Eugene Water and Electric Board; Notice of Meeting To Discuss Additional Information Responses, 34013 [E8-13417]

Download as PDF Federal Register / Vol. 73, No. 116 / Monday, June 16, 2008 / Notices rwilkins on PROD1PC63 with NOTICES would publish a separate notice in the Federal Register establishing a period of time for the filing of protests. Accordingly, any person desiring to be heard concerning the blanket approvals of issuances of securities or assumptions of liability by Valencia Power, should file a protest with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure. 18 CFR 385.211, 385.214 (2004). The Commission encourages the electronic submission of protests using the FERC Online link at https:// www.ferc.gov. Notice is hereby given that the deadline for filing protests is July 7, 2008. Absent a request to be heard in opposition to such blanket approvals by the deadline above, Valencia Power is authorized to issue securities and assume obligations or liabilities as a guarantor, indorser, surety, or otherwise in respect of any security of another person; provided that such issuance or assumption is for some lawful object within the corporate purposes of Valencia Power, compatible with the public interest, and is reasonably necessary or appropriate for such purposes. The Commission reserves the right to require a further showing that neither public nor private interests will be adversely affected by continued approvals of Valencia Power’s issuance of securities or assumptions of liability. Copies of the full text of the Director’s Order are available from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426. The Order may also be viewed on the Commission’s Web site at https://www.ferc.gov, using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Kimberly D. Bose, Secretary. [FR Doc. E8–13421 Filed 6–13–08; 8:45 am] BILLING CODE 6717–01–P VerDate Aug<31>2005 17:04 Jun 13, 2008 Jkt 214001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2242–078] Eugene Water and Electric Board; Notice of Meeting To Discuss Additional Information Responses June 6, 2008. a. Type of Application: New Major License. b. Project No.: 2242–078. c. Date Filed: November 24, 2006. d. Applicant: Eugene Water and Electric Board. e. Name of Project: Carmen-Smith Hydroelectric Project. f. Location: On the McKenzie River in Lane and Linn Counties, near McKenzie Bridge, Oregon. The project occupies approximately 560 acres of the Willamette National Forest. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Randy L. Berggren, General Manager, Eugene Water and Electric Board, 500 East 4th Avenue, P.O. Box 10148, Eugene, OR 97440, (541) 484–2411. i. Date and Time of Meeting: June 26, 2008, at 1 p.m. EST. j. Place: This meeting will primarily occur via conference call; however, it is possible to participate in person at the Federal Energy Regulatory Commission (FERC) located in Washington, D.C. See item n. below for obtaining instructions on how to participate in the meeting. k. FERC Contact: Bob Easton, (202) 502–6045 or robert.easton@ferc.gov. l. Background and Purpose of Meeting: On November 24, 2006, Eugene Water and Electric Board filed a license application for the Carmen-Smith Project (FERC No. 2242). On October 30, 2007, FERC staff issued a request for additional information. Eugene Water and Electric Board filed its response to the additional information request on April 29, 2008. The purpose of this meeting is to clarify several issues associated with the filing of this information. m. Proposed Agenda: 1. Introduction of Participants; 2. Response to AIR 1—sources of the fishway operational costs; 3. Response to AIR 15 and 24—the location of roads relative to project boundary and their nexus to the project; 4. Response to AIR 16—effects of the proposed new road on spotted owl habitat; 5. Response to AIR 19—the location of Ice Creek, Trail Bridge, and Lakes End campgrounds and their nexus to the project; PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 34013 6. Response to AIR 24—acreage of federal lands within the project boundary 7. Other items; 8. Follow-up Actions. n. All local, state, and federal agencies, Indian tribes, and other interested parties are invited to participate by phone (or in person). Please contact Bob Easton (see item k. for contact information) or Patti Leppert ((202) 502–6034; patricia.leppert@ferc.gov) by June 24, 2008, to RSVP and to receive specific instructions on how to participate in the meeting. Kimberly D. Bose, Secretary. [FR Doc. E8–13417 Filed 6–13–08; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–R09–OAR–2008–0443; FRL–8580–1] Adequacy Status of Motor Vehicle Budget in Submitted Five Percent Plan for PM–10 for the Phoenix Metropolitan Nonattainment Area for Transportation Conformity Purposes; Arizona Environmental Protection Agency (EPA). ACTION: Notice of Adequacy. AGENCY: SUMMARY: In this notice, EPA is notifying the public that the Agency has found that the motor vehicle emissions budget in the submitted MAG 2007 Five Percent Plan for PM–10 for the Maricopa County Nonattainment Area (December 2007) (‘‘2007 MAG 5% Plan’’) is adequate for transportation conformity purposes. The 2007 MAG 5% Plan was submitted to EPA on December 21, 2007 by the Arizona Department of Environmental Quality as a revision to the Arizona state implementation plan. The 2007 MAG 5% Plan includes a demonstration of no less than five percent annual emissions reductions in particulate matter with an aerodynamic diameter less than or equal to a nominal 10 micrometers (PM–10) and a demonstration of PM–10 attainment in the Phoenix metropolitan area by 2010. As a result of our finding, the Maricopa Association of Governments and the U.S. Department of Transportation must use the motor vehicle emissions budget from the submitted five percent plan for PM–10 for future conformity determinations. DATES: This finding is effective July 1, 2008. FOR FURTHER INFORMATION CONTACT: Wienke Tax, U.S. EPA, Region IX, Air E:\FR\FM\16JNN1.SGM 16JNN1

Agencies

[Federal Register Volume 73, Number 116 (Monday, June 16, 2008)]
[Notices]
[Page 34013]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-13417]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2242-078]


Eugene Water and Electric Board; Notice of Meeting To Discuss 
Additional Information Responses

June 6, 2008.
    a. Type of Application: New Major License.
    b. Project No.: 2242-078.
    c. Date Filed: November 24, 2006.
    d. Applicant: Eugene Water and Electric Board.
    e. Name of Project: Carmen-Smith Hydroelectric Project.
    f. Location: On the McKenzie River in Lane and Linn Counties, near 
McKenzie Bridge, Oregon. The project occupies approximately 560 acres 
of the Willamette National Forest.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Randy L. Berggren, General Manager, Eugene 
Water and Electric Board, 500 East 4th Avenue, P.O. Box 10148, Eugene, 
OR 97440, (541) 484-2411.
    i. Date and Time of Meeting: June 26, 2008, at 1 p.m. EST.
    j. Place: This meeting will primarily occur via conference call; 
however, it is possible to participate in person at the Federal Energy 
Regulatory Commission (FERC) located in Washington, D.C. See item n. 
below for obtaining instructions on how to participate in the meeting.
    k. FERC Contact: Bob Easton, (202) 502-6045 or 
robert.easton@ferc.gov.
    l. Background and Purpose of Meeting: On November 24, 2006, Eugene 
Water and Electric Board filed a license application for the Carmen-
Smith Project (FERC No. 2242). On October 30, 2007, FERC staff issued a 
request for additional information. Eugene Water and Electric Board 
filed its response to the additional information request on April 29, 
2008. The purpose of this meeting is to clarify several issues 
associated with the filing of this information.
    m. Proposed Agenda:
    1. Introduction of Participants;
    2. Response to AIR 1--sources of the fishway operational costs;
    3. Response to AIR 15 and 24--the location of roads relative to 
project boundary and their nexus to the project;
    4. Response to AIR 16--effects of the proposed new road on spotted 
owl habitat;
    5. Response to AIR 19--the location of Ice Creek, Trail Bridge, and 
Lakes End campgrounds and their nexus to the project;
    6. Response to AIR 24--acreage of federal lands within the project 
boundary
    7. Other items;
    8. Follow-up Actions.
    n. All local, state, and federal agencies, Indian tribes, and other 
interested parties are invited to participate by phone (or in person). 
Please contact Bob Easton (see item k. for contact information) or 
Patti Leppert ((202) 502-6034; patricia.leppert@ferc.gov) by June 24, 
2008, to RSVP and to receive specific instructions on how to 
participate in the meeting.

Kimberly D. Bose,
Secretary.
 [FR Doc. E8-13417 Filed 6-13-08; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.