Allegheny Power; Allegheny Energy Supply Company, LLC; Green Valley Hydro, LLC; Buchanan Generation, LLC; Notice of Filing, 32701 [E8-12937]

Download as PDF dwashington3 on PRODPC61 with NOTICES Federal Register / Vol. 73, No. 112 / Tuesday, June 10, 2008 / Notices Applicants: Sabine Pipe Line LLC. Description: Sabine Pipe Line LLC submits Volume 1 of its FERC Gas Tariff effective July 1, 2008. Filed Date: 05/29/2008. Accession Number: 20080530–0321. Comment Date: 5 p.m. Eastern Time on Tuesday, June 10, 2008. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St. NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or VerDate Aug<31>2005 15:35 Jun 09, 2008 Jkt 211001 call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E8–12930 Filed 6–9–08; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P Federal Energy Regulatory Commission [Docket Nos. ER98–1466–005; ER00–814– 006; ER00–2924–006; ER02–1638–005] Allegheny Power; Allegheny Energy Supply Company, LLC; Green Valley Hydro, LLC; Buchanan Generation, LLC; Notice of Filing June 3, 2008. Take notice that on April 30, 2008, Allegheny Energy Supply Company, LLC, Green Valley Hydro, LLC and Buchanan Generation, LLC filed revised market-based rate tariffs to their triennial market power analysis filed with the Commission on January 14, 2008 and supplemented on April 21, 2008. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Frm 00027 Fmt 4703 Sfmt 4703 Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on June 13, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–12937 Filed 6–9–08; 8:45 am] DEPARTMENT OF ENERGY PO 00000 32701 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL08–61–000] Duke Energy Ohio, Inc.; Cinergy Corp.; Cinergy Power Investments, Inc.; Generating Facility LLCs; Notice of Filing June 3, 2008. Take notice that on April 23, 2008, Duke Energy Ohio, Inc., Cinergy Corp., Cinergy Power Investments, Inc. and Generating Facility LLCs also filed, along with its filing in Docket No. EC08–78–000, a petition for declaratory, in Docket No. EL08–61–000, requesting Commission action, pursuant to section 305(a) of the Federal Power Act. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to E:\FR\FM\10JNN1.SGM 10JNN1

Agencies

[Federal Register Volume 73, Number 112 (Tuesday, June 10, 2008)]
[Notices]
[Page 32701]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-12937]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. ER98-1466-005; ER00-814-006; ER00-2924-006; ER02-1638-005]


Allegheny Power; Allegheny Energy Supply Company, LLC; Green 
Valley Hydro, LLC; Buchanan Generation, LLC; Notice of Filing

June 3, 2008.
    Take notice that on April 30, 2008, Allegheny Energy Supply 
Company, LLC, Green Valley Hydro, LLC and Buchanan Generation, LLC 
filed revised market-based rate tariffs to their triennial market power 
analysis filed with the Commission on January 14, 2008 and supplemented 
on April 21, 2008.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all the parties in this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on June 13, 2008.

Kimberly D. Bose,
Secretary.
 [FR Doc. E8-12937 Filed 6-9-08; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.