public Service Electric and Docket No. ER97-837-007.
Gas Company.
PSEG Power Connecticut LLC... Docket No. ER03-327-002.
PSEG Fossil LLC.............. Docket No. ER08-447-000.
PSEG Nuclear LLC............. Docket No. ER08-448-000.
Allegheny Power.............. Docket No. ER98-1466-005.
Allegheny Energy Supply Docket No. ER00-814-006.
Company, LLC.
Green Valley Hydro, LLC...... Docket No. ER00-2924-006.
Buchanan Generation, LLC..... Docket No. ER02-1638-005.
PPL Electric Utilities Docket No. ER00-1712-008.
Corporation,.
Lower Mount Bethel Energy, Docket No. ER02-2408-003.
LLC.
PPL Brunner Island, LLC...... Docket No. ER00-744-006.
PPL Holtwood, LLC............ Docket No. ER00-744-006.
PPL Marlins Creek, LLC....... Docket No. ER00-744-006.
PPL Montour, LLC............. Docket No. ER00-744-006.
PPL Susquehanna, LLC......... Docket No. ER00-744-006.
PPL University Park, LLC..... Docket No. ER02-1327-005.
PPL EnergyPlus, LLC.......... Docket No. ER00-1703-003.
PPL Edgewood Energy, LLC..... Docket No. ER02-1749-003.
PPL Shoreham Energy, LLC..... Docket No. ER02-1747-003.
PPL Great Works, LLC......... Docket No. ER99-4503-005.
PPL Maine, LLC............... Docket No. ER00-2186-003.
PPL Wallingford Energy LLC... Docket No. ER01-1559-004.
Atlantic City Electric Docket No. ER96-1361-013.
Company.
Delmarva Power & Light Docket No. ER99-2781-011.
Company.
Potomac Electric Power Docket No. ER98-4138-009.
Company.
Conectiv Energy Supply, Inc.. Docket No. ER00-1770-019.
Conectiv Bethlehem, LLC...... Docket No. ER02-453-010.
Pepco Energy Services, Inc... Docket No. ER98-3096-015.
Bethlehem Renewable Energy, Docket No. ER07-903-002.
LLC.
Eastern Landfill Gas, LLC.... Docket No. ER05-1054-003.
Potomac Power Resources, LLC. Docket No. ER01-202-008.
Fauquier Landfill Gas, LLC... Docket No. ER04-472-007.
Dominion Energy Marketing, Docket No. ER01-468-008.
Inc..
Dominion Nuclear Connecticut, Docket No. ER00-3621-009.
Inc..
Dominion Nuclear Marketing Docket No. ER00-3746-009.
III, LLC.
Dominion Energy Kewaunee, Docket No. ER04-318-004.
Inc..
Dominion Energy Brayton Docket No. ER05-36-005.
Point, LLC.
Dominion Energy Manchester Docket No. ER05-37-005.
Street, Inc..
Dominion Energy New England, Docket No. ER05-34-005.
Inc..
Dominion Energy Salem........ Docket No. ER05-35-005.
Dominion Retail, Inc......... Docket No. ER04-249-005.
Elwood Energy, LLC........... Docket No. ER99-1695-010.
Fairless Energy, LLC......... Docket No. ER02-23-011.
Kincaid Generation, LLC...... Docket No. ER97-30-006.
State Line Energy, LLC....... Docket No. ER96-2869-013.
Virginia Electric and Power Docket No. ER97-3561-005.
Company. Docket No. ER00-1737-011.
Baltimore Gas and Electric Docket No. ER99-2948-012.
Company.
Constellation Power Source Docket No. ER00-2918-011.
Generation, Inc..
Calvert Cliffs Nuclear Power Docket No. ER00-2917-011.
Plant, Inc..
[[Page 34011]]
Constellation Energy Docket No. ER97-2261-022.
Commodities Group, Inc..
Handsome Lake Energy, LLC.... Docket No. ER01-556-010.
Nine Mile Point Nuclear Docket No. ER01-1654-013.
Station, LLC.
Constellation NewEnergy, Inc. Docket No. ER02-2567-011.
Constellation Energy Docket No. ER02-699-005.
Commodities Group Maine, LLC.
R.E. Ginna Nuclear Power Docket No. ER04-485-008.
Plant, LLC.
Raven One, LLC............... Docket No. ER07-247-003.
Raven Two, LLC............... Docket No. ER07-245-003.
Raven Three, LLC............. Docket No. ER07-244-003.
Exelon Generation Company, Docket No. ER00-3251-015.
LLC.
AmerGen Energy Company, LLC.. Docket No. ER99-754-016.
Commonwealth Edison Company.. Docket No. ER98-1734-014.
Exelon Energy Company........ Docket No. ER01-1919-011.
PECO Energy Company.......... Docket No. ER01-1147-006.
Exelon West Medway, LLC...... Docket No. ER01-513-021.
Exelon Wyman, LLC............ Docket No. ER01-513-021.
Exelon New Boston, LLC....... Docket No. ER01-513-021.
Exelon Framingham, LLC....... Docket No. ER01-513-021.
Exelon New England Power Docket No. ER99-2404-011.
Marketing, L.P..
FirstEnergy Operating Docket No. ER01-1403-006.
Companies.
Pennsylvania Power Company, Docket No. ER06-1443-002.
et al..
Jersey Central Power & Light Docket No. ER04-366-005.
Company.
FirstEnergy Solutions Corp... Docket No. ER01-2968-007.
FirstEnergy Generation Docket No. ER01-845-006.
Corporation.
FirstEnergy Nuclear Docket No. ER05-1122-004.
Generating Corporation.
FirstEnergy Generating Docket No. ER08-107-001.
Mansfield Unit 1 Corp..
Take notice that, as provided in the Notice Setting Forth Timeline
issued May 22, 2008 in the above-referenced dockets, the comment period
for the filings described below that were submitted on April 30, 2008,
May 15, 2008, May 27, 2008, and June 2, 2008 in these dockets is
established as set forth below.
On April 30, 2008, PJM Interconnection, L.L.C. (PJM) filed a Motion
To Intervene Out-Of-Time and Submission of The PJM Simultaneous Import
Limitation Study, pursuant to the above captioned dockets for the PJM
RTO Filers. PJM requested CEII treatment for the power flow cases for
the Simultaneous Import Limitation Study.
On May 15, 2008, in conjunction with a conference call held on May
15, 2008 in the above-captioned dockets, PJM filed documents that it
discussed on the conference call. On May 27, 2008, PJM filed additional
power flow cases to supplement the Simultaneous Import Limitation Study
and requested CEII treatment for these power flow cases.
On June 2, 2008, pursuant to the May 22, 2008 Notice Setting Forth
Timeline, PJM filed a supplement to the PJM Simultaneous Import
Limitation Study (i.e. , the PJM East Study) in the above captioned
dockets. PJM requested CEII treatment for the supplemental power flow
cases filed on June 2, 2008.
The May 22, 2008 notice also stated that a subsequent notice will
instruct the PJM RTO Filers on when they must comply with the remaining
requirements of a staff data request sent to the PJM RTO Filers on
April 4, 2008. A number of entities have filed requests for
clarification or rehearing of Order No. 697-A concerning the issue of
how simultaneous transmission import capability is to be allocated
among competing suppliers for purposes of performing the indicative
screens.\1\ Notice is hereby given that the PJM RTO Filers must file
their revised updated market power analyses 45 days after the date of
issuance of a Commission order addressing the issue of how simultaneous
transmission import capability is to be allocated among competing
suppliers for purposes of performing the indicative screens.
---------------------------------------------------------------------------
\1\ Market-Based Rates for Wholesale Sales of Electric Energy,
Capacity and Ancillary Services by Public Utilities, Order No. 697,
FERC Stats. & Regs. ] 31,252, clarified, 121 FERC ] 61,260 (2007),
order on reh'g, Order No. 697-A, n. 208 FERC Stats. & Regs ] 31,268
(2008).
---------------------------------------------------------------------------
Any person desiring to intervene or to protest the above-referenced
filings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a notice of intervention or motion to intervene, as appropriate.
Such notices, motions, or protests must be filed on or before the
comment date. Anyone filing a motion to intervene or protest must serve
a copy of that document on the Applicant and all the parties in this
proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, D.C. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time 21 days after issuance of this
notice.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-13423 Filed 6-13-08; 8:45 am]
BILLING CODE 6717-01-P