Allegheny Power; Allegheny Energy Supply Company, LLC; Green Valley Hydro, LLC; Buchanan Generation, LLC; Notice of Filing, 32701 [E8-12937]
Download as PDF
dwashington3 on PRODPC61 with NOTICES
Federal Register / Vol. 73, No. 112 / Tuesday, June 10, 2008 / Notices
Applicants: Sabine Pipe Line LLC.
Description: Sabine Pipe Line LLC
submits Volume 1 of its FERC Gas Tariff
effective July 1, 2008.
Filed Date: 05/29/2008.
Accession Number: 20080530–0321.
Comment Date: 5 p.m. Eastern Time
on Tuesday, June 10, 2008.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or
VerDate Aug<31>2005
15:35 Jun 09, 2008
Jkt 211001
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8–12930 Filed 6–9–08; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
[Docket Nos. ER98–1466–005; ER00–814–
006; ER00–2924–006; ER02–1638–005]
Allegheny Power; Allegheny Energy
Supply Company, LLC; Green Valley
Hydro, LLC; Buchanan Generation,
LLC; Notice of Filing
June 3, 2008.
Take notice that on April 30, 2008,
Allegheny Energy Supply Company,
LLC, Green Valley Hydro, LLC and
Buchanan Generation, LLC filed revised
market-based rate tariffs to their
triennial market power analysis filed
with the Commission on January 14,
2008 and supplemented on April 21,
2008.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Frm 00027
Fmt 4703
Sfmt 4703
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on June 13, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–12937 Filed 6–9–08; 8:45 am]
DEPARTMENT OF ENERGY
PO 00000
32701
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL08–61–000]
Duke Energy Ohio, Inc.; Cinergy Corp.;
Cinergy Power Investments, Inc.;
Generating Facility LLCs; Notice of
Filing
June 3, 2008.
Take notice that on April 23, 2008,
Duke Energy Ohio, Inc., Cinergy Corp.,
Cinergy Power Investments, Inc. and
Generating Facility LLCs also filed,
along with its filing in Docket No.
EC08–78–000, a petition for declaratory,
in Docket No. EL08–61–000, requesting
Commission action, pursuant to section
305(a) of the Federal Power Act.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
E:\FR\FM\10JNN1.SGM
10JNN1
Agencies
[Federal Register Volume 73, Number 112 (Tuesday, June 10, 2008)]
[Notices]
[Page 32701]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-12937]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. ER98-1466-005; ER00-814-006; ER00-2924-006; ER02-1638-005]
Allegheny Power; Allegheny Energy Supply Company, LLC; Green
Valley Hydro, LLC; Buchanan Generation, LLC; Notice of Filing
June 3, 2008.
Take notice that on April 30, 2008, Allegheny Energy Supply
Company, LLC, Green Valley Hydro, LLC and Buchanan Generation, LLC
filed revised market-based rate tariffs to their triennial market power
analysis filed with the Commission on January 14, 2008 and supplemented
on April 21, 2008.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all the parties in this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on June 13, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-12937 Filed 6-9-08; 8:45 am]
BILLING CODE 6717-01-P