Tennessee Gas Pipeline Company; Notice of Availability of the Environmental Assessment for the Proposed Fitchburg Expansion Project, 32568 [E8-12848]

Download as PDF 32568 Federal Register / Vol. 73, No. 111 / Monday, June 9, 2008 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP08–63–000] Tennessee Gas Pipeline Company; Notice of Availability of the Environmental Assessment for the Proposed Fitchburg Expansion Project mstockstill on PROD1PC66 with NOTICES June 2, 2008. The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) on the natural gas pipeline facilities proposed by Tennessee Gas Pipeline Company (Tennessee) in the above-referenced docket. The EA was prepared to satisfy the requirements of the National Environmental Policy Act. The FERC staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major federal action significantly affecting the quality of the human environment. The EA assesses the potential environmental effects of the construction and operation of Tennessee’s proposed Fitchburg Expansion Project (Project). The Project would involve replacing approximately 5.1 miles of 6-inch-diameter pipeline with 12-inch-diameter pipeline on Tennessee’s existing Line 268–100 (Fitchburg Lateral) in Worcester County, Massachusetts; installing a pig launcher facility at the beginning of the Fitchburg Lateral in Framingham, Middlesex County, Massachusetts; and installing a pig receiver at the terminus of the Fitchburg Lateral (Milepost 5.1) in Lunenburg, Worcester County. The purpose of the Fitchburg Expansion Project is to provide 12,300 dekatherms per day of firm transportation service for the Massachusetts Development Financial Agency. The EA has been placed in the public files of the FERC. A limited number of copies of the EA are available for distribution and public inspection at: Federal Energy Regulatory Commission, Public Reference Room, 888 First Street, NE., Room 2A, Washington, DC 20426, (202) 502–8371. Copies of the EA have been mailed to federal, state, and local agencies, public interest groups, interested individuals, newspapers, and parties to this proceeding. Any person wishing to comment on the EA may do so. To ensure consideration prior to a Commission decision on the proposal, it is important VerDate Aug<31>2005 18:05 Jun 06, 2008 Jkt 214001 that we receive your comments before the date specified below. Please note that the Commission strongly encourages electronic filing of any comments or interventions or protests to this proceeding. See 18 Code of Federal Regulations 385.2001(a)(1)(iii) and the instructions on the Commission’s Internet Web site at https://www.ferc.gov under the link to ‘‘Documents and Filings’’ and ‘‘eFiling.’’ eFiling is a file attachment process and requires that you prepare your submission in the same manner as you would if filing on paper, and save it to a file on your hard drive. New eFiling users must first create an account by clicking on ‘‘Sign up’’ or ‘‘eRegister.’’ You will be asked to select the type of filing you are making. This filing is considered a ‘‘Comment on Filing.’’ In addition, there is a ‘‘Quick Comment’’ option available, which is an easy method for interested persons to submit text only comments on a project. The Quick-Comment User Guide can be viewed at https://www.ferc.gov/docsfiling/efiling/quick-comment-guide.pdf. Quick Comment does not require a FERC eRegistration account; however, you will be asked to provide a valid email address. All comments submitted under either eFiling or the Quick Comment option are placed in the public record for the specified docket. If you are filing written comments, please carefully follow these instructions to ensure that your comments are received in time and properly recorded: • Send an original and two copies of your comments to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First St., NE., Room 1A, Washington, DC 20426; • Reference Docket No. CP08–63– 000; • Label one copy of the comments for the attention of the Gas Branch 1, PJ– 11.1; and • Mail your comments so that they will be received in Washington, DC on or before July 2, 2008. Comments will be considered by the Commission but will not serve to make the commentor a party to the proceeding. Any person seeking to become a party to the proceeding must file a motion to intervene pursuant to Rule 214 of the Commission’s Rules of Practice and Procedures (18 CFR 385.214).1 Only intervenors have the right to seek rehearing of the Commission’s decision. Affected landowners and parties with environmental concerns may be granted 1 Interventions may also be filed electronically via the Internet in lieu of paper. See the previous discussion on filing comments electronically. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which would not be adequately represented by any other parties. You do not need intervenor status to have your comments considered. Additional information about the project is available from the Commission’s Office of External Affairs, at 1–866–208–FERC or on the FERC Internet Web site (https://www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number excluding the last three digits in the Docket Number field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries and direct links to the documents. Go to https:// www.ferc.gov/esubscribenow.htm. Kimberly D. Bose, Secretary. [FR Doc. E8–12848 Filed 6–6–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL08–67–000] Maryland Public Service Commission, Complainant, v. PJM Interconnection, L.L.C., Respondent; Notice of Complaint June 2, 2008. Take notice that on May 30, 2008, the Maryland Public Service Commission, the Delaware Public Service Commission, the Pennsylvania Public Utility Commission, the New Jersey Board of Public Utilities, the Public Power Association of New Jersey, the Maryland Office of People’s Counsel, the Office of the People’s Counsel of the District of Columbia, the Southern Maryland Electric Cooperative, Inc., Blue Ridge Power Agency, Allegheny Electric Cooperative, Inc., Office of the E:\FR\FM\09JNN1.SGM 09JNN1

Agencies

[Federal Register Volume 73, Number 111 (Monday, June 9, 2008)]
[Notices]
[Page 32568]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-12848]



[[Page 32568]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP08-63-000]


Tennessee Gas Pipeline Company; Notice of Availability of the 
Environmental Assessment for the Proposed Fitchburg Expansion Project

June 2, 2008.
    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) has prepared an environmental assessment (EA) on the 
natural gas pipeline facilities proposed by Tennessee Gas Pipeline 
Company (Tennessee) in the above-referenced docket.
    The EA was prepared to satisfy the requirements of the National 
Environmental Policy Act. The FERC staff concludes that approval of the 
proposed project, with appropriate mitigating measures, would not 
constitute a major federal action significantly affecting the quality 
of the human environment.
    The EA assesses the potential environmental effects of the 
construction and operation of Tennessee's proposed Fitchburg Expansion 
Project (Project). The Project would involve replacing approximately 
5.1 miles of 6-inch-diameter pipeline with 12-inch-diameter pipeline on 
Tennessee's existing Line 268-100 (Fitchburg Lateral) in Worcester 
County, Massachusetts; installing a pig launcher facility at the 
beginning of the Fitchburg Lateral in Framingham, Middlesex County, 
Massachusetts; and installing a pig receiver at the terminus of the 
Fitchburg Lateral (Milepost 5.1) in Lunenburg, Worcester County. The 
purpose of the Fitchburg Expansion Project is to provide 12,300 
dekatherms per day of firm transportation service for the Massachusetts 
Development Financial Agency.
    The EA has been placed in the public files of the FERC. A limited 
number of copies of the EA are available for distribution and public 
inspection at: Federal Energy Regulatory Commission, Public Reference 
Room, 888 First Street, NE., Room 2A, Washington, DC 20426, (202) 502-
8371.
    Copies of the EA have been mailed to federal, state, and local 
agencies, public interest groups, interested individuals, newspapers, 
and parties to this proceeding.
    Any person wishing to comment on the EA may do so. To ensure 
consideration prior to a Commission decision on the proposal, it is 
important that we receive your comments before the date specified 
below.
    Please note that the Commission strongly encourages electronic 
filing of any comments or interventions or protests to this proceeding. 
See 18 Code of Federal Regulations 385.2001(a)(1)(iii) and the 
instructions on the Commission's Internet Web site at https://
www.ferc.gov under the link to ``Documents and Filings'' and 
``eFiling.'' eFiling is a file attachment process and requires that you 
prepare your submission in the same manner as you would if filing on 
paper, and save it to a file on your hard drive. New eFiling users must 
first create an account by clicking on ``Sign up'' or ``eRegister.'' 
You will be asked to select the type of filing you are making. This 
filing is considered a ``Comment on Filing.'' In addition, there is a 
``Quick Comment'' option available, which is an easy method for 
interested persons to submit text only comments on a project. The 
Quick-Comment User Guide can be viewed at https://www.ferc.gov/docs-
filing/efiling/quick-comment-guide.pdf. Quick Comment does not require 
a FERC eRegistration account; however, you will be asked to provide a 
valid e-mail address. All comments submitted under either eFiling or 
the Quick Comment option are placed in the public record for the 
specified docket.
    If you are filing written comments, please carefully follow these 
instructions to ensure that your comments are received in time and 
properly recorded:
     Send an original and two copies of your comments to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First St., NE., Room 1A, Washington, DC 20426;
     Reference Docket No. CP08-63-000;
     Label one copy of the comments for the attention of the 
Gas Branch 1, PJ-11.1; and
     Mail your comments so that they will be received in 
Washington, DC on or before July 2, 2008.
    Comments will be considered by the Commission but will not serve to 
make the commentor a party to the proceeding. Any person seeking to 
become a party to the proceeding must file a motion to intervene 
pursuant to Rule 214 of the Commission's Rules of Practice and 
Procedures (18 CFR 385.214).\1\ Only intervenors have the right to seek 
rehearing of the Commission's decision.
---------------------------------------------------------------------------

    \1\ Interventions may also be filed electronically via the 
Internet in lieu of paper. See the previous discussion on filing 
comments electronically.
---------------------------------------------------------------------------

    Affected landowners and parties with environmental concerns may be 
granted intervenor status upon showing good cause by stating that they 
have a clear and direct interest in this proceeding which would not be 
adequately represented by any other parties. You do not need intervenor 
status to have your comments considered.
    Additional information about the project is available from the 
Commission's Office of External Affairs, at 1-866-208-FERC or on the 
FERC Internet Web site (https://www.ferc.gov) using the eLibrary link. 
Click on the eLibrary link, click on ``General Search'' and enter the 
docket number excluding the last three digits in the Docket Number 
field. Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission now offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries and direct links to 
the documents. Go to https://www.ferc.gov/esubscribenow.htm.

Kimberly D. Bose,
Secretary.